<?xml version="1.0" encoding="windows-1252"?>
<rss version="2.0" xmlns:tsw="http://www.tdot.state.tn.us/tdotsmartway/" xmlns:georss="http://www.georss.org/georss" xmlns:gml="http://www.opengis.net/gml">
  <channel>
    <date>06/20/2013</date>
    <time>02:47:26</time>
    <title>TDOT Smartway EVENTS</title>
    <description>TDOT Roadway EVENTS Listing</description>
    <link>http://www.tdot.state.tn.us/tdotsmartway/</link>
    <item>
      <title>state route 386 westbound in sumner county - between exit 7: callendar ln. / hendersonville and exit 6: sr-258 new shackle island rd. / hendersonville, interchange modification construction will cause temporary lane closures on weekdays. this work is expected to be completed by 8/13/2013. event </title>
      <link>http://maps.google.com/?q=36.3303977304234 -86.6124173651669(1 - SR-386 83 County, - 10-APR-12 - 13-AUG-13)</link>
      <description>State Route 386 westbound in Sumner County - Between EXIT 7: CALLENDAR LN. / HENDERSONVILLE and EXIT 6: SR-258 NEW SHACKLE ISLAND RD. / HENDERSONVILLE, interchange modification construction will cause temporary lane closures on weekdays. This work is expected to be completed by 8/13/2013.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_1</guid>
      <tsw:COUNTY tsw:countyname="83" tsw:countyid="83" tsw:REGION="3"/>
      <tsw:route tsw:segmentid="SR-386" tsw:routeid="SR-386" tsw:routename="SR-386"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="State Route 386 westbound in Sumner County - Between EXIT 7: CALLENDAR LN. / HENDERSONVILLE and EXIT 6: SR-258 NEW SHACKLE ISLAND RD. / HENDERSONVILLE, interchange modification construction will cause temporary lane closures on weekdays. This work is expected to be completed by 8/13/2013." tsw:event_no="330807" tsw:datecreated="04/10/2012 00:00:00" tsw:daterevised="06/12/2013 14:13:35">
        <tsw:BeginDate>04/10/2012 00:00:00</tsw:BeginDate>
        <tsw:EndDate>08/13/2013 00:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[State Route 386 westbound in Sumner County - Between EXIT 7: CALLENDAR LN. / HENDERSONVILLE and EXIT 6: SR-258 NEW SHACKLE ISLAND RD. / HENDERSONVILLE, interchange modification construction will cause temporary lane closures on weekdays. This work is expected to be completed by 8/13/2013.]]></tsw:Description>
        <curract><![CDATA[Monday June 17 through Friday June 21, 8PM-6AM, There will be alternating lane closures on SR 386 at Indian Lake Blvd. in order to paint the bridge, pour parapet, and pave.]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>1788101.98415922 727517.914552614</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>36.3303977304234 -86.6124173651669</marker>
    </item>
    <item>
      <title>state route 104 both directions in gibson county - between sr-188 (hwy.188) rt. &amp; (riverside-yorkville rd.) lt. and sr-457 rt., a widening project will temporarily slow traffic every day. this work is expected to be completed by 8/31/2014. event </title>
      <link>http://maps.google.com/?q=35.991213451212 -89.0403423136259(1 - SR-104 27 County, - 08-MAY-12 - 31-AUG-14)</link>
      <description>State Route 104 both directions in Gibson County - Between SR-188 (HWY.188) RT. &amp; (RIVERSIDE-YORKVILLE RD.) LT. and SR-457 RT., a widening project will temporarily slow traffic every day. This work is expected to be completed by 8/31/2014.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_2</guid>
      <tsw:COUNTY tsw:countyname="27" tsw:countyid="27" tsw:REGION="4"/>
      <tsw:route tsw:segmentid="SR-104" tsw:routeid="SR-104" tsw:routename="SR-104"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="State Route 104 both directions in Gibson County - Between SR-188 (HWY.188) RT. &amp;amp; (RIVERSIDE-YORKVILLE RD.) LT. and SR-457 RT., a widening project will temporarily slow traffic every day. This work is expected to be completed by 8/31/2014." tsw:event_no="354027" tsw:datecreated="05/08/2012 00:00:00" tsw:daterevised="06/13/2013 08:25:24">
        <tsw:BeginDate>05/08/2012 00:00:00</tsw:BeginDate>
        <tsw:EndDate>08/31/2014 00:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[State Route 104 both directions in Gibson County - Between SR-188 (HWY.188) RT. & (RIVERSIDE-YORKVILLE RD.) LT. and SR-457 RT., a widening project will temporarily slow traffic every day. This work is expected to be completed by 8/31/2014.]]></tsw:Description>
        <curract><![CDATA[WIDENING OF SR104. CONTRACTOR IS HAULING ROCK.  STRUCTURES ARE BEING BUILT.  TEMPORARY STOPPING TRAFFIC FOR EQUIPMENT TO CROSS HIGHWAY. TRAFFIC IS CURRENTLY RUNNING ON PART OF THE NEWLY CONSTRUCTED HWY. PHASE 1 AND PHASE 2 IS UNDER CONSTRUCTION. MESSAGE BOARDS ARE BEING USED.]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>1069218.10903208 617447.952789829</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>35.991213451212 -89.0403423136259</marker>
    </item>
    <item>
      <title>interstate 81 northbound in jefferson county - between i-40 rt. &amp; lt. / begin interstate-81 and mile marker 2 (mile marker: 2), interchange modification construction will result in a lane shift every day. this work is expected to be completed by 5/31/2013. event </title>
      <link>http://maps.google.com/?q=36.0769833520939 -83.3739637458869(1 - I-81 45 County, - 01-MAY-12 - 31-OCT-12)</link>
      <description>Interstate 81 northbound in Jefferson County - Between I-40 RT. &amp; LT. / BEGIN INTERSTATE-81 and MILE MARKER 2 (Mile Marker: 2), interchange modification construction will result in a lane shift every day. This work is expected to be completed by 5/31/2013.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_3</guid>
      <tsw:COUNTY tsw:countyname="45" tsw:countyid="45" tsw:REGION="1"/>
      <tsw:route tsw:segmentid="I-81" tsw:routeid="I-81" tsw:routename="I-81"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="Interstate 81 northbound in Jefferson County - Between I-40 RT. &amp;amp; LT. / BEGIN INTERSTATE-81 and MILE MARKER 2 (Mile Marker: 2), interchange modification construction will result in a lane shift every day. This work is expected to be completed by 5/31/2013." tsw:event_no="352688" tsw:datecreated="05/01/2012 00:00:00" tsw:daterevised="04/15/2013 08:42:16">
        <tsw:BeginDate>05/01/2012 00:00:00</tsw:BeginDate>
        <tsw:EndDate>10/31/2012 00:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[Interstate 81 northbound in Jefferson County - Between I-40 RT. & LT. / BEGIN INTERSTATE-81 and MILE MARKER 2 (Mile Marker: 2), interchange modification construction will result in a lane shift every day. This work is expected to be completed by 5/31/2013.]]></tsw:Description>
        <curract><![CDATA[The contractor has completed all road work at the ramps for the I-40/81 interchange and at the rest area at MM 2 on I-81, but there are still overhead sign structures to be repaired on this project. Crews will be onsite working on the overhead sign structures at MM 432 on I-40 in both the Eastbound &amp; Westbound directions as soon as work is scheduled. Crews will then remove the overhead signs structures to replace anchor bolts. A rolling roadblock will be required while crews take the signs down and when they reinstall them. Motorist should expect single lane closures intermittently as crews work on installing these new anchors.  
]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>2744431.22130008 645111.34239399</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>36.0769833520939 -83.3739637458869</marker>
    </item>
    <item>
      <title>interstate 40 both directions in wilson county - between mile marker 225 (mile marker: 225) and mile marker 232 (mile marker: 232), a widening project will cause temporary lane closures at night. this work is expected to be completed by 12/12/2013. event </title>
      <link>http://maps.google.com/?q=36.1771018811146 -86.4648987453452(1 - I-40 95 County, - 23-JAN-12 - 12-DEC-13)</link>
      <description>Interstate 40 both directions in Wilson County - Between MILE MARKER 225 (Mile Marker: 225) and MILE MARKER 232 (Mile Marker: 232), a widening project will cause temporary lane closures at night. This work is expected to be completed by 12/12/2013.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_4</guid>
      <tsw:COUNTY tsw:countyname="95" tsw:countyid="95" tsw:REGION="3"/>
      <tsw:route tsw:segmentid="I-40" tsw:routeid="I-40" tsw:routename="I-40"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="Interstate 40 both directions in Wilson County - Between MILE MARKER 225 (Mile Marker: 225) and MILE MARKER 232 (Mile Marker: 232), a widening project will cause temporary lane closures at night. This work is expected to be completed by 12/12/2013." tsw:event_no="304407" tsw:datecreated="01/23/2012 00:00:00" tsw:daterevised="06/13/2013 07:33:31">
        <tsw:BeginDate>01/23/2012 00:00:00</tsw:BeginDate>
        <tsw:EndDate>12/12/2013 00:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[Interstate 40 both directions in Wilson County - Between MILE MARKER 225 (Mile Marker: 225) and MILE MARKER 232 (Mile Marker: 232), a widening project will cause temporary lane closures at night. This work is expected to be completed by 12/12/2013.]]></tsw:Description>
        <curract><![CDATA[Thursday June 13 through Wednesday June 19, 8PM-5AM, There will be alternating lane closures on I-40 eastbound and westbound for asphalt patching and placement of barrier rail.  One lane will remain open in each direction.]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>1831290.64477799 671472.863272607</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>36.1771018811146 -86.4648987453452</marker>
    </item>
    <item>
      <title>state route 29 both directions in hamilton county - between i-124 back / (begin hwy-27  / in chattanooga) / {us-27} and sr-8 (signal mtn. rd.), a widening project will result in narrowed lanes every day. this work is expected to be completed by 12/31/2014. event </title>
      <link>http://maps.google.com/?q=35.0697521633741 -85.3197328839929(1 - SR-29 33 County, - 09-JAN-12 - 31-OCT-14)</link>
      <description>State Route 29 both directions in Hamilton County - Between I-124 BACK / (BEGIN HWY-27  / IN CHATTANOOGA) / {US-27} and SR-8 (SIGNAL MTN. RD.), a widening project will result in narrowed lanes every day. This work is expected to be completed by 12/31/2014.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_5</guid>
      <tsw:COUNTY tsw:countyname="33" tsw:countyid="33" tsw:REGION="2"/>
      <tsw:route tsw:segmentid="SR-29" tsw:routeid="SR-29" tsw:routename="SR-29"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="State Route 29 both directions in Hamilton County - Between I-124 BACK / (BEGIN HWY-27  / IN CHATTANOOGA) / {US-27} and SR-8 (SIGNAL MTN. RD.), a widening project will result in narrowed lanes every day. This work is expected to be completed by 12/31/2014." tsw:event_no="288067" tsw:datecreated="01/09/2012 00:00:00" tsw:daterevised="06/14/2013 14:08:38">
        <tsw:BeginDate>01/09/2012 00:00:00</tsw:BeginDate>
        <tsw:EndDate>10/31/2014 00:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[State Route 29 both directions in Hamilton County - Between I-124 BACK / (BEGIN HWY-27  / IN CHATTANOOGA) / {US-27} and SR-8 (SIGNAL MTN. RD.), a widening project will result in narrowed lanes every day. This work is expected to be completed by 12/31/2014.]]></tsw:Description>
        <curract><![CDATA[Weather permitting, the contractor will have lane closures throughout the project area on weeknights from 7PM to 6AM to perform road work.  They will also be working on retaining walls and bridges throughout the project area.  Should inclement weather prevent work from being performed, it will be rescheduled to take place at the earliest possible time.  During nighttime work, at least one lane will remain open in each direction.  THP will assist with traffic control on the project as necessary.]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>2172073.65082166 268774.242978901</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>35.0697521633741 -85.3197328839929</marker>
    </item>
    <item>
      <title>state route 9 both directions in cocke county - between leave sr-107 (state hwy.107) lt. and tennessee-north carolina state line, bridge repair will close the roadway every day. this work is expected to be completed by 4/30/2014. event </title>
      <link>http://maps.google.com/?q=35.9208625371428 -82.9441187191884(1 - SR-9 15 County, - 19-DEC-11 - 30-APR-14)</link>
      <description>State Route 9 both directions in Cocke County - Between LEAVE SR-107 (STATE HWY.107) LT. and TENNESSEE-NORTH CAROLINA STATE LINE, bridge repair will close the roadway every day. This work is expected to be completed by 4/30/2014.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_6</guid>
      <tsw:COUNTY tsw:countyname="15" tsw:countyid="15" tsw:REGION="1"/>
      <tsw:route tsw:segmentid="SR-9" tsw:routeid="SR-9" tsw:routename="SR-9"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="State Route 9 both directions in Cocke County - Between LEAVE SR-107 (STATE HWY.107) LT. and TENNESSEE-NORTH CAROLINA STATE LINE, bridge repair will close the roadway every day. This work is expected to be completed by 4/30/2014." tsw:event_no="318068" tsw:datecreated="12/19/2011 12:00:00" tsw:daterevised="01/18/2013 13:07:44">
        <tsw:BeginDate>12/19/2011 12:00:00</tsw:BeginDate>
        <tsw:EndDate>04/30/2014 12:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[State Route 9 both directions in Cocke County - Between LEAVE SR-107 (STATE HWY.107) LT. and TENNESSEE-NORTH CAROLINA STATE LINE, bridge repair will close the roadway every day. This work is expected to be completed by 4/30/2014.]]></tsw:Description>
        <curract><![CDATA[Repairs to historic Wolf Creek Bridge in Cocke County. Bridge is estimated to be closed until March of 2014.
Detour for passenger vehicles : 
From Newport on State Route 9/U.S. 25-70 to State Route 107, continue to State Route 70 (36 miles).
Detour for heavy vehicles :
From Newport on State Route 35/U.S. 321 to Greeneville, continue to State Route 70, then to Hot Springs, North Carolina (58 miles).
]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>2873176.06282085 591994.628752075</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>35.9208625371428 -82.9441187191884</marker>
    </item>
    <item>
      <title>state route 76 both directions in fayette county - between sr-57 (state hwy.59) rt. &amp; lt. / begin state hwy.76 / {in moscow} and sr-193 (macon rd. dr.) lt., bridge replacement construction will cause a reduction in lanes from two to one lane every day. this work is expected to be completed by 11/30/2013. event </title>
      <link>http://maps.google.com/?q=35.1091391840258 -89.3836027596396(1 - SR-76 24 County, - 14-OCT-11 - 30-NOV-13)</link>
      <description>State Route 76 both directions in Fayette County - Between SR-57 (STATE HWY.59) RT. &amp; LT. / BEGIN STATE HWY.76 / {IN MOSCOW} and SR-193 (MACON RD. DR.) LT., bridge replacement construction will cause a reduction in lanes from two to one lane every day. This work is expected to be completed by 11/30/2013.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_7</guid>
      <tsw:COUNTY tsw:countyname="24" tsw:countyid="24" tsw:REGION="4"/>
      <tsw:route tsw:segmentid="SR-76" tsw:routeid="SR-76" tsw:routename="SR-76"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="State Route 76 both directions in Fayette County - Between SR-57 (STATE HWY.59) RT. &amp;amp; LT. / BEGIN STATE HWY.76 / {IN MOSCOW} and SR-193 (MACON RD. DR.) LT., bridge replacement construction will cause a reduction in lanes from two to one lane every day. This work is expected to be completed by 11/30/2013." tsw:event_no="318207" tsw:datecreated="10/14/2011 00:00:00" tsw:daterevised="06/10/2013 08:26:04">
        <tsw:BeginDate>10/14/2011 00:00:00</tsw:BeginDate>
        <tsw:EndDate>11/30/2013 00:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[State Route 76 both directions in Fayette County - Between SR-57 (STATE HWY.59) RT. & LT. / BEGIN STATE HWY.76 / {IN MOSCOW} and SR-193 (MACON RD. DR.) LT., bridge replacement construction will cause a reduction in lanes from two to one lane every day. This work is expected to be completed by 11/30/2013.]]></tsw:Description>
        <curract><![CDATA[BRIDGE CONSTRUCTION IS ONGOING.  TRAVEL LANES ARE REDUCED TO ONE LANE WITH TRAFFIC CONTROL BEING MAINTAINED BY A TRAFFIC LIGHT. ]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>956627.509690085 299896.949263026</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>35.1091391840258 -89.3836027596396</marker>
    </item>
    <item>
      <title>state route 56 both directions in dekalb county - between sr-83 (honeysuckle rd.) lt. and dekalb-putnam county line, bridge repair will cause a reduction in lanes from two to one lane every day. this work is expected to be completed by 10/31/2013. event </title>
      <link>http://maps.google.com/?q=36.0237089145309 -85.7387261789016(1 - SR-56 21 County, - 28-DEC-10 - 31-OCT-13)</link>
      <description>State Route 56 both directions in DeKalb County - Between SR-83 (HONEYSUCKLE RD.) LT. and DEKALB-PUTNAM COUNTY LINE, bridge repair will cause a reduction in lanes from two to one lane every day. This work is expected to be completed by 10/31/2013.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_8</guid>
      <tsw:COUNTY tsw:countyname="21" tsw:countyid="21" tsw:REGION="2"/>
      <tsw:route tsw:segmentid="SR-56" tsw:routeid="SR-56" tsw:routename="SR-56"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="State Route 56 both directions in DeKalb County - Between SR-83 (HONEYSUCKLE RD.) LT. and DEKALB-PUTNAM COUNTY LINE, bridge repair will cause a reduction in lanes from two to one lane every day. This work is expected to be completed by 10/31/2013." tsw:event_no="306007" tsw:datecreated="12/28/2010 08:00:00" tsw:daterevised="06/11/2012 07:59:51">
        <tsw:BeginDate>12/28/2010 08:00:00</tsw:BeginDate>
        <tsw:EndDate>10/31/2013 16:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[State Route 56 both directions in DeKalb County - Between SR-83 (HONEYSUCKLE RD.) LT. and DEKALB-PUTNAM COUNTY LINE, bridge repair will cause a reduction in lanes from two to one lane every day. This work is expected to be completed by 10/31/2013.]]></tsw:Description>
        <curract><![CDATA[The rehabilitaion of the bridge on S.R.56 over the Caney Fork River (L.M. 15.40). The traffic on the bridge is one lane and contralled with signalization.   ]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>2045761.14261759 615410.561684348</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>36.0237089145309 -85.7387261789016</marker>
    </item>
    <item>
      <title>state route 30 both directions in mcminn county - between leave sr-39 new englewood rd. lt.  and sr-33 (n. tennessee av.) lt., a widening project will result in a lane shift every day. this work is expected to be completed by 11/15/2014. event </title>
      <link>http://maps.google.com/?q=35.3792481816176 -84.5594838822137(1 - SR-30 54 County, - 27-FEB-12 - 15-NOV-14)</link>
      <description>State Route 30 both directions in McMinn County - Between LEAVE SR-39 NEW ENGLEWOOD RD. LT.  and SR-33 (N. TENNESSEE AV.) LT., a widening project will result in a lane shift every day. This work is expected to be completed by 11/15/2014.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_9</guid>
      <tsw:COUNTY tsw:countyname="54" tsw:countyid="54" tsw:REGION="2"/>
      <tsw:route tsw:segmentid="SR-30" tsw:routeid="SR-30" tsw:routename="SR-30"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="State Route 30 both directions in McMinn County - Between LEAVE SR-39 NEW ENGLEWOOD RD. LT.  and SR-33 (N. TENNESSEE AV.) LT., a widening project will result in a lane shift every day. This work is expected to be completed by 11/15/2014." tsw:event_no="303967" tsw:datecreated="02/27/2012 00:00:00" tsw:daterevised="05/08/2013 07:59:49">
        <tsw:BeginDate>02/27/2012 00:00:00</tsw:BeginDate>
        <tsw:EndDate>11/15/2014 00:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[State Route 30 both directions in McMinn County - Between LEAVE SR-39 NEW ENGLEWOOD RD. LT.  and SR-33 (N. TENNESSEE AV.) LT., a widening project will result in a lane shift every day. This work is expected to be completed by 11/15/2014.]]></tsw:Description>
        <curract><![CDATA[The grading, drainage, construction of a concrete box beam
bridge, retaining wall and paving on S.R. 30 beginning at
County Road 609 and extending to the 4-lane section in
Etowah.  

The contractor installing the drain pipes.  There will be temporary lane closures.  The flaggers will be present to direct traffic.]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>2397912.12535603 383881.476597049</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>35.3792481816176 -84.5594838822137</marker>
    </item>
    <item>
      <title>state route 66 both directions in sevier county - between leave sr-338 (boyds creek hwy.) lt. and sr-139 (douglas dam rd.) rt. &amp; lt., a widening project will result in narrowed lanes every day. this work is expected to be completed by 10/31/2014. event </title>
      <link>http://maps.google.com/?q=35.9445057976823 -83.5838104008744(1 - SR-66 78 County, - 19-MAR-12 - 31-OCT-14)</link>
      <description>State Route 66 both directions in Sevier County - Between LEAVE SR-338 (BOYDS CREEK HWY.) LT. and SR-139 (DOUGLAS DAM RD.) RT. &amp; LT., a widening project will result in narrowed lanes every day. This work is expected to be completed by 10/31/2014.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_10</guid>
      <tsw:COUNTY tsw:countyname="78" tsw:countyid="78" tsw:REGION="1"/>
      <tsw:route tsw:segmentid="SR-66" tsw:routeid="SR-66" tsw:routename="SR-66"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="State Route 66 both directions in Sevier County - Between LEAVE SR-338 (BOYDS CREEK HWY.) LT. and SR-139 (DOUGLAS DAM RD.) RT. &amp;amp; LT., a widening project will result in narrowed lanes every day. This work is expected to be completed by 10/31/2014." tsw:event_no="313427" tsw:datecreated="03/19/2012 00:00:00" tsw:daterevised="03/28/2013 08:51:50">
        <tsw:BeginDate>03/19/2012 00:00:00</tsw:BeginDate>
        <tsw:EndDate>10/31/2014 00:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[State Route 66 both directions in Sevier County - Between LEAVE SR-338 (BOYDS CREEK HWY.) LT. and SR-139 (DOUGLAS DAM RD.) RT. & LT., a widening project will result in narrowed lanes every day. This work is expected to be completed by 10/31/2014.]]></tsw:Description>
        <curract><![CDATA[The contractor continues to focus efforts on the Northbound Bridge construction over the French Broad River.  Please be alert to crews as they also continue to relcoate utilities and complete grading activities.  ]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>2683630.13694771 595304.060978292</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>35.9445057976823 -83.5838104008744</marker>
    </item>
    <item>
      <title>state route 57 both directions in fayette county - between sr-196 (chulahoma rd.) rt. &amp; lt. and sr-194 (main st.) lt., construction work will result in a lane shift every day. this work is expected to be completed by 3/31/2013. event </title>
      <link>http://maps.google.com/?q=35.0437541632915 -89.5832019226978(1 - SR-57 24 County, - 18-NOV-11 - 31-MAR-13)</link>
      <description>State Route 57 both directions in Fayette County - Between SR-196 (CHULAHOMA RD.) RT. &amp; LT. and SR-194 (MAIN ST.) LT., construction work will result in a lane shift every day. This work is expected to be completed by 3/31/2013.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_11</guid>
      <tsw:COUNTY tsw:countyname="24" tsw:countyid="24" tsw:REGION="4"/>
      <tsw:route tsw:segmentid="SR-57" tsw:routeid="SR-57" tsw:routename="SR-57"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="State Route 57 both directions in Fayette County - Between SR-196 (CHULAHOMA RD.) RT. &amp;amp; LT. and SR-194 (MAIN ST.) LT., construction work will result in a lane shift every day. This work is expected to be completed by 3/31/2013." tsw:event_no="318028" tsw:datecreated="11/18/2011 06:00:00" tsw:daterevised="03/13/2013 10:18:23">
        <tsw:BeginDate>11/18/2011 06:00:00</tsw:BeginDate>
        <tsw:EndDate>03/31/2013 11:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[State Route 57 both directions in Fayette County - Between SR-196 (CHULAHOMA RD.) RT. & LT. and SR-194 (MAIN ST.) LT., construction work will result in a lane shift every day. This work is expected to be completed by 3/31/2013.]]></tsw:Description>
        <curract><![CDATA[No current activities. ]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>896091.772366525 278237.6129983</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>35.0437541632915 -89.5832019226978</marker>
    </item>
    <item>
      <title>state route 1 both directions in knox county - between sr-332 s. campbell station rd. rt. and sr-131 (lovell rd.) lt., intersection modification work will result in lane closures every day. this work is expected to be completed by 5/31/2013. event </title>
      <link>http://maps.google.com/?q=35.8882044690523 -84.1488200059923(1 - SR-1 47 County, - 23-SEP-11 - 31-MAY-13)</link>
      <description>State Route 1 both directions in Knox County - Between SR-332 S. CAMPBELL STATION RD. RT. and SR-131 (LOVELL RD.) LT., intersection modification work will result in lane closures every day. This work is expected to be completed by 5/31/2013.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_12</guid>
      <tsw:COUNTY tsw:countyname="47" tsw:countyid="47" tsw:REGION="1"/>
      <tsw:route tsw:segmentid="SR-1" tsw:routeid="SR-1" tsw:routename="SR-1"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="State Route 1 both directions in Knox County - Between SR-332 S. CAMPBELL STATION RD. RT. and SR-131 (LOVELL RD.) LT., intersection modification work will result in lane closures every day. This work is expected to be completed by 5/31/2013." tsw:event_no="353947" tsw:datecreated="09/23/2011 00:00:00" tsw:daterevised="03/28/2013 08:46:46">
        <tsw:BeginDate>09/23/2011 00:00:00</tsw:BeginDate>
        <tsw:EndDate>05/31/2013 00:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[State Route 1 both directions in Knox County - Between SR-332 S. CAMPBELL STATION RD. RT. and SR-131 (LOVELL RD.) LT., intersection modification work will result in lane closures every day. This work is expected to be completed by 5/31/2013.]]></tsw:Description>
        <curract><![CDATA[Work continues with bridge and roadway widening. Everett Road access is closed indefinitely. A detour has been established by the Town of Farragut using Hobbs Road.  Motorist are urged to reduce speed and use caution if they travel Hobbs Road. There is one lane open east and west bound. No wide loads allowed. Throughout the workzone the speed limit is reduced to 35 miles per hour. Workers are present and motorist are urged to reduce speed and use caution through the Work Zone.]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>2516812.40894143 571167.292416578</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>35.8882044690523 -84.1488200059923</marker>
    </item>
    <item>
      <title>state route 36 both directions in washington county - between sr-354 boones creek rd. lt. and sr-75 airport rd. rt. &amp; sr-75 bobby hicks memorial hwy. lt., a widening project will cause temporary lane closures on weekdays. this work is expected to be completed by 9/30/2014. event </title>
      <link>http://maps.google.com/?q=36.4149230859582 -82.4280649872017(1 - SR-36 90 County, - 30-JAN-12 - 30-SEP-14)</link>
      <description>State Route 36 both directions in Washington County - Between SR-354 BOONES CREEK RD. LT. and SR-75 AIRPORT RD. RT. &amp; SR-75 BOBBY HICKS MEMORIAL HWY. LT., a widening project will cause temporary lane closures on weekdays. This work is expected to be completed by 9/30/2014.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_13</guid>
      <tsw:COUNTY tsw:countyname="90" tsw:countyid="90" tsw:REGION="1"/>
      <tsw:route tsw:segmentid="SR-36" tsw:routeid="SR-36" tsw:routename="SR-36"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="State Route 36 both directions in Washington County - Between SR-354 BOONES CREEK RD. LT. and SR-75 AIRPORT RD. RT. &amp;amp; SR-75 BOBBY HICKS MEMORIAL HWY. LT., a widening project will cause temporary lane closures on weekdays. This work is expected to be completed by 9/30/2014." tsw:event_no="290169" tsw:datecreated="01/30/2012 06:00:00" tsw:daterevised="06/18/2013 14:55:39">
        <tsw:BeginDate>01/30/2012 06:00:00</tsw:BeginDate>
        <tsw:EndDate>09/30/2014 18:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[State Route 36 both directions in Washington County - Between SR-354 BOONES CREEK RD. LT. and SR-75 AIRPORT RD. RT. & SR-75 BOBBY HICKS MEMORIAL HWY. LT., a widening project will cause temporary lane closures on weekdays. This work is expected to be completed by 9/30/2014.]]></tsw:Description>
        <curract><![CDATA[The contractor has begun construction operations which will result in intermittent lane closures throughout the project length for the upcoming week.  Full road closures could possibly occur in the upcoming weeks to mobilize equipment on the job site and for blasting, these closures should not last more than a few minutes.  Boone Avenue is closed, motorists can access Boone Avenue via Roseview Drive.  Motorists are asked to use caution while traveling on this route.]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>3019325.01791753 776903.987878363</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>36.4149230859582 -82.4280649872017</marker>
    </item>
    <item>
      <title>state route 32 both directions in hamblen and jefferson counties - between jefferson-hamblen county line and jefferson-hamblen county line, interchange modification construction will cause temporary lane closures every day. this work is expected to be completed by 6/30/2014. event </title>
      <link>http://maps.google.com/?q=36.1324719017073 -83.2814741249288(1 - SR-32 45 County, - 13-JAN-12 - 30-JUN-14)</link>
      <description>State Route 32 both directions in Hamblen and Jefferson Counties - Between JEFFERSON-HAMBLEN COUNTY LINE and JEFFERSON-HAMBLEN COUNTY LINE, interchange modification construction will cause temporary lane closures every day. This work is expected to be completed by 6/30/2014.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_14</guid>
      <tsw:COUNTY tsw:countyname="45" tsw:countyid="45" tsw:REGION="1"/>
      <tsw:route tsw:segmentid="SR-32" tsw:routeid="SR-32" tsw:routename="SR-32"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="State Route 32 both directions in Hamblen and Jefferson Counties - Between JEFFERSON-HAMBLEN COUNTY LINE and JEFFERSON-HAMBLEN COUNTY LINE, interchange modification construction will cause temporary lane closures every day. This work is expected to be completed by 6/30/2014." tsw:event_no="287026" tsw:datecreated="01/13/2012 00:00:00" tsw:daterevised="06/11/2013 11:38:10">
        <tsw:BeginDate>01/13/2012 00:00:00</tsw:BeginDate>
        <tsw:EndDate>06/30/2014 00:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[State Route 32 both directions in Hamblen and Jefferson Counties - Between JEFFERSON-HAMBLEN COUNTY LINE and JEFFERSON-HAMBLEN COUNTY LINE, interchange modification construction will cause temporary lane closures every day. This work is expected to be completed by 6/30/2014.]]></tsw:Description>
        <curract><![CDATA[Motorists should be alert for new traffic patterns through this project.  US 25E is reduced to one lane in each direction approaching the bridge over I-81 and new traffic shifts are in place.  Motorists should be alert for workers present and use extreme caution in this area.

Motorists should be alert for possible lane closures and rolling roadblocks approaching this area between the hours of 8 a.m. and 4 p.m. as crews perform overhead bridge work in this area. Motorists should be alert for slow moving traffic and use extreme caution approaching this area.
]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>2771191.77513519 666049.226947879</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>36.1324719017073 -83.2814741249288</marker>
    </item>
    <item>
      <title>state route 32 both directions in hamblen and jefferson counties - between jefferson-hamblen county line and jefferson-hamblen county line, interchange modification construction will cause temporary lane closures every day. this work is expected to be completed by 6/30/2014. event </title>
      <link>http://maps.google.com/?q=36.1324719017073 -83.2814741249288(1 - SR-32 32 County, - 13-JAN-12 - 30-JUN-14)</link>
      <description>State Route 32 both directions in Hamblen and Jefferson Counties - Between JEFFERSON-HAMBLEN COUNTY LINE and JEFFERSON-HAMBLEN COUNTY LINE, interchange modification construction will cause temporary lane closures every day. This work is expected to be completed by 6/30/2014.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_15</guid>
      <tsw:COUNTY tsw:countyname="32" tsw:countyid="32" tsw:REGION="1"/>
      <tsw:route tsw:segmentid="SR-32" tsw:routeid="SR-32" tsw:routename="SR-32"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="State Route 32 both directions in Hamblen and Jefferson Counties - Between JEFFERSON-HAMBLEN COUNTY LINE and JEFFERSON-HAMBLEN COUNTY LINE, interchange modification construction will cause temporary lane closures every day. This work is expected to be completed by 6/30/2014." tsw:event_no="287026" tsw:datecreated="01/13/2012 00:00:00" tsw:daterevised="06/11/2013 11:38:10">
        <tsw:BeginDate>01/13/2012 00:00:00</tsw:BeginDate>
        <tsw:EndDate>06/30/2014 00:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[State Route 32 both directions in Hamblen and Jefferson Counties - Between JEFFERSON-HAMBLEN COUNTY LINE and JEFFERSON-HAMBLEN COUNTY LINE, interchange modification construction will cause temporary lane closures every day. This work is expected to be completed by 6/30/2014.]]></tsw:Description>
        <curract><![CDATA[Motorists should be alert for new traffic patterns through this project.  US 25E is reduced to one lane in each direction approaching the bridge over I-81 and new traffic shifts are in place.  Motorists should be alert for workers present and use extreme caution in this area.

Motorists should be alert for possible lane closures and rolling roadblocks approaching this area between the hours of 8 a.m. and 4 p.m. as crews perform overhead bridge work in this area. Motorists should be alert for slow moving traffic and use extreme caution approaching this area.
]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>2771342.88727662 666799.987917577</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>36.1324719017073 -83.2814741249288</marker>
    </item>
    <item>
      <title>state route 6 both directions in davidson and sumner counties - between  (mile marker: ) and sr-258 (new shackle island rd.) lt., bridge replacement construction will result in lane closures every day. this work is expected to be completed by 4/30/2014. event </title>
      <link>http://maps.google.com/?q=36.3063039192188 -86.6537356770563(1 - SR-6 19 County, - 10-NOV-11 - 15-JUL-13)</link>
      <description>State Route 6 both directions in Davidson and Sumner Counties - Between  (Mile Marker: ) and SR-258 (NEW SHACKLE ISLAND RD.) LT., bridge replacement construction will result in lane closures every day. This work is expected to be completed by 4/30/2014.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_16</guid>
      <tsw:COUNTY tsw:countyname="19" tsw:countyid="19" tsw:REGION="3"/>
      <tsw:route tsw:segmentid="SR-6" tsw:routeid="SR-6" tsw:routename="SR-6"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="State Route 6 both directions in Davidson and Sumner Counties - Between  (Mile Marker: ) and SR-258 (NEW SHACKLE ISLAND RD.) LT., bridge replacement construction will result in lane closures every day. This work is expected to be completed by 4/30/2014." tsw:event_no="279308" tsw:datecreated="11/10/2011 00:00:00" tsw:daterevised="06/12/2013 12:35:03">
        <tsw:BeginDate>11/10/2011 00:00:00</tsw:BeginDate>
        <tsw:EndDate>07/15/2013 00:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[State Route 6 both directions in Davidson and Sumner Counties - Between  (Mile Marker: ) and SR-258 (NEW SHACKLE ISLAND RD.) LT., bridge replacement construction will result in lane closures every day. This work is expected to be completed by 4/30/2014.]]></tsw:Description>
        <curract><![CDATA[From now through December 2013, Gallatin Rd. will be reduced to one lane in each direction in this area.

Thursday June 13 and Friday June 14, 9AM-3PM, There will be one lane closed on One Mile Pkwy. in order to remove the plates from the roadway and patch with asphalt.
]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>1761471.21171375 714064.228255718</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>36.3063039192188 -86.6537356770563</marker>
    </item>
    <item>
      <title>state route 6 both directions in davidson and sumner counties - between  (mile marker: ) and sr-258 (new shackle island rd.) lt., bridge replacement construction will result in lane closures every day. this work is expected to be completed by 4/30/2014. event </title>
      <link>http://maps.google.com/?q=36.3063039192188 -86.6537356770563(1 - SR-6 83 County, - 10-NOV-11 - 15-JUL-13)</link>
      <description>State Route 6 both directions in Davidson and Sumner Counties - Between  (Mile Marker: ) and SR-258 (NEW SHACKLE ISLAND RD.) LT., bridge replacement construction will result in lane closures every day. This work is expected to be completed by 4/30/2014.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_17</guid>
      <tsw:COUNTY tsw:countyname="83" tsw:countyid="83" tsw:REGION="3"/>
      <tsw:route tsw:segmentid="SR-6" tsw:routeid="SR-6" tsw:routename="SR-6"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="State Route 6 both directions in Davidson and Sumner Counties - Between  (Mile Marker: ) and SR-258 (NEW SHACKLE ISLAND RD.) LT., bridge replacement construction will result in lane closures every day. This work is expected to be completed by 4/30/2014." tsw:event_no="279308" tsw:datecreated="11/10/2011 00:00:00" tsw:daterevised="06/12/2013 12:35:03">
        <tsw:BeginDate>11/10/2011 00:00:00</tsw:BeginDate>
        <tsw:EndDate>07/15/2013 00:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[State Route 6 both directions in Davidson and Sumner Counties - Between  (Mile Marker: ) and SR-258 (NEW SHACKLE ISLAND RD.) LT., bridge replacement construction will result in lane closures every day. This work is expected to be completed by 4/30/2014.]]></tsw:Description>
        <curract><![CDATA[From now through December 2013, Gallatin Rd. will be reduced to one lane in each direction in this area.

Thursday June 13 and Friday June 14, 9AM-3PM, There will be one lane closed on One Mile Pkwy. in order to remove the plates from the roadway and patch with asphalt.
]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>1775872.55310639 718825.450658916</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>36.3063039192188 -86.6537356770563</marker>
    </item>
    <item>
      <title>state route 397 both directions in williamson county - between sr-106 / us-431 lewisburg pk. rt. &amp; lt. and sr-106 / us-431 hillsboro rd. rt. &amp; lt., construction work will cause temporary lane closures every day. this work is expected to be completed by 5/15/2014. event </title>
      <link>http://maps.google.com/?q=35.9366841014015 -86.8386533974934(1 - SR-397 94 County, - 03-NOV-11 - 15-MAY-14)</link>
      <description>State Route 397 both directions in Williamson County - Between SR-106 / US-431 LEWISBURG PK. RT. &amp; LT. and SR-106 / US-431 HILLSBORO RD. RT. &amp; LT., construction work will cause temporary lane closures every day. This work is expected to be completed by 5/15/2014.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_18</guid>
      <tsw:COUNTY tsw:countyname="94" tsw:countyid="94" tsw:REGION="3"/>
      <tsw:route tsw:segmentid="SR-397" tsw:routeid="SR-397" tsw:routename="SR-397"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="State Route 397 both directions in Williamson County - Between SR-106 / US-431 LEWISBURG PK. RT. &amp;amp; LT. and SR-106 / US-431 HILLSBORO RD. RT. &amp;amp; LT., construction work will cause temporary lane closures every day. This work is expected to be completed by 5/15/2014." tsw:event_no="277166" tsw:datecreated="11/03/2011 00:00:00" tsw:daterevised="06/12/2013 12:34:32">
        <tsw:BeginDate>11/03/2011 00:00:00</tsw:BeginDate>
        <tsw:EndDate>05/15/2014 00:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[State Route 397 both directions in Williamson County - Between SR-106 / US-431 LEWISBURG PK. RT. & LT. and SR-106 / US-431 HILLSBORO RD. RT. & LT., construction work will cause temporary lane closures every day. This work is expected to be completed by 5/15/2014.]]></tsw:Description>
        <curract><![CDATA[From now through December 2013, The inside lanes of Mack Hatcher Pkwy. in both directions approximately ½  west of the Franklin Rd intersection will be closed in order to  perform median work and work on the next phase of construction.

Thursday June 13 through Wednesday June 19, 9AM-3PM, There will be lane closures at the intersection of SR 96 and Mack Hatcher Pkwy. for utility work.

Thursday June 13 through Wednesday June 19, 9AM-3PM, There will be lane closures on the west side of Liberty Pike in order to work on sidewalks.
]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>1720233.53167521 584692.46052547</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>35.9366841014015 -86.8386533974934</marker>
    </item>
    <item>
      <title>state route 33 both directions in knox county - between sr-71 (chapman hwy.) rt. / begin chapman hwy. / {us-441} and sr-1[wb] (w. magnolia av.) rt., bridge repair will close the roadway every day. this work is expected to be completed by 6/30/2013. event </title>
      <link>http://maps.google.com/?q=35.9514560196864 -83.9146245868628(1 - SR-33 47 County, - 02-NOV-10 - 30-JUN-13)</link>
      <description>State Route 33 both directions in Knox County - Between SR-71 (CHAPMAN HWY.) RT. / BEGIN CHAPMAN HWY. / {US-441} and SR-1[WB] (W. MAGNOLIA AV.) RT., bridge repair will close the roadway every day. This work is expected to be completed by 6/30/2013.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_19</guid>
      <tsw:COUNTY tsw:countyname="47" tsw:countyid="47" tsw:REGION="1"/>
      <tsw:route tsw:segmentid="SR-33" tsw:routeid="SR-33" tsw:routename="SR-33"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="State Route 33 both directions in Knox County - Between SR-71 (CHAPMAN HWY.) RT. / BEGIN CHAPMAN HWY. / {US-441} and SR-1[WB] (W. MAGNOLIA AV.) RT., bridge repair will close the roadway every day. This work is expected to be completed by 6/30/2013." tsw:event_no="210567" tsw:datecreated="11/02/2010 00:00:00" tsw:daterevised="03/28/2013 08:52:13">
        <tsw:BeginDate>11/02/2010 00:00:00</tsw:BeginDate>
        <tsw:EndDate>06/30/2013 00:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[State Route 33 both directions in Knox County - Between SR-71 (CHAPMAN HWY.) RT. / BEGIN CHAPMAN HWY. / {US-441} and SR-1[WB] (W. MAGNOLIA AV.) RT., bridge repair will close the roadway every day. This work is expected to be completed by 6/30/2013.]]></tsw:Description>
        <curract><![CDATA[The Henley Bridge is closed to traffic due to construction. Motorists should follow signed detour route.]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>2585679.71394175 595581.647137877</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>35.9514560196864 -83.9146245868628</marker>
    </item>
    <item>
      <title>interstate 55 both directions in shelby county - between exit 8:  horn lake rd. and exit 10:  s. parkway, interchange modification construction will cause a reduction in lanes from three to two lanes every day. this work is expected to be completed by 06/30/2013. event </title>
      <link>http://maps.google.com/?q=35.0903236112973 -90.0766554708202(1 - I-55 79 County, - 14-APR-08 - 15-JUN-12)</link>
      <description>Interstate 55 both directions in Shelby County - Between EXIT 8:  HORN LAKE RD. and EXIT 10:  S. PARKWAY, interchange modification construction will cause a reduction in lanes from three to two lanes every day. This work is expected to be completed by 06/30/2013.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_20</guid>
      <tsw:COUNTY tsw:countyname="79" tsw:countyid="79" tsw:REGION="4"/>
      <tsw:route tsw:segmentid="I-55" tsw:routeid="I-55" tsw:routename="I-55"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="Interstate 55 both directions in Shelby County - Between EXIT 8:  HORN LAKE RD. and EXIT 10:  S. PARKWAY, interchange modification construction will cause a reduction in lanes from three to two lanes every day. This work is expected to be completed by 06/30/2013." tsw:event_no="239588" tsw:datecreated="04/14/2008 00:00:00" tsw:daterevised="05/14/2013 15:52:10">
        <tsw:BeginDate>04/14/2008 00:00:00</tsw:BeginDate>
        <tsw:EndDate>06/15/2012 00:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[Interstate 55 both directions in Shelby County - Between EXIT 8:  HORN LAKE RD. and EXIT 10:  S. PARKWAY, interchange modification construction will cause a reduction in lanes from three to two lanes every day. This work is expected to be completed by 06/30/2013.]]></tsw:Description>
        <curract><![CDATA[During the week of 5/20/13 to 5/24/13:  SB and NB I-55 inside and outside lanes from MM 9.0 to 8.0 – Intermittent lane closures during this week for placement of permanent striping on project. This includes not only I-55 SB and NB lanes but also Mallory Ave. and Riverport Rd.  There will be no lane closures from Noon, Friday, May 24, 2013, thru 6:00 AM, Tuesday, May 28, 2013.]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>749193.338180042 300953.207648085</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>35.0903236112973 -90.0766554708202</marker>
    </item>
    <item>
      <title>state route 106 both directions in marshall county - between sr-11 (cornersville hwy.) rt. &amp; lt. / begin s. ellington pkwy. / {us-31a / in lewisburg} and sr-50 (e. commerce st.) rt. &amp; lt. / begin n. ellington pkwy. / {us-31a/431}, a widening project will cause temporary lane closures every day. this work is expected to be completed by 05/31/2013. event </title>
      <link>http://maps.google.com/?q=35.4319426812096 -86.7823012511957(1 - SR-106 59 County, - 18-JAN-11 - 31-MAY-13)</link>
      <description>State Route 106 both directions in Marshall County - Between SR-11 (CORNERSVILLE HWY.) RT. &amp; LT. / BEGIN S. ELLINGTON PKWY. / {US-31A / IN LEWISBURG} and SR-50 (E. COMMERCE ST.) RT. &amp; LT. / BEGIN N. ELLINGTON PKWY. / {US-31A/431}, a widening project will cause temporary lane closures every day. This work is expected to be completed by 05/31/2013.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_21</guid>
      <tsw:COUNTY tsw:countyname="59" tsw:countyid="59" tsw:REGION="3"/>
      <tsw:route tsw:segmentid="SR-106" tsw:routeid="SR-106" tsw:routename="SR-106"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="State Route 106 both directions in Marshall County - Between SR-11 (CORNERSVILLE HWY.) RT. &amp;amp; LT. / BEGIN S. ELLINGTON PKWY. / {US-31A / IN LEWISBURG} and SR-50 (E. COMMERCE ST.) RT. &amp;amp; LT. / BEGIN N. ELLINGTON PKWY. / {US-31A/431}, a widening project will cause temporary lane closures every day. This work is expected to be completed by 05/31/2013." tsw:event_no="210114" tsw:datecreated="01/18/2011 06:00:00" tsw:daterevised="05/28/2013 16:21:28">
        <tsw:BeginDate>01/18/2011 06:00:00</tsw:BeginDate>
        <tsw:EndDate>05/31/2013 00:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[State Route 106 both directions in Marshall County - Between SR-11 (CORNERSVILLE HWY.) RT. & LT. / BEGIN S. ELLINGTON PKWY. / {US-31A / IN LEWISBURG} and SR-50 (E. COMMERCE ST.) RT. & LT. / BEGIN N. ELLINGTON PKWY. / {US-31A/431}, a widening project will cause temporary lane closures every day. This work is expected to be completed by 05/31/2013.]]></tsw:Description>
        <curract><![CDATA[Speed limit has been reduced to 35 m.p.h.  Motorists should be aware of paving operations.]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>1735446.48735343 400833.065157134</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>35.4319426812096 -86.7823012511957</marker>
    </item>
    <item>
      <title>interstate 240 eastbound in shelby county - between exit 16:  nonconnah parkway (mile marker: 17) and sr-23 walnut grove rd. lt. / center of underpass, a widening project will cause temporary lane closures every day. this work is expected to be completed by 6/30/2013. event </title>
      <link>http://maps.google.com/?q=35.1054552446209 -89.8699871471684(1 - I-240 79 County, - 21-FEB-11 - 30-JUN-13)</link>
      <description>Interstate 240 eastbound in Shelby County - Between EXIT 16:  NONCONNAH PARKWAY (Mile Marker: 17) and SR-23 WALNUT GROVE RD. LT. / CENTER OF UNDERPASS, a widening project will cause temporary lane closures every day. This work is expected to be completed by 6/30/2013.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_22</guid>
      <tsw:COUNTY tsw:countyname="79" tsw:countyid="79" tsw:REGION="4"/>
      <tsw:route tsw:segmentid="I-240" tsw:routeid="I-240" tsw:routename="I-240"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="Interstate 240 eastbound in Shelby County - Between EXIT 16:  NONCONNAH PARKWAY (Mile Marker: 17) and SR-23 WALNUT GROVE RD. LT. / CENTER OF UNDERPASS, a widening project will cause temporary lane closures every day. This work is expected to be completed by 6/30/2013." tsw:event_no="208188" tsw:datecreated="02/21/2011 00:00:00" tsw:daterevised="05/24/2013 15:43:59">
        <tsw:BeginDate>02/21/2011 00:00:00</tsw:BeginDate>
        <tsw:EndDate>06/30/2013 00:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[Interstate 240 eastbound in Shelby County - Between EXIT 16:  NONCONNAH PARKWAY (Mile Marker: 17) and SR-23 WALNUT GROVE RD. LT. / CENTER OF UNDERPASS, a widening project will cause temporary lane closures every day. This work is expected to be completed by 6/30/2013.]]></tsw:Description>
        <curract><![CDATA[   The installation of Noise Wall 2 from Walnut Grove south to Shady Grove is 98% complete. The contractor is currently dressing slopes in front of and behind this wall in preparation for sod. The paint/stain is also currently being applied to the community side of this wall. Noise barrier 1 caissons are currently being installed between Poplar Ave. and Shady Grove. Noise Wall 1 is approximately 65 % complete. The installation of base material as well as base asphalt has been installed on CD road 1 between BOP and Poplar Ave. Concrete paving for Permanent Ramp 15G ( Exit ramp from EB 240 to EB Poplar) has been installed. The gravity wall portion of wall 4 which lies along entrance ramp from WB Poplar to EB 240 is currently under construction. Temporary ramps at the Walnut Grove interchange have been installed and traffic has been routed to these temporary ramps. The removal of the old ramps at the Walnut Grove interchange has been completed with grading and base installation for new permanent ramps to begin within the next 2-3 weeks. Retaining wall 9 panel installation has begun on WB 240 between Walnut Grove and Shady Grove as well as installation of drainage structures. Retaining Wall 10 is 95 % complete. The relocation of gas line adjacent to the EB Poplar entrance ramp to travel WB 240 is completed. The installation of new ITS conduit is 70% complete and the installation underground electrical conduit is 20% complete. The footings for control centers have been installed and conduit installed for each. ]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>811191.426368553 303947.145454659</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>35.1054552446209 -89.8699871471684</marker>
    </item>
    <item>
      <title>state route 33 both directions in union county - between sr-170 (hickory valley rd.) lt. and union-claiborne county line, bridge replacement construction will result in a lane shift every day. this work is expected to be completed by 4/30/2014. event </title>
      <link>http://maps.google.com/?q=36.3284604953546 -83.7458712128853(1 - SR-33 87 County, - 04-NOV-09 - 30-JUN-12)</link>
      <description>State Route 33 both directions in Union County - Between SR-170 (HICKORY VALLEY RD.) LT. and UNION-CLAIBORNE COUNTY LINE, bridge replacement construction will result in a lane shift every day. This work is expected to be completed by 4/30/2014.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_23</guid>
      <tsw:COUNTY tsw:countyname="87" tsw:countyid="87" tsw:REGION="1"/>
      <tsw:route tsw:segmentid="SR-33" tsw:routeid="SR-33" tsw:routename="SR-33"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="State Route 33 both directions in Union County - Between SR-170 (HICKORY VALLEY RD.) LT. and UNION-CLAIBORNE COUNTY LINE, bridge replacement construction will result in a lane shift every day. This work is expected to be completed by 4/30/2014." tsw:event_no="210564" tsw:datecreated="11/04/2009 00:00:00" tsw:daterevised="03/28/2013 08:47:05">
        <tsw:BeginDate>11/04/2009 00:00:00</tsw:BeginDate>
        <tsw:EndDate>06/30/2012 00:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[State Route 33 both directions in Union County - Between SR-170 (HICKORY VALLEY RD.) LT. and UNION-CLAIBORNE COUNTY LINE, bridge replacement construction will result in a lane shift every day. This work is expected to be completed by 4/30/2014.]]></tsw:Description>
        <curract><![CDATA[The existing State Route 33 Bridge over Norris Lake has been posted with weight restrictions and is being strictly enforced. Load limits for 5 axle vehicles is 35 tons, 3 or 4 axle vehicles is 22 tons and 20 tons for 2 axle vehicles.]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>2632454.0815244 733894.778417052</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>36.3284604953546 -83.7458712128853</marker>
    </item>
    <item>
      <title>state route 62 both directions in knox county - between sr-131 (byington-beaver rd.) rt. &amp; lt. and i-75, a widening project will result in a lane shift every day. this work is expected to be completed by 12/31/2013. event </title>
      <link>http://maps.google.com/?q=35.9883394695383 -84.0470393250045(1 - SR-62 47 County, - 22-FEB-11 - 31-DEC-13)</link>
      <description>State Route 62 both directions in Knox County - Between SR-131 (BYINGTON-BEAVER RD.) RT. &amp; LT. and I-75, a widening project will result in a lane shift every day. This work is expected to be completed by 12/31/2013.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_24</guid>
      <tsw:COUNTY tsw:countyname="47" tsw:countyid="47" tsw:REGION="1"/>
      <tsw:route tsw:segmentid="SR-62" tsw:routeid="SR-62" tsw:routename="SR-62"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="State Route 62 both directions in Knox County - Between SR-131 (BYINGTON-BEAVER RD.) RT. &amp;amp; LT. and I-75, a widening project will result in a lane shift every day. This work is expected to be completed by 12/31/2013." tsw:event_no="210554" tsw:datecreated="02/22/2011 00:00:00" tsw:daterevised="03/28/2013 08:51:24">
        <tsw:BeginDate>02/22/2011 00:00:00</tsw:BeginDate>
        <tsw:EndDate>12/31/2013 00:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[State Route 62 both directions in Knox County - Between SR-131 (BYINGTON-BEAVER RD.) RT. & LT. and I-75, a widening project will result in a lane shift every day. This work is expected to be completed by 12/31/2013.]]></tsw:Description>
        <curract><![CDATA[Motorists on Western Avenue/Oak Ridge Highway between Copper Kettle Road and Schaad Road should be alert for workers and equipment through this construction project. Several sections of roads that intersect with State Route 62 throughout the length of this project are closed to thru traffic and detours are in place. These roads include: Ball Camp Pike (Southeast intersection with State Route 62 near Schaad Road);Summerfield Road;Wood-Smith Road;Raj Road;West Ball Camp Pike;Hinton Road. Motorists should be alert for changing traffic conditions, detours, traffic shifts and use caution through this area. Beaver Ridge Road at Western Avenue will be closed to allow for the construction of a temporary runaround.]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>2546228.22991147 608196.695377901</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>35.9883394695383 -84.0470393250045</marker>
    </item>
    <item>
      <title>state route 57 both directions in shelby county - between  (mile marker: ) and  (mile marker: ), a widening project will result in lane closures every day. this work is expected to be completed by 07/15/2013. event </title>
      <link>http://maps.google.com/?q=35.0779411714913 -89.7790507975274(1 - SR-57 79 County, - 09-MAR-11 - 30-JUN-12)</link>
      <description>State Route 57 both directions in Shelby County - Between  (Mile Marker: ) and  (Mile Marker: ), a widening project will result in lane closures every day. This work is expected to be completed by 07/15/2013.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_25</guid>
      <tsw:COUNTY tsw:countyname="79" tsw:countyid="79" tsw:REGION="4"/>
      <tsw:route tsw:segmentid="SR-57" tsw:routeid="SR-57" tsw:routename="SR-57"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="State Route 57 both directions in Shelby County - Between  (Mile Marker: ) and  (Mile Marker: ), a widening project will result in lane closures every day. This work is expected to be completed by 07/15/2013." tsw:event_no="188008" tsw:datecreated="03/09/2011 00:00:00" tsw:daterevised="06/06/2013 14:24:02">
        <tsw:BeginDate>03/09/2011 00:00:00</tsw:BeginDate>
        <tsw:EndDate>06/30/2012 00:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[State Route 57 both directions in Shelby County - Between  (Mile Marker: ) and  (Mile Marker: ), a widening project will result in lane closures every day. This work is expected to be completed by 07/15/2013.]]></tsw:Description>
        <curract><![CDATA[Grading, drainage, and paving of Poplar Avenue (US 72/SR 57), will cause intermittent lane closures in each direction between Miller Farms Road and Dogwood Road. During construction, additional lanes will be added at locations to allow for three permanent lanes in each direction to run the length of the project.
Also, intermittent closures may be used as needed. At least one lane will remain open at all times. ]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>837985.381580068 292876.923571519</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>35.0779411714913 -89.7790507975274</marker>
    </item>
    <item>
      <title>state route 75 both directions in washington county - between i-181 (us/hwy-23) / {center of overhead} and sr-36 (state hwy-36) rt. &amp; lt. / begin state hwy-75, a widening project will result in a lane shift on weekdays. this work is expected to be completed by 9/30/2013. event </title>
      <link>http://maps.google.com/?q=36.4230152097582 -82.4637910307264(1 - SR-75 90 County, - 13-APR-11 - 31-MAY-13)</link>
      <description>State Route 75 both directions in Washington County - Between I-181 (US/HWY-23) / {CENTER OF OVERHEAD} and SR-36 (STATE HWY-36) RT. &amp; LT. / BEGIN STATE HWY-75, a widening project will result in a lane shift on weekdays. This work is expected to be completed by 9/30/2013.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_26</guid>
      <tsw:COUNTY tsw:countyname="90" tsw:countyid="90" tsw:REGION="1"/>
      <tsw:route tsw:segmentid="SR-75" tsw:routeid="SR-75" tsw:routename="SR-75"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="State Route 75 both directions in Washington County - Between I-181 (US/HWY-23) / {CENTER OF OVERHEAD} and SR-36 (STATE HWY-36) RT. &amp;amp; LT. / BEGIN STATE HWY-75, a widening project will result in a lane shift on weekdays. This work is expected to be completed by 9/30/2013." tsw:event_no="210590" tsw:datecreated="04/13/2011 00:00:00" tsw:daterevised="06/18/2013 14:56:44">
        <tsw:BeginDate>04/13/2011 00:00:00</tsw:BeginDate>
        <tsw:EndDate>05/31/2013 00:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[State Route 75 both directions in Washington County - Between I-181 (US/HWY-23) / {CENTER OF OVERHEAD} and SR-36 (STATE HWY-36) RT. & LT. / BEGIN STATE HWY-75, a widening project will result in a lane shift on weekdays. This work is expected to be completed by 9/30/2013.]]></tsw:Description>
        <curract><![CDATA[Intermittent lane closures will be implemented in the North and South bound lanes throughout the construction project.  The contractor has changed the traffic pattern on to the new asphalt beginning at the SR36 intersection and extending to Herron Dr. both lanes will be shifted onto the new lanes.  Motorists should use caution in this area and pay attention to posted traffic advisories.]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>3008712.97121787 779466.434120221</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>36.4230152097582 -82.4637910307264</marker>
    </item>
    <item>
      <title>state route 99 both directions in lewis county - between leave sr-20 w. main st. lt. and lewis-maury county line, a widening project will result in a lane shift on weekdays. this work is expected to be completed by 10/31/2013. event </title>
      <link>http://maps.google.com/?q=35.5837192534519 -87.442850529395(1 - SR-99 51 County, - 16-JUN-11 - 31-OCT-13)</link>
      <description>State Route 99 both directions in Lewis County - Between LEAVE SR-20 W. MAIN ST. LT. and LEWIS-MAURY COUNTY LINE, a widening project will result in a lane shift on weekdays. This work is expected to be completed by 10/31/2013.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_27</guid>
      <tsw:COUNTY tsw:countyname="51" tsw:countyid="51" tsw:REGION="3"/>
      <tsw:route tsw:segmentid="SR-99" tsw:routeid="SR-99" tsw:routename="SR-99"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="State Route 99 both directions in Lewis County - Between LEAVE SR-20 W. MAIN ST. LT. and LEWIS-MAURY COUNTY LINE, a widening project will result in a lane shift on weekdays. This work is expected to be completed by 10/31/2013." tsw:event_no="207110" tsw:datecreated="06/16/2011 06:00:00" tsw:daterevised="06/06/2013 10:03:47">
        <tsw:BeginDate>06/16/2011 06:00:00</tsw:BeginDate>
        <tsw:EndDate>10/31/2013 18:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[State Route 99 both directions in Lewis County - Between LEAVE SR-20 W. MAIN ST. LT. and LEWIS-MAURY COUNTY LINE, a widening project will result in a lane shift on weekdays. This work is expected to be completed by 10/31/2013.]]></tsw:Description>
        <curract><![CDATA[Now through October 31st 2013, the roadway will be under construction for widening the road from two lanes to four.  Speed limit is going to be reduced to 45mph and motorists should be advised.  Motorists are cautioned to be alert for workers and equipment in this area.]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>1539489.26246473 458310.048430614</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>35.5837192534519 -87.442850529395</marker>
    </item>
    <item>
      <title>state route 325 both directions in pickett county - between sr-325(wb) s. main st. lt. and  (mile marker: ), bridge repair will temporarily slow traffic on weekdays. this work is expected to be completed by 9/30/2011. event </title>
      <link>http://maps.google.com/?q=36.5560668667895 -85.0809674682218(1 - SR-325 69 County, - 13-AUG-10 - 31-MAY-11)</link>
      <description>State Route 325 both directions in Pickett County - Between SR-325(WB) S. MAIN ST. LT. and  (Mile Marker: ), bridge repair will temporarily slow traffic on weekdays. This work is expected to be completed by 9/30/2011.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_28</guid>
      <tsw:COUNTY tsw:countyname="69" tsw:countyid="69" tsw:REGION="2"/>
      <tsw:route tsw:segmentid="SR-325" tsw:routeid="SR-325" tsw:routename="SR-325"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="State Route 325 both directions in Pickett County - Between SR-325(WB) S. MAIN ST. LT. and  (Mile Marker: ), bridge repair will temporarily slow traffic on weekdays. This work is expected to be completed by 9/30/2011." tsw:event_no="170286" tsw:datecreated="08/13/2010 00:00:00" tsw:daterevised="09/18/2012 11:33:34">
        <tsw:BeginDate>08/13/2010 00:00:00</tsw:BeginDate>
        <tsw:EndDate>05/31/2011 00:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[State Route 325 both directions in Pickett County - Between SR-325(WB) S. MAIN ST. LT. and  (Mile Marker: ), bridge repair will temporarily slow traffic on weekdays. This work is expected to be completed by 9/30/2011.]]></tsw:Description>
        <curract><![CDATA[The Contractor is not actively working on the project due to delays associated with utilities and right of way.]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>2238443.04574136 810379.635517517</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>36.5560668667895 -85.0809674682218</marker>
    </item>
    <item>
      <title>state route 15(us-64) both directions in hardeman county - between  (mile marker: ) and  (mile marker: ), a widening project will result in a lane shift on weekdays. this work is expected to be completed by 10/31/2014. event </title>
      <link>http://maps.google.com/?q=35.2387478502416 -88.8910752559743(1 - SR-15 35 County, - 23-SEP-10 - 31-OCT-14)</link>
      <description>State Route 15(US-64) both directions in Hardeman County - Between  (Mile Marker: ) and  (Mile Marker: ), a widening project will result in a lane shift on weekdays. This work is expected to be completed by 10/31/2014.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_29</guid>
      <tsw:COUNTY tsw:countyname="35" tsw:countyid="35" tsw:REGION="4"/>
      <tsw:route tsw:segmentid="SR-15" tsw:routeid="SR-15" tsw:routename="SR-15"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="State Route 15(US-64) both directions in Hardeman County - Between  (Mile Marker: ) and  (Mile Marker: ), a widening project will result in a lane shift on weekdays. This work is expected to be completed by 10/31/2014." tsw:event_no="166595" tsw:datecreated="09/23/2010 00:00:00" tsw:daterevised="06/10/2013 08:25:44">
        <tsw:BeginDate>09/23/2010 00:00:00</tsw:BeginDate>
        <tsw:EndDate>10/31/2014 00:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[State Route 15(US-64) both directions in Hardeman County - Between  (Mile Marker: ) and  (Mile Marker: ), a widening project will result in a lane shift on weekdays. This work is expected to be completed by 10/31/2014.]]></tsw:Description>
        <curract><![CDATA[BRIDGE WORK TAKING PLACE ON SOUTH SIDE OF JOB. TRAFFIC SHIFTED TO THE PROPOSED WESTBOUND LANES.]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>1105265.67079695 342331.227711076</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>35.2387478502416 -88.8910752559743</marker>
    </item>
    <item>
      <title>state route 52 both directions in fentress county - between pickett-fentress county line  and sr-154 (west cove rd.) lt., bridge replacement construction will temporarily slow traffic on weekdays. this work is expected to be completed by 9/30/2011. event </title>
      <link>http://maps.google.com/?q=36.4196002919236 -85.0281423759708(1 - SR-52 25 County, - 17-AUG-10 - 30-SEP-11)</link>
      <description>State Route 52 both directions in Fentress County - Between PICKETT-FENTRESS COUNTY LINE  and SR-154 (WEST COVE RD.) LT., bridge replacement construction will temporarily slow traffic on weekdays. This work is expected to be completed by 9/30/2011.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_30</guid>
      <tsw:COUNTY tsw:countyname="25" tsw:countyid="25" tsw:REGION="2"/>
      <tsw:route tsw:segmentid="SR-52" tsw:routeid="SR-52" tsw:routename="SR-52"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="State Route 52 both directions in Fentress County - Between PICKETT-FENTRESS COUNTY LINE  and SR-154 (WEST COVE RD.) LT., bridge replacement construction will temporarily slow traffic on weekdays. This work is expected to be completed by 9/30/2011." tsw:event_no="170308" tsw:datecreated="08/17/2010 00:00:00" tsw:daterevised="07/08/2011 14:14:32">
        <tsw:BeginDate>08/17/2010 00:00:00</tsw:BeginDate>
        <tsw:EndDate>09/30/2011 00:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[State Route 52 both directions in Fentress County - Between PICKETT-FENTRESS COUNTY LINE  and SR-154 (WEST COVE RD.) LT., bridge replacement construction will temporarily slow traffic on weekdays. This work is expected to be completed by 9/30/2011.]]></tsw:Description>
        <curract><![CDATA[The Contractor is constructing the new roadway.  Motorists should use caution while traveling thru the project, construction equipment will be entering and leaving the project.]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>2254451.97847823 760848.221717901</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>36.4196002919236 -85.0281423759708</marker>
    </item>
    <item>
      <title>interstate 24 westbound in marion county - between mile marker  153 (mile marker: 153) and mile marker  151 (mile marker: 151), bridge replacement construction will cause temporary lane closures every day. this work is expected to be completed by 02/28/2013. event </title>
      <link>http://maps.google.com/?q=35.0401561719241 -85.6910250074924(1 - I-24 58 County, - 23-AUG-10 - 30-SEP-12)</link>
      <description>Interstate 24 westbound in Marion County - Between MILE MARKER  153 (Mile Marker: 153) and MILE MARKER  151 (Mile Marker: 151), bridge replacement construction will cause temporary lane closures every day. This work is expected to be completed by 02/28/2013.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_31</guid>
      <tsw:COUNTY tsw:countyname="58" tsw:countyid="58" tsw:REGION="2"/>
      <tsw:route tsw:segmentid="I-24" tsw:routeid="I-24" tsw:routename="I-24"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="Interstate 24 westbound in Marion County - Between MILE MARKER  153 (Mile Marker: 153) and MILE MARKER  151 (Mile Marker: 151), bridge replacement construction will cause temporary lane closures every day. This work is expected to be completed by 02/28/2013." tsw:event_no="156630" tsw:datecreated="08/23/2010 18:00:00" tsw:daterevised="02/12/2013 08:10:50">
        <tsw:BeginDate>08/23/2010 18:00:00</tsw:BeginDate>
        <tsw:EndDate>09/30/2012 06:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[Interstate 24 westbound in Marion County - Between MILE MARKER  153 (Mile Marker: 153) and MILE MARKER  151 (Mile Marker: 151), bridge replacement construction will cause temporary lane closures every day. This work is expected to be completed by 02/28/2013.]]></tsw:Description>
        <curract><![CDATA[The contractor for this project is working on the Right Shoulder West Bound rerpairing a slide on the slope. The speed limit has been reduced to 50 MPH through the construction work zone. Motorists are encouraged to use caution as they pass through the construction work zone.]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>2060997.05576211 257439.936548634</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>35.0401561719241 -85.6910250074924</marker>
    </item>
    <item>
      <title>state route 194 both directions in fayette county - between sr-57 rt. &amp; lt. / (begin main st. / in rossville) and sr-59 (hwy.59) rt. &amp; lt., bridge replacement construction will cause a reduction in lanes from two to one lane every day. this work is expected to be completed by 6/30/2013. event </title>
      <link>http://maps.google.com/?q=35.1827488155204 -89.514665461574(1 - SR-194 24 County, - 28-JUN-10 - 30-JUN-13)</link>
      <description>State Route 194 both directions in Fayette County - Between SR-57 RT. &amp; LT. / (BEGIN MAIN ST. / IN ROSSVILLE) and SR-59 (HWY.59) RT. &amp; LT., bridge replacement construction will cause a reduction in lanes from two to one lane every day. This work is expected to be completed by 6/30/2013.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_32</guid>
      <tsw:COUNTY tsw:countyname="24" tsw:countyid="24" tsw:REGION="4"/>
      <tsw:route tsw:segmentid="SR-194" tsw:routeid="SR-194" tsw:routename="SR-194"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="State Route 194 both directions in Fayette County - Between SR-57 RT. &amp;amp; LT. / (BEGIN MAIN ST. / IN ROSSVILLE) and SR-59 (HWY.59) RT. &amp;amp; LT., bridge replacement construction will cause a reduction in lanes from two to one lane every day. This work is expected to be completed by 6/30/2013." tsw:event_no="155987" tsw:datecreated="06/28/2010 00:00:00" tsw:daterevised="06/06/2013 14:04:35">
        <tsw:BeginDate>06/28/2010 00:00:00</tsw:BeginDate>
        <tsw:EndDate>06/30/2013 00:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[State Route 194 both directions in Fayette County - Between SR-57 RT. & LT. / (BEGIN MAIN ST. / IN ROSSVILLE) and SR-59 (HWY.59) RT. & LT., bridge replacement construction will cause a reduction in lanes from two to one lane every day. This work is expected to be completed by 6/30/2013.]]></tsw:Description>
        <curract><![CDATA[This project is the replacement of 6 bridges on SR194 at LM 0.72, 0.81, 1.06, 1.18, 8.51, and 9.27.  Construction has begun on all segments of this project. SR194 is down to one lane with a temporary traffic signal at the wolf river and overflow bridges.  Construction activities are completed at the bridges at LM 8.51 and 9.27.  ]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>918411.517542104 328054.421059301</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>35.1827488155204 -89.514665461574</marker>
    </item>
    <item>
      <title>state route 52 both directions in clay county - between sr-51 (tompkinsville hwy.) lt. and pick-up sr-53 (dale hollow hwy.) lt., construction work will temporarily slow traffic on weekdays. this work is expected to be completed by 11/30/2010. event </title>
      <link>http://maps.google.com/?q=36.5812823679147 -85.5593341928785(1 - SR-52 14 County, - 02-OCT-09 - 30-NOV-10)</link>
      <description>State Route 52 both directions in Clay County - Between SR-51 (TOMPKINSVILLE HWY.) LT. and PICK-UP SR-53 (DALE HOLLOW HWY.) LT., construction work will temporarily slow traffic on weekdays. This work is expected to be completed by 11/30/2010.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_33</guid>
      <tsw:COUNTY tsw:countyname="14" tsw:countyid="14" tsw:REGION="2"/>
      <tsw:route tsw:segmentid="SR-52" tsw:routeid="SR-52" tsw:routename="SR-52"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="State Route 52 both directions in Clay County - Between SR-51 (TOMPKINSVILLE HWY.) LT. and PICK-UP SR-53 (DALE HOLLOW HWY.) LT., construction work will temporarily slow traffic on weekdays. This work is expected to be completed by 11/30/2010." tsw:event_no="127450" tsw:datecreated="10/02/2009 07:00:00" tsw:daterevised="07/08/2011 14:19:55">
        <tsw:BeginDate>10/02/2009 07:00:00</tsw:BeginDate>
        <tsw:EndDate>11/30/2010 19:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[State Route 52 both directions in Clay County - Between SR-51 (TOMPKINSVILLE HWY.) LT. and PICK-UP SR-53 (DALE HOLLOW HWY.) LT., construction work will temporarily slow traffic on weekdays. This work is expected to be completed by 11/30/2010.]]></tsw:Description>
        <curract><![CDATA[No work is being performed on the project.  The Contractor is awaiting plans revisions and right of way delays. Motorists should use caution while traveling thru the project.]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>2097894.79565696 818584.037037017</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>36.5812823679147 -85.5593341928785</marker>
    </item>
    <item>
      <title>state route 52 both directions in overton county - between  (mile marker: ) and  (mile marker: ), drainage work will cause temporary lane closures every day. this work is expected to be completed by 11/30/2012. event </title>
      <link>http://maps.google.com/?q=36.4947572980739 -85.4148248368846(1 - SR-52 67 County, - 04-DEC-09 - 30-NOV-12)</link>
      <description>State Route 52 both directions in Overton County - Between  (Mile Marker: ) and  (Mile Marker: ), drainage work will cause temporary lane closures every day. This work is expected to be completed by 11/30/2012.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_34</guid>
      <tsw:COUNTY tsw:countyname="67" tsw:countyid="67" tsw:REGION="2"/>
      <tsw:route tsw:segmentid="SR-52" tsw:routeid="SR-52" tsw:routename="SR-52"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="State Route 52 both directions in Overton County - Between  (Mile Marker: ) and  (Mile Marker: ), drainage work will cause temporary lane closures every day. This work is expected to be completed by 11/30/2012." tsw:event_no="127452" tsw:datecreated="12/04/2009 06:00:00" tsw:daterevised="07/08/2011 14:17:36">
        <tsw:BeginDate>12/04/2009 06:00:00</tsw:BeginDate>
        <tsw:EndDate>11/30/2012 19:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[State Route 52 both directions in Overton County - Between  (Mile Marker: ) and  (Mile Marker: ), drainage work will cause temporary lane closures every day. This work is expected to be completed by 11/30/2012.]]></tsw:Description>
        <curract><![CDATA[Grading operations on this project are active, all roads and side roads are open. Motorists should use caution and be alert to construction vehicles entering and leaving the project.]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>2140515.6782327 787304.984484922</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>36.4947572980739 -85.4148248368846</marker>
    </item>
    <item>
      <title>state route 52 both directions in clay county - between leave sr-53 (gainesboro hwy.) rt. and clay-overton county line, drainage work will cause temporary lane closures every day. this work is expected to be completed by 11/30/2012. event </title>
      <link>http://maps.google.com/?q=36.5112954279647 -85.4645683393022(1 - SR-52 14 County, - 04-DEC-09 - 30-NOV-12)</link>
      <description>State Route 52 both directions in Clay County - Between LEAVE SR-53 (GAINESBORO HWY.) RT. and CLAY-OVERTON COUNTY LINE, drainage work will cause temporary lane closures every day. This work is expected to be completed by 11/30/2012.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_35</guid>
      <tsw:COUNTY tsw:countyname="14" tsw:countyid="14" tsw:REGION="2"/>
      <tsw:route tsw:segmentid="SR-52" tsw:routeid="SR-52" tsw:routename="SR-52"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="State Route 52 both directions in Clay County - Between LEAVE SR-53 (GAINESBORO HWY.) RT. and CLAY-OVERTON COUNTY LINE, drainage work will cause temporary lane closures every day. This work is expected to be completed by 11/30/2012." tsw:event_no="127451" tsw:datecreated="12/04/2009 06:00:00" tsw:daterevised="07/08/2011 14:17:12">
        <tsw:BeginDate>12/04/2009 06:00:00</tsw:BeginDate>
        <tsw:EndDate>11/30/2012 19:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[State Route 52 both directions in Clay County - Between LEAVE SR-53 (GAINESBORO HWY.) RT. and CLAY-OVERTON COUNTY LINE, drainage work will cause temporary lane closures every day. This work is expected to be completed by 11/30/2012.]]></tsw:Description>
        <curract><![CDATA[Grading operations on this project are active, all roads and side roads are open. Motorists should use caution and be alert to construction vehicles entering and leaving the project.]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>2125860.49490986 793242.293760815</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>36.5112954279647 -85.4645683393022</marker>
    </item>
    <item>
      <title>state route 1 both directions in warren county - between leave sr-287 (green hill rd.) lt. and  (mile marker: ), construction work will result in lane closures on weekdays. this work is expected to be completed by 8/31/2011. event </title>
      <link>http://maps.google.com/?q=35.708243424689 -85.8635181798255(1 - SR-1 89 County, - 27-MAY-09 - 31-AUG-11)</link>
      <description>State Route 1 both directions in Warren County - Between LEAVE SR-287 (GREEN HILL RD.) LT. and  (Mile Marker: ), construction work will result in lane closures on weekdays. This work is expected to be completed by 8/31/2011.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_36</guid>
      <tsw:COUNTY tsw:countyname="89" tsw:countyid="89" tsw:REGION="2"/>
      <tsw:route tsw:segmentid="SR-1" tsw:routeid="SR-1" tsw:routename="SR-1"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="State Route 1 both directions in Warren County - Between LEAVE SR-287 (GREEN HILL RD.) LT. and  (Mile Marker: ), construction work will result in lane closures on weekdays. This work is expected to be completed by 8/31/2011." tsw:event_no="99397" tsw:datecreated="05/27/2009 18:00:00" tsw:daterevised="06/11/2012 08:00:15">
        <tsw:BeginDate>05/27/2009 18:00:00</tsw:BeginDate>
        <tsw:EndDate>08/31/2011 00:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[State Route 1 both directions in Warren County - Between LEAVE SR-287 (GREEN HILL RD.) LT. and  (Mile Marker: ), construction work will result in lane closures on weekdays. This work is expected to be completed by 8/31/2011.]]></tsw:Description>
        <curract><![CDATA[Grading operation on this project is active, all roads and side roads are open. Motorists should use caution and be alert to construction vehicles on the project. ]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>2009019.14181834 500502.593815964</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>35.708243424689 -85.8635181798255</marker>
    </item>
    <item>
      <title>state route 33 both directions in polk county - between sr-314 (parksville rd.) rt. and sr-30 (hwy.30) rt. &amp; lt., a widening project will result in a lane shift every day. this work is expected to be completed by 11/30/2013. event </title>
      <link>http://maps.google.com/?q=35.2057364783574 -84.6115315341788(1 - SR-33 70 County, - 28-MAY-09 - 30-NOV-13)</link>
      <description>State Route 33 both directions in Polk County - Between SR-314 (PARKSVILLE RD.) RT. and SR-30 (HWY.30) RT. &amp; LT., a widening project will result in a lane shift every day. This work is expected to be completed by 11/30/2013.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_37</guid>
      <tsw:COUNTY tsw:countyname="70" tsw:countyid="70" tsw:REGION="2"/>
      <tsw:route tsw:segmentid="SR-33" tsw:routeid="SR-33" tsw:routename="SR-33"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="State Route 33 both directions in Polk County - Between SR-314 (PARKSVILLE RD.) RT. and SR-30 (HWY.30) RT. &amp;amp; LT., a widening project will result in a lane shift every day. This work is expected to be completed by 11/30/2013." tsw:event_no="101791" tsw:datecreated="05/28/2009 00:00:00" tsw:daterevised="06/19/2013 08:32:03">
        <tsw:BeginDate>05/28/2009 00:00:00</tsw:BeginDate>
        <tsw:EndDate>11/30/2013 00:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[State Route 33 both directions in Polk County - Between SR-314 (PARKSVILLE RD.) RT. and SR-30 (HWY.30) RT. & LT., a widening project will result in a lane shift every day. This work is expected to be completed by 11/30/2013.]]></tsw:Description>
        <curract><![CDATA[The road is open both lanes in both directions are in operation.  There might be temporary lane closures before bridges in order to paint.

The location is from the Benton City limits to S.R. 30. Please be aware of flaggers and safety devices in the work zone.]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>2383293.9761992 320506.605703327</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>35.2057364783574 -84.6115315341788</marker>
    </item>
    <item>
      <title>state route 49 both directions in cheatham county - between sr-250 (petway rd.) rt. and pick-up sr-249 (river rd.) rt., bridge replacement construction will cause temporary lane closures every day. this work is expected to be completed by 5/31/2014. event </title>
      <link>http://maps.google.com/?q=36.2795904114675 -87.10008646716(1 - SR-49 11 County, - 14-MAY-12 - 31-MAY-14)</link>
      <description>State Route 49 both directions in Cheatham County - Between SR-250 (PETWAY RD.) RT. and PICK-UP SR-249 (RIVER RD.) RT., bridge replacement construction will cause temporary lane closures every day. This work is expected to be completed by 5/31/2014.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_38</guid>
      <tsw:COUNTY tsw:countyname="11" tsw:countyid="11" tsw:REGION="3"/>
      <tsw:route tsw:segmentid="SR-49" tsw:routeid="SR-49" tsw:routename="SR-49"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="State Route 49 both directions in Cheatham County - Between SR-250 (PETWAY RD.) RT. and PICK-UP SR-249 (RIVER RD.) RT., bridge replacement construction will cause temporary lane closures every day. This work is expected to be completed by 5/31/2014." tsw:event_no="355067" tsw:datecreated="05/14/2012 08:00:00" tsw:daterevised="05/07/2013 16:03:04">
        <tsw:BeginDate>05/14/2012 08:00:00</tsw:BeginDate>
        <tsw:EndDate>05/31/2014 17:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[State Route 49 both directions in Cheatham County - Between SR-250 (PETWAY RD.) RT. and PICK-UP SR-249 (RIVER RD.) RT., bridge replacement construction will cause temporary lane closures every day. This work is expected to be completed by 5/31/2014.]]></tsw:Description>
        <curract><![CDATA[Construction to replace the existing Harpeth River Bridge on State Route 49 in Cheatham County, at LM 0.39 continues.  Motorists can expect lane closures, lane shifts, and short term stoppage of traffic as this project progresses.  Motorists should also be alert to changing roadway conditions, and contractor equipment and personnel in, or near, the roadway on a daily basis.  This project is expected to last through May of 2014.  Additional updates to be posted as needed.]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>1644247.50839774 710279.479013924</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>36.2795904114675 -87.10008646716</marker>
    </item>
    <item>
      <title>interstate 81 both directions in sullivan county - between exit 56:  tri-cities crossing and exit 59:  sr-36 / kingsport / johnson city, construction work will close the roadway every day. this work is expected to be completed by 7/31/2013. event </title>
      <link>http://maps.google.com/?q=36.4576735078557 -82.5170933593128(1 - I-81 82 County, - 14-FEB-12 - 31-JUL-13)</link>
      <description>Interstate 81 both directions in Sullivan County - Between EXIT 56:  TRI-CITIES CROSSING and EXIT 59:  SR-36 / KINGSPORT / JOHNSON CITY, construction work will close the roadway every day. This work is expected to be completed by 7/31/2013.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_39</guid>
      <tsw:COUNTY tsw:countyname="82" tsw:countyid="82" tsw:REGION="1"/>
      <tsw:route tsw:segmentid="I-81" tsw:routeid="I-81" tsw:routename="I-81"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="Interstate 81 both directions in Sullivan County - Between EXIT 56:  TRI-CITIES CROSSING and EXIT 59:  SR-36 / KINGSPORT / JOHNSON CITY, construction work will close the roadway every day. This work is expected to be completed by 7/31/2013." tsw:event_no="297906" tsw:datecreated="02/14/2012 00:00:00" tsw:daterevised="06/18/2013 14:55:48">
        <tsw:BeginDate>02/14/2012 00:00:00</tsw:BeginDate>
        <tsw:EndDate>07/31/2013 00:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[Interstate 81 both directions in Sullivan County - Between EXIT 56:  TRI-CITIES CROSSING and EXIT 59:  SR-36 / KINGSPORT / JOHNSON CITY, construction work will close the roadway every day. This work is expected to be completed by 7/31/2013.]]></tsw:Description>
        <curract><![CDATA[Fortdtown Road is closed to thru traffic from the I-26 underpass to the Tri-cities Crossing intersection.  Motorists should pay attention to flaggers in this area.]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>2992591.25298437 791514.097922702</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>36.4576735078557 -82.5170933593128</marker>
    </item>
    <item>
      <title>state route 74 both directions in bradley county - between georgia-tennessee state line / (begin spring place rd.) and sr-313 (ladd springs rd.) rt., bridge replacement construction will close the roadway every day. this work is expected to be completed by 10/31/2013. event </title>
      <link>http://maps.google.com/?q=35.0455193829482 -84.8061501922255(1 - SR-74 06 County, - 28-DEC-11 - 31-OCT-13)</link>
      <description>State Route 74 both directions in Bradley County - Between GEORGIA-TENNESSEE STATE LINE / (BEGIN SPRING PLACE RD.) and SR-313 (LADD SPRINGS RD.) RT., bridge replacement construction will close the roadway every day. This work is expected to be completed by 10/31/2013.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_40</guid>
      <tsw:COUNTY tsw:countyname="06" tsw:countyid="06" tsw:REGION="2"/>
      <tsw:route tsw:segmentid="SR-74" tsw:routeid="SR-74" tsw:routename="SR-74"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="State Route 74 both directions in Bradley County - Between GEORGIA-TENNESSEE STATE LINE / (BEGIN SPRING PLACE RD.) and SR-313 (LADD SPRINGS RD.) RT., bridge replacement construction will close the roadway every day. This work is expected to be completed by 10/31/2013." tsw:event_no="291766" tsw:datecreated="12/28/2011 00:00:00" tsw:daterevised="05/08/2013 07:59:07">
        <tsw:BeginDate>12/28/2011 00:00:00</tsw:BeginDate>
        <tsw:EndDate>10/31/2013 00:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[State Route 74 both directions in Bradley County - Between GEORGIA-TENNESSEE STATE LINE / (BEGIN SPRING PLACE RD.) and SR-313 (LADD SPRINGS RD.) RT., bridge replacement construction will close the roadway every day. This work is expected to be completed by 10/31/2013.]]></tsw:Description>
        <curract><![CDATA[ The bridge has closed.  ]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>2325867.68979838 261425.829210459</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>35.0455193829482 -84.8061501922255</marker>
    </item>
    <item>
      <title>state route 362 both directions in carter county - between sr-361 (gap creek rd.) rt. &amp; (dry creek rd.) lt. / (begin gap creek rd.) and  (mile marker: ), construction work will close the roadway every day. this work is expected to be completed by 10/31/2014. event </title>
      <link>http://maps.google.com/?q=36.3031430439706 -82.2355733605875(1 - SR-362 10 County, - 28-FEB-12 - 31-OCT-14)</link>
      <description>State Route 362 both directions in Carter County - Between SR-361 (GAP CREEK RD.) RT. &amp; (DRY CREEK RD.) LT. / (BEGIN GAP CREEK RD.) and  (Mile Marker: ), construction work will close the roadway every day. This work is expected to be completed by 10/31/2014.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_41</guid>
      <tsw:COUNTY tsw:countyname="10" tsw:countyid="10" tsw:REGION="1"/>
      <tsw:route tsw:segmentid="SR-362" tsw:routeid="SR-362" tsw:routename="SR-362"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="State Route 362 both directions in Carter County - Between SR-361 (GAP CREEK RD.) RT. &amp;amp; (DRY CREEK RD.) LT. / (BEGIN GAP CREEK RD.) and  (Mile Marker: ), construction work will close the roadway every day. This work is expected to be completed by 10/31/2014." tsw:event_no="304428" tsw:datecreated="02/28/2012 00:00:00" tsw:daterevised="04/29/2013 07:28:08">
        <tsw:BeginDate>02/28/2012 00:00:00</tsw:BeginDate>
        <tsw:EndDate>10/31/2014 00:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[State Route 362 both directions in Carter County - Between SR-361 (GAP CREEK RD.) RT. & (DRY CREEK RD.) LT. / (BEGIN GAP CREEK RD.) and  (Mile Marker: ), construction work will close the roadway every day. This work is expected to be completed by 10/31/2014.]]></tsw:Description>
        <curract><![CDATA[The project consist of grading, drainage, construction of retaining walls and paving on State Route 362 beginning at State Route 361 (Gap Creek Road) and extending to S.R. 67, Elk Avenue. Motorist should be aware of construction equipment along State Route 362, Elk Avenue, West &quot;G&quot; Street, Big Spring Road, Jim Elliott Road, and Tester Road.

Jim Elliot Rd. has been paved and reopened. There is now a Two-Way Stop at the intersection of Jim Elliot and the proposed SR 362. 

The existing Gap Creek Road (State Route 362)will be closed to through traffic beginning January 21, 2013 to January 2014. The closure will occur at the Nation Forest section of the route, between State Route 361(dry Creek Rd.) and Tester Rd. Through traffic will be detoured for the duration of the closure. Detour signs and message boards will be in place.

DETOUR ROUTE NORTH TO SOUTH (Johnson City, TN to Roan Mountain, TN):
From Johnson City take W. Elk Ave. TN91 East/US321 North past TN362 approx. 3.1 Miles, take slight left onto Broad St. TN91 East/US321 North go 0.9 miles, take right on TN37 South/ US321 South continue toward Roan Mountain 17.5 miles.

DETOUR ROUTE SOUTH TO NORTH (Roan Mountain, TN to Johnson City, TN):
From Roan Mountain take TN37 North/ US321 North past TN361 approx.  7.1 miles, turn left on Broad St. TN91 West/US321 South go 0.9 miles, take slight right on Elk Ave. TN91 West/US321 South go 3.1 miles, continue on TN67 West/ US321 South toward Johnson City 4.5 miles.

]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>3077491.6681459 738362.329475877</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>36.3031430439706 -82.2355733605875</marker>
    </item>
    <item>
      <title>state route 224 both directions in mcnairy county - between sr-57 (hwy.57) rt. &amp; lt.  and sr-199 (finger-leapwood rd.) lt. / (begin leapwood-enville rd.), bridge replacement construction will result in lane closures every day. this work is expected to be completed by 06/30/2013. event </title>
      <link>http://maps.google.com/?q=35.1892923959437 -88.4319124771134(1 - SR-224 55 County, - 07-OCT-11 - 31-MAY-13)</link>
      <description>State Route 224 both directions in McNairy County - Between SR-57 (HWY.57) RT. &amp; LT.  and SR-199 (FINGER-LEAPWOOD RD.) LT. / (BEGIN LEAPWOOD-ENVILLE RD.), bridge replacement construction will result in lane closures every day. This work is expected to be completed by 06/30/2013.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_42</guid>
      <tsw:COUNTY tsw:countyname="55" tsw:countyid="55" tsw:REGION="4"/>
      <tsw:route tsw:segmentid="SR-224" tsw:routeid="SR-224" tsw:routename="SR-224"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="State Route 224 both directions in McNairy County - Between SR-57 (HWY.57) RT. &amp;amp; LT.  and SR-199 (FINGER-LEAPWOOD RD.) LT. / (BEGIN LEAPWOOD-ENVILLE RD.), bridge replacement construction will result in lane closures every day. This work is expected to be completed by 06/30/2013." tsw:event_no="318267" tsw:datecreated="10/07/2011 00:00:00" tsw:daterevised="06/17/2013 13:56:42">
        <tsw:BeginDate>10/07/2011 00:00:00</tsw:BeginDate>
        <tsw:EndDate>05/31/2013 00:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[State Route 224 both directions in McNairy County - Between SR-57 (HWY.57) RT. & LT.  and SR-199 (FINGER-LEAPWOOD RD.) LT. / (BEGIN LEAPWOOD-ENVILLE RD.), bridge replacement construction will result in lane closures every day. This work is expected to be completed by 06/30/2013.]]></tsw:Description>
        <curract><![CDATA[Contract CNK294:  The construction of three(3) concrete box beam bridges on S.R. 224 over Owl Creek (L.M. 4.99) and Lick Creek (L.M. 13.96, including grading, drainage and paving.  There is also the construction of a concrete box beam bridge on S.R. 224 over Clarey Creek (L.M. 12.57), including grading, drainage and paving.  The total project length is 0.964 mile. The Inspector for Owl Creek advises that the Contractor has opened the new road to traffic.  On Clarey Creek on S.R. 224, traffic is open to both northbound and southbound. The contractor has opened the Lick Creek project to traffic both northbound and southbound.  There are a few clean up items that need to be completed on Lick Creek.]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>1241887.05150243 320606.889131023</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>35.1892923959437 -88.4319124771134</marker>
    </item>
    <item>
      <title>state route 2 both directions in marion county - between sr-27 (tva rd.) rt. &amp; (griffith hwy.) lt. and sr-134 (state hwy-134) rt., bridge replacement construction will close the roadway every day. this work is expected to be completed by 2/28/2014. event </title>
      <link>http://maps.google.com/?q=35.0331852456842 -85.5603062837381(1 - SR-2 58 County, - 23-MAR-11 - 31-AUG-13)</link>
      <description>State Route 2 both directions in Marion County - Between SR-27 (TVA RD.) RT. &amp; (GRIFFITH HWY.) LT. and SR-134 (STATE HWY-134) RT., bridge replacement construction will close the roadway every day. This work is expected to be completed by 2/28/2014.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_43</guid>
      <tsw:COUNTY tsw:countyname="58" tsw:countyid="58" tsw:REGION="2"/>
      <tsw:route tsw:segmentid="SR-2" tsw:routeid="SR-2" tsw:routename="SR-2"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="State Route 2 both directions in Marion County - Between SR-27 (TVA RD.) RT. &amp;amp; (GRIFFITH HWY.) LT. and SR-134 (STATE HWY-134) RT., bridge replacement construction will close the roadway every day. This work is expected to be completed by 2/28/2014." tsw:event_no="278106" tsw:datecreated="03/23/2011 00:00:00" tsw:daterevised="06/14/2013 14:10:10">
        <tsw:BeginDate>03/23/2011 00:00:00</tsw:BeginDate>
        <tsw:EndDate>08/31/2013 00:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[State Route 2 both directions in Marion County - Between SR-27 (TVA RD.) RT. & (GRIFFITH HWY.) LT. and SR-134 (STATE HWY-134) RT., bridge replacement construction will close the roadway every day. This work is expected to be completed by 2/28/2014.]]></tsw:Description>
        <curract><![CDATA[The truss bridge is now closed to all through traffic until the new adjacent bridge currently under construction is completed.  A detour route that adds an additional 1.5 miles to the current route is posted.]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>2100141.16241483 255052.252484704</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>35.0331852456842 -85.5603062837381</marker>
    </item>
    <item>
      <title>interstate 440 eastbound in davidson county - between exit 5:  i-65 / birmingham and exit 7:  i-24 / chattanooga, a widening project will result in lane closures weeknights. this work is expected to be completed by 8/31/2013. event </title>
      <link>http://maps.google.com/?q=36.1214736656019 -86.7561656693456(1 - I-440 19 County, - 23-SEP-11 - 31-AUG-13)</link>
      <description>Interstate 440 eastbound in Davidson County - Between EXIT 5:  I-65 / BIRMINGHAM and EXIT 7:  I-24 / CHATTANOOGA, a widening project will result in lane closures weeknights. This work is expected to be completed by 8/31/2013.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_44</guid>
      <tsw:COUNTY tsw:countyname="19" tsw:countyid="19" tsw:REGION="3"/>
      <tsw:route tsw:segmentid="I-440" tsw:routeid="I-440" tsw:routename="I-440"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="Interstate 440 eastbound in Davidson County - Between EXIT 5:  I-65 / BIRMINGHAM and EXIT 7:  I-24 / CHATTANOOGA, a widening project will result in lane closures weeknights. This work is expected to be completed by 8/31/2013." tsw:event_no="249268" tsw:datecreated="09/23/2011 00:00:00" tsw:daterevised="06/12/2013 14:10:42">
        <tsw:BeginDate>09/23/2011 00:00:00</tsw:BeginDate>
        <tsw:EndDate>08/31/2013 00:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[Interstate 440 eastbound in Davidson County - Between EXIT 5:  I-65 / BIRMINGHAM and EXIT 7:  I-24 / CHATTANOOGA, a widening project will result in lane closures weeknights. This work is expected to be completed by 8/31/2013.]]></tsw:Description>
        <curract><![CDATA[Wednesday June 12 and Thursday June 13, 8PM-5AM, There will be lane closures on I-440 eastbound in order to saw cut the concrete pavement.  Also, the ramp from Nolensville Rd. southbound to I-440 eastbound will be closed.

Monday June 17 through Wednesday June 19, 8PM-5AM, There will be lane closures on I-440 eastbound for concrete sawing.
]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>1745171.58302524 651759.18691255</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>36.1214736656019 -86.7561656693456</marker>
    </item>
    <item>
      <title>state route 11 both directions in sumner county - between davidson-sumner county line and  (mile marker: ), bridge replacement construction will result in lane closures at night. this work is expected to be completed by 7/15/2013. event </title>
      <link>http://maps.google.com/?q=36.3482520045412 -86.7213304233278(1 - SR-11 83 County, - 27-OCT-11 - 15-JUL-13)</link>
      <description>State Route 11 both directions in Sumner County - Between DAVIDSON-SUMNER COUNTY LINE and  (Mile Marker: ), bridge replacement construction will result in lane closures at night. This work is expected to be completed by 7/15/2013.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_45</guid>
      <tsw:COUNTY tsw:countyname="83" tsw:countyid="83" tsw:REGION="3"/>
      <tsw:route tsw:segmentid="SR-11" tsw:routeid="SR-11" tsw:routename="SR-11"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="State Route 11 both directions in Sumner County - Between DAVIDSON-SUMNER COUNTY LINE and  (Mile Marker: ), bridge replacement construction will result in lane closures at night. This work is expected to be completed by 7/15/2013." tsw:event_no="260207" tsw:datecreated="10/27/2011 00:00:00" tsw:daterevised="06/12/2013 12:15:02">
        <tsw:BeginDate>10/27/2011 00:00:00</tsw:BeginDate>
        <tsw:EndDate>07/15/2013 00:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[State Route 11 both directions in Sumner County - Between DAVIDSON-SUMNER COUNTY LINE and  (Mile Marker: ), bridge replacement construction will result in lane closures at night. This work is expected to be completed by 7/15/2013.]]></tsw:Description>
        <curract><![CDATA[Thursday June 13 through Tuesday June 18, 9AM-3PM, (excluding Saturday and Sunday), There will be alternating lane closures on Dickerson Pike in order to pave the roadway.]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>1756068.22289867 734236.266464014</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>36.3482520045412 -86.7213304233278</marker>
    </item>
    <item>
      <title>state route 1 both directions in cumberland county - between leave sr-101 (peavine rd.) lt. and i-40 rt. &amp; lt., bridge replacement construction will temporarily slow traffic every day. this work is expected to be completed by 06/30/2013. event </title>
      <link>http://maps.google.com/?q=35.9328966585375 -84.937328841168(1 - SR-1 18 County, - 20-OCT-11 - 30-JUN-13)</link>
      <description>State Route 1 both directions in Cumberland County - Between LEAVE SR-101 (PEAVINE RD.) LT. and I-40 RT. &amp; LT., bridge replacement construction will temporarily slow traffic every day. This work is expected to be completed by 06/30/2013.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_46</guid>
      <tsw:COUNTY tsw:countyname="18" tsw:countyid="18" tsw:REGION="2"/>
      <tsw:route tsw:segmentid="SR-1" tsw:routeid="SR-1" tsw:routename="SR-1"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="State Route 1 both directions in Cumberland County - Between LEAVE SR-101 (PEAVINE RD.) LT. and I-40 RT. &amp;amp; LT., bridge replacement construction will temporarily slow traffic every day. This work is expected to be completed by 06/30/2013." tsw:event_no="258529" tsw:datecreated="10/20/2011 00:00:00" tsw:daterevised="05/30/2013 07:00:28">
        <tsw:BeginDate>10/20/2011 00:00:00</tsw:BeginDate>
        <tsw:EndDate>06/30/2013 00:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[State Route 1 both directions in Cumberland County - Between LEAVE SR-101 (PEAVINE RD.) LT. and I-40 RT. & LT., bridge replacement construction will temporarily slow traffic every day. This work is expected to be completed by 06/30/2013.]]></tsw:Description>
        <curract><![CDATA[Work is complete on this project and awaiting final inspection. Estimated project completion date is June 2013.  ]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>2283095.05859302 583958.025311081</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>35.9328966585375 -84.937328841168</marker>
    </item>
    <item>
      <title>state route 30 both directions in meigs county - between rhea-meigs county line / begin state hwy-30 and sr-58 (state hwy-58) rt. &amp; lt., construction work will cause temporary lane closures every day. this work is expected to be completed by 10/15/2013. event </title>
      <link>http://maps.google.com/?q=35.5142537398766 -84.8367931067693(1 - SR-30 61 County, - 14-APR-11 - 15-OCT-13)</link>
      <description>State Route 30 both directions in Meigs County - Between RHEA-MEIGS COUNTY LINE / BEGIN STATE HWY-30 and SR-58 (STATE HWY-58) RT. &amp; LT., construction work will cause temporary lane closures every day. This work is expected to be completed by 10/15/2013.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_47</guid>
      <tsw:COUNTY tsw:countyname="61" tsw:countyid="61" tsw:REGION="2"/>
      <tsw:route tsw:segmentid="SR-30" tsw:routeid="SR-30" tsw:routename="SR-30"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="State Route 30 both directions in Meigs County - Between RHEA-MEIGS COUNTY LINE / BEGIN STATE HWY-30 and SR-58 (STATE HWY-58) RT. &amp;amp; LT., construction work will cause temporary lane closures every day. This work is expected to be completed by 10/15/2013." tsw:event_no="197135" tsw:datecreated="04/14/2011 00:00:00" tsw:daterevised="06/14/2013 14:10:19">
        <tsw:BeginDate>04/14/2011 00:00:00</tsw:BeginDate>
        <tsw:EndDate>10/15/2013 00:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[State Route 30 both directions in Meigs County - Between RHEA-MEIGS COUNTY LINE / BEGIN STATE HWY-30 and SR-58 (STATE HWY-58) RT. & LT., construction work will cause temporary lane closures every day. This work is expected to be completed by 10/15/2013.]]></tsw:Description>
        <curract><![CDATA[Work continues on this project. Traffic interruptions will be minimal. Flaggers will assist with traffic control as needed.   ]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>2314667.65214398 431919.588812878</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>35.5142537398766 -84.8367931067693</marker>
    </item>
    <item>
      <title>state route 130 both directions in bedford county - between sr-64 hwy. 64 rt. &amp; lt. and sr-276 (thompson creek rd.) lt., bridge replacement construction will result in a lane shift every day. this work is expected to be completed by 10/31/2013. event </title>
      <link>http://maps.google.com/?q=35.4407204818167 -86.3892366013991(1 - SR-130 02 County, - 25-MAY-12 - 31-OCT-13)</link>
      <description>State Route 130 both directions in Bedford County - Between SR-64 HWY. 64 RT. &amp; LT. and SR-276 (THOMPSON CREEK RD.) LT., bridge replacement construction will result in a lane shift every day. This work is expected to be completed by 10/31/2013.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_48</guid>
      <tsw:COUNTY tsw:countyname="02" tsw:countyid="02" tsw:REGION="3"/>
      <tsw:route tsw:segmentid="SR-130" tsw:routeid="SR-130" tsw:routename="SR-130"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="State Route 130 both directions in Bedford County - Between SR-64 HWY. 64 RT. &amp;amp; LT. and SR-276 (THOMPSON CREEK RD.) LT., bridge replacement construction will result in a lane shift every day. This work is expected to be completed by 10/31/2013." tsw:event_no="360787" tsw:datecreated="05/25/2012 00:00:00" tsw:daterevised="05/24/2013 13:32:30">
        <tsw:BeginDate>05/25/2012 00:00:00</tsw:BeginDate>
        <tsw:EndDate>10/31/2013 00:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[State Route 130 both directions in Bedford County - Between SR-64 HWY. 64 RT. & LT. and SR-276 (THOMPSON CREEK RD.) LT., bridge replacement construction will result in a lane shift every day. This work is expected to be completed by 10/31/2013.]]></tsw:Description>
        <curract><![CDATA[Motorist should be advised of lane shifts due to bridge construction.]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>1852555.22419527 403327.241317628</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>35.4407204818167 -86.3892366013991</marker>
    </item>
    <item>
      <title>interstate 26 both directions in sullivan county - between mile marker 4 (mile marker: 4) and mile marker 6 (mile marker: 6), interchange modification construction will temporarily slow traffic every day. this work is expected to be completed by 6/30/2013. event </title>
      <link>http://maps.google.com/?q=36.4915188227178 -82.5533170289496(1 - I-26 82 County, - 01-JUN-12 - 28-OCT-12)</link>
      <description>Interstate 26 both directions in Sullivan County - Between MILE MARKER 4 (Mile Marker: 4) and MILE MARKER 6 (Mile Marker: 6), interchange modification construction will temporarily slow traffic every day. This work is expected to be completed by 6/30/2013.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_49</guid>
      <tsw:COUNTY tsw:countyname="82" tsw:countyid="82" tsw:REGION="1"/>
      <tsw:route tsw:segmentid="I-26" tsw:routeid="I-26" tsw:routename="I-26"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="Interstate 26 both directions in Sullivan County - Between MILE MARKER 4 (Mile Marker: 4) and MILE MARKER 6 (Mile Marker: 6), interchange modification construction will temporarily slow traffic every day. This work is expected to be completed by 6/30/2013." tsw:event_no="368947" tsw:datecreated="06/01/2012 06:00:00" tsw:daterevised="06/18/2013 14:56:56">
        <tsw:BeginDate>06/01/2012 06:00:00</tsw:BeginDate>
        <tsw:EndDate>10/28/2012 19:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[Interstate 26 both directions in Sullivan County - Between MILE MARKER 4 (Mile Marker: 4) and MILE MARKER 6 (Mile Marker: 6), interchange modification construction will temporarily slow traffic every day. This work is expected to be completed by 6/30/2013.]]></tsw:Description>
        <curract><![CDATA[Exit ramps are closed to new Welcome Center site.  Please use caution while traveling in this area.  ]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>2981510.84132938 803451.475641487</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>36.4915188227178 -82.5533170289496</marker>
    </item>
    <item>
      <title>interstate 75 both directions in hamilton county - between mile marker 12 (mile marker: 12) and mile marker 14 (mile marker: 14), striping will cause temporary lane closures every day. this work is expected to be completed by 6/30/2013. event </title>
      <link>http://maps.google.com/?q=35.1015909478206 -85.0532117658682(1 - I-75 33 County, - 01-JUL-12 - 30-JUN-13)</link>
      <description>Interstate 75 both directions in Hamilton County - Between MILE MARKER 12 (Mile Marker: 12) and MILE MARKER 14 (Mile Marker: 14), striping will cause temporary lane closures every day. This work is expected to be completed by 6/30/2013.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_50</guid>
      <tsw:COUNTY tsw:countyname="33" tsw:countyid="33" tsw:REGION="2"/>
      <tsw:route tsw:segmentid="I-75" tsw:routeid="I-75" tsw:routename="I-75"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="Interstate 75 both directions in Hamilton County - Between MILE MARKER 12 (Mile Marker: 12) and MILE MARKER 14 (Mile Marker: 14), striping will cause temporary lane closures every day. This work is expected to be completed by 6/30/2013." tsw:event_no="408051" tsw:datecreated="07/01/2012 00:00:00" tsw:daterevised="06/18/2013 13:07:06">
        <tsw:BeginDate>07/01/2012 00:00:00</tsw:BeginDate>
        <tsw:EndDate>06/30/2013 00:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[Interstate 75 both directions in Hamilton County - Between MILE MARKER 12 (Mile Marker: 12) and MILE MARKER 14 (Mile Marker: 14), striping will cause temporary lane closures every day. This work is expected to be completed by 6/30/2013.]]></tsw:Description>
        <curract><![CDATA[ Call-Out #1 - Region 2 ON VARIOUS INTERSTATE AND STATE ROUTES.  Call-Out #1 is for Hamilton, Bradley &amp; McMinn Counties. Traffic will be paced at various locations in Region 2 in order to perform various pavement operations (weather permitting)on an as needed basis for the Counties listed above.   I-75 Exit 25 North, 1 ramp; I-75 Northbound bridge over Hiwassee River 1 location, I-75 Exit 42 North &amp; South ramps; SR 60 left turn lane to I-75 1 location; US 27 &amp; Morrison Spring Road Exit ramps North &amp; South 3 ramps.  On the north exit ramp contractor will need to set out a lane closure to do the exit only arrows; US 27 &amp; Mountain Creek Road Exit Ramps north &amp; south 4 ramps; US27 &amp;SR 153 exit ramps north &amp; south 2 ramps.]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>2251717.30018222 281025.835616986</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>35.1015909478206 -85.0532117658682</marker>
    </item>
    <item>
      <title>state route 109 both directions in wilson county - between i-40 / {center of overhead} and wilson-sumner county line, bridge replacement construction will cause temporary lane closures at night. this work is expected to be completed by 10/31/2013. event </title>
      <link>http://maps.google.com/?q=36.2605570334439 -86.4393611616172(1 - SR-109 95 County, - 12-JAN-11 - 31-OCT-13)</link>
      <description>State Route 109 both directions in Wilson County - Between I-40 / {CENTER OF OVERHEAD} and WILSON-SUMNER COUNTY LINE, bridge replacement construction will cause temporary lane closures at night. This work is expected to be completed by 10/31/2013.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_51</guid>
      <tsw:COUNTY tsw:countyname="95" tsw:countyid="95" tsw:REGION="3"/>
      <tsw:route tsw:segmentid="SR-109" tsw:routeid="SR-109" tsw:routename="SR-109"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="State Route 109 both directions in Wilson County - Between I-40 / {CENTER OF OVERHEAD} and WILSON-SUMNER COUNTY LINE, bridge replacement construction will cause temporary lane closures at night. This work is expected to be completed by 10/31/2013." tsw:event_no="411109" tsw:datecreated="01/12/2011 00:00:00" tsw:daterevised="06/12/2013 15:41:34">
        <tsw:BeginDate>01/12/2011 00:00:00</tsw:BeginDate>
        <tsw:EndDate>10/31/2013 00:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[State Route 109 both directions in Wilson County - Between I-40 / {CENTER OF OVERHEAD} and WILSON-SUMNER COUNTY LINE, bridge replacement construction will cause temporary lane closures at night. This work is expected to be completed by 10/31/2013.]]></tsw:Description>
        <curract><![CDATA[Thursday June 13 through Wednesday June 19, 9AM-3PM, There will be alternating lane closures on SR 109 northbound and southbound for utility line relocation work.]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>1838964.09798715 701818.813221759</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>36.2605570334439 -86.4393611616172</marker>
    </item>
    <item>
      <title>state route 6 both directions in lawrence county - between sr-98 (rabbit trail) rt. and sr-15 (e. gaines st.) rt. &amp; lt. / begin n. locust av., construction work will cause temporary lane closures on weekdays. this work is expected to be completed by 8/31/2014. event </title>
      <link>http://maps.google.com/?q=35.1997805890261 -87.3395735297674(1 - SR-6 50 County, - 09-JUL-12 - 31-AUG-14)</link>
      <description>State Route 6 both directions in Lawrence County - Between SR-98 (RABBIT TRAIL) RT. and SR-15 (E. GAINES ST.) RT. &amp; LT. / BEGIN N. LOCUST AV., construction work will cause temporary lane closures on weekdays. This work is expected to be completed by 8/31/2014.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_52</guid>
      <tsw:COUNTY tsw:countyname="50" tsw:countyid="50" tsw:REGION="3"/>
      <tsw:route tsw:segmentid="SR-6" tsw:routeid="SR-6" tsw:routename="SR-6"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="State Route 6 both directions in Lawrence County - Between SR-98 (RABBIT TRAIL) RT. and SR-15 (E. GAINES ST.) RT. &amp;amp; LT. / BEGIN N. LOCUST AV., construction work will cause temporary lane closures on weekdays. This work is expected to be completed by 8/31/2014." tsw:event_no="382768" tsw:datecreated="07/09/2012 00:00:00" tsw:daterevised="04/05/2013 10:32:27">
        <tsw:BeginDate>07/09/2012 00:00:00</tsw:BeginDate>
        <tsw:EndDate>08/31/2014 00:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[State Route 6 both directions in Lawrence County - Between SR-98 (RABBIT TRAIL) RT. and SR-15 (E. GAINES ST.) RT. & LT. / BEGIN N. LOCUST AV., construction work will cause temporary lane closures on weekdays. This work is expected to be completed by 8/31/2014.]]></tsw:Description>
        <curract><![CDATA[Earth moving equipment crossing West Point Road.  Flaggers will be present.  Some traffic delays should be expected on SR 242.]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>1568282.39813527 318135.324457209</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>35.1997805890261 -87.3395735297674</marker>
    </item>
    <item>
      <title>state route 20(us-412) both directions in henderson county - between leave sr-104 (adams st.) rt. / pick-up sr-114 (natchez trace dr.) lt. and henderson-decatur county line, a widening project will cause temporary lane closures every day. this work is expected to be completed by 10/31/2013. event </title>
      <link>http://maps.google.com/?q=35.6308164554698 -88.2919073117936(1 - SR-20 39 County, - 17-NOV-10 - 31-OCT-13)</link>
      <description>State Route 20(US-412) both directions in Henderson County - Between LEAVE SR-104 (ADAMS ST.) RT. / PICK-UP SR-114 (NATCHEZ TRACE DR.) LT. and HENDERSON-DECATUR COUNTY LINE, a widening project will cause temporary lane closures every day. This work is expected to be completed by 10/31/2013.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_53</guid>
      <tsw:COUNTY tsw:countyname="39" tsw:countyid="39" tsw:REGION="4"/>
      <tsw:route tsw:segmentid="SR-20" tsw:routeid="SR-20" tsw:routename="SR-20"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="State Route 20(US-412) both directions in Henderson County - Between LEAVE SR-104 (ADAMS ST.) RT. / PICK-UP SR-114 (NATCHEZ TRACE DR.) LT. and HENDERSON-DECATUR COUNTY LINE, a widening project will cause temporary lane closures every day. This work is expected to be completed by 10/31/2013." tsw:event_no="413627" tsw:datecreated="11/17/2010 00:00:00" tsw:daterevised="06/18/2013 11:06:05">
        <tsw:BeginDate>11/17/2010 00:00:00</tsw:BeginDate>
        <tsw:EndDate>10/31/2013 00:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[State Route 20(US-412) both directions in Henderson County - Between LEAVE SR-104 (ADAMS ST.) RT. / PICK-UP SR-114 (NATCHEZ TRACE DR.) LT. and HENDERSON-DECATUR COUNTY LINE, a widening project will cause temporary lane closures every day. This work is expected to be completed by 10/31/2013.]]></tsw:Description>
        <curract><![CDATA[The grading, drainage, construction of four (4) concrete I-beam bridges, and paving on U.S. 412 (S.R.20) beginning 0.50 mile east of Lone Elm Road and extending to the Decatur County line.
All lanes (new and existing) and adjacent side roads are now open.  Ongoing work could cause temporary lane closures throughout project.  Flaggers will be present.]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>1287473.54105872 480265.500673754</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>35.6308164554698 -88.2919073117936</marker>
    </item>
    <item>
      <title>state route 109 both directions in wilson county - between sr-24 (lebanon rd.) rt. &amp; lt. and wilson-sumner county line, bridge replacement construction will intermittently close the roadway on weekdays. this work is expected to be completed by 10/31/2013. event </title>
      <link>http://maps.google.com/?q=36.2862950589287 -86.4437812535279(1 - SR-109 95 County, - 12-JAN-11 - 31-OCT-13)</link>
      <description>State Route 109 both directions in Wilson County - Between SR-24 (LEBANON RD.) RT. &amp; LT. and WILSON-SUMNER COUNTY LINE, bridge replacement construction will intermittently close the roadway on weekdays. This work is expected to be completed by 10/31/2013.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_54</guid>
      <tsw:COUNTY tsw:countyname="95" tsw:countyid="95" tsw:REGION="3"/>
      <tsw:route tsw:segmentid="SR-109" tsw:routeid="SR-109" tsw:routename="SR-109"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="State Route 109 both directions in Wilson County - Between SR-24 (LEBANON RD.) RT. &amp;amp; LT. and WILSON-SUMNER COUNTY LINE, bridge replacement construction will intermittently close the roadway on weekdays. This work is expected to be completed by 10/31/2013." tsw:event_no="411088" tsw:datecreated="01/12/2011 00:00:00" tsw:daterevised="06/12/2013 15:41:56">
        <tsw:BeginDate>01/12/2011 00:00:00</tsw:BeginDate>
        <tsw:EndDate>10/31/2013 00:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[State Route 109 both directions in Wilson County - Between SR-24 (LEBANON RD.) RT. & LT. and WILSON-SUMNER COUNTY LINE, bridge replacement construction will intermittently close the roadway on weekdays. This work is expected to be completed by 10/31/2013.]]></tsw:Description>
        <curract><![CDATA[Thursday June 13 through Wednesday June 19, 9AM-3PM, There will be alternating lane closures on SR 109 northbound and southbound for utility line relocation work.]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>1837703.42802842 711194.435745556</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>36.2862950589287 -86.4437812535279</marker>
    </item>
    <item>
      <title>state route 50 both directions in maury county - between sr-373 (state hwy-373) rt. and i-65 rt. &amp; lt. / center of overhead, bridge repair will cause a reduction in lanes from two to one lane every day. this work is expected to be completed by 6/15/2013. event </title>
      <link>http://maps.google.com/?q=35.5313836347768 -86.9432013979335(1 - SR-50 60 County, - 26-JUN-12 - 15-JUN-13)</link>
      <description>State Route 50 both directions in Maury County - Between SR-373 (STATE HWY-373) RT. and I-65 RT. &amp; LT. / CENTER OF OVERHEAD, bridge repair will cause a reduction in lanes from two to one lane every day. This work is expected to be completed by 6/15/2013.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_55</guid>
      <tsw:COUNTY tsw:countyname="60" tsw:countyid="60" tsw:REGION="3"/>
      <tsw:route tsw:segmentid="SR-50" tsw:routeid="SR-50" tsw:routename="SR-50"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="State Route 50 both directions in Maury County - Between SR-373 (STATE HWY-373) RT. and I-65 RT. &amp;amp; LT. / CENTER OF OVERHEAD, bridge repair will cause a reduction in lanes from two to one lane every day. This work is expected to be completed by 6/15/2013." tsw:event_no="384354" tsw:datecreated="06/26/2012 00:00:00" tsw:daterevised="05/13/2013 13:41:12">
        <tsw:BeginDate>06/26/2012 00:00:00</tsw:BeginDate>
        <tsw:EndDate>06/15/2013 00:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[State Route 50 both directions in Maury County - Between SR-373 (STATE HWY-373) RT. and I-65 RT. & LT. / CENTER OF OVERHEAD, bridge repair will cause a reduction in lanes from two to one lane every day. This work is expected to be completed by 6/15/2013.]]></tsw:Description>
        <curract><![CDATA[The construction required for repair of bridge on SR 50 over I-65 is ongoing and will continue until completion. Motorists are cautioned to be alert for workers and equipment in this area, and to be prepared to stop due to traffic being reduced to one lane thru this area.]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>1687863.2962438 437449.915028786</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>35.5313836347768 -86.9432013979335</marker>
    </item>
    <item>
      <title>state route 15(us-64) both directions in hardin county - between sr-22 rt. and leave sr-69 (main st.) rt. / {pick-up t0 128 (wayne rd. ext.) rt.}, bridge repair will result in lane closures every day. this work is expected to be completed by 06/30/2013. event </title>
      <link>http://maps.google.com/?q=35.2260329997193 -88.2841621276834(1 - SR-15 36 County, - 06-JUN-12 - 30-NOV-12)</link>
      <description>State Route 15(US-64) both directions in Hardin County - Between SR-22 RT. and LEAVE SR-69 (MAIN ST.) RT. / {PICK-UP T0 128 (WAYNE RD. EXT.) RT.}, bridge repair will result in lane closures every day. This work is expected to be completed by 06/30/2013.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_56</guid>
      <tsw:COUNTY tsw:countyname="36" tsw:countyid="36" tsw:REGION="4"/>
      <tsw:route tsw:segmentid="SR-15" tsw:routeid="SR-15" tsw:routename="SR-15"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="State Route 15(US-64) both directions in Hardin County - Between SR-22 RT. and LEAVE SR-69 (MAIN ST.) RT. / {PICK-UP T0 128 (WAYNE RD. EXT.) RT.}, bridge repair will result in lane closures every day. This work is expected to be completed by 06/30/2013." tsw:event_no="399027" tsw:datecreated="06/06/2012 00:00:00" tsw:daterevised="06/17/2013 13:56:15">
        <tsw:BeginDate>06/06/2012 00:00:00</tsw:BeginDate>
        <tsw:EndDate>11/30/2012 00:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[State Route 15(US-64) both directions in Hardin County - Between SR-22 RT. and LEAVE SR-69 (MAIN ST.) RT. / {PICK-UP T0 128 (WAYNE RD. EXT.) RT.}, bridge repair will result in lane closures every day. This work is expected to be completed by 06/30/2013.]]></tsw:Description>
        <curract><![CDATA[CONTRACT CNL164: HARDIN COUNTY at SAVANNAH, TN: PROJECT DESCRIPTION:  THE REPAIR OF THE BRIDGE ON U.S. 64 (S.R. 15) OVER THE TENNESSEE RIVER (L.M. 6.29). THE INSPECTOR ADVISES THAT THIS PROJECT IS NOW OPENED UP TO FOUR LANE TRAFFIC. THIS PROJECT IS COMPLETE. There are clean up items underneath the bridge to be done, per our Supervisor.]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>1286336.09321152 332912.919380229</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>35.2260329997193 -88.2841621276834</marker>
    </item>
    <item>
      <title>state route 14 both directions in shelby county - between leave sr-175 (shelby dr.) rt. and sr-1 (e.h. crump blvd.) rt. &amp; lt. / {end us-61}, bridge replacement construction will close the roadway every day. this work is expected to be completed by 5/31/2014. event </title>
      <link>http://maps.google.com/?q=35.0690816210637 -90.0585966103594(1 - SR-14 79 County, - 15-AUG-12 - 31-MAY-14)</link>
      <description>State Route 14 both directions in Shelby County - Between LEAVE SR-175 (SHELBY DR.) RT. and SR-1 (E.H. CRUMP BLVD.) RT. &amp; LT. / {END US-61}, bridge replacement construction will close the roadway every day. This work is expected to be completed by 5/31/2014.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_57</guid>
      <tsw:COUNTY tsw:countyname="79" tsw:countyid="79" tsw:REGION="4"/>
      <tsw:route tsw:segmentid="SR-14" tsw:routeid="SR-14" tsw:routename="SR-14"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="State Route 14 both directions in Shelby County - Between LEAVE SR-175 (SHELBY DR.) RT. and SR-1 (E.H. CRUMP BLVD.) RT. &amp;amp; LT. / {END US-61}, bridge replacement construction will close the roadway every day. This work is expected to be completed by 5/31/2014." tsw:event_no="404627" tsw:datecreated="08/15/2012 00:00:00" tsw:daterevised="04/15/2013 13:58:14">
        <tsw:BeginDate>08/15/2012 00:00:00</tsw:BeginDate>
        <tsw:EndDate>05/31/2014 00:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[State Route 14 both directions in Shelby County - Between LEAVE SR-175 (SHELBY DR.) RT. and SR-1 (E.H. CRUMP BLVD.) RT. & LT. / {END US-61}, bridge replacement construction will close the roadway every day. This work is expected to be completed by 5/31/2014.]]></tsw:Description>
        <curract><![CDATA[The roadway was closed on August 15, 2012.  Northbound traffic was diverted east along South Parkway, North onto Latham and West along McLemore. 

Third Street has been reduced to one lane in each direction south of McLemore approaching the bridge at which point, South Bound Third Street traffic is diverted east along Lucy Street, South along Latham and West onto South Parkway. 

Motorist may also utilize Florida Street in lieu of (which parallels Latham) Latham. 

Dement&#39;s Subcontractor has started demolition of the bridge on the south end of the project and Shelby Electric has removed light poles off the bridge.  Parsons suggested and installed Florida Street as a truck route because of the difficulties with the turning radii along the Latham Street Detour.
Parsons has suggested a minor change to eastbound McLemore due to truck traffic making a left turn on to northbound Third Street.  The City of Memphis increased the timing for the eastbound traffic and that seems to be sufficient at this time.
Biggs, a subcontractor performed bridge demolition which is 99% complete.    
Parson&#39;s is contacting the City of Memphis Sewer Division concerning the sewer line conflict with the bridge footing.  The City completed rerouting the sewer.  Ferrell continues the installation of new box culvert at the concrete channel.
Dement drove the load test pile and performed load test at Bent 1. An easement issue has arisen at Bent 1 in that the skew of the footings at the tracks infringes upon the Railroad&#39;s right-of-way.

]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>754270.992618984 293003.388400884</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>35.0690816210637 -90.0585966103594</marker>
    </item>
    <item>
      <title>interstate 40 westbound in shelby county - between exit 1b:  us-51 / danny thomas blvd. and arkansas-tennessee state line, bridge repair will temporarily slow traffic every day. this work is expected to be completed by 11/30/2013. event </title>
      <link>http://maps.google.com/?q=35.1530516147551 -90.0536554134853(1 - I-40 79 County, - 10-NOV-10 - 30-NOV-13)</link>
      <description>Interstate 40 westbound in Shelby County - Between EXIT 1B:  US-51 / DANNY THOMAS BLVD. and ARKANSAS-TENNESSEE STATE LINE, bridge repair will temporarily slow traffic every day. This work is expected to be completed by 11/30/2013.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_58</guid>
      <tsw:COUNTY tsw:countyname="79" tsw:countyid="79" tsw:REGION="4"/>
      <tsw:route tsw:segmentid="I-40" tsw:routeid="I-40" tsw:routename="I-40"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="Interstate 40 westbound in Shelby County - Between EXIT 1B:  US-51 / DANNY THOMAS BLVD. and ARKANSAS-TENNESSEE STATE LINE, bridge repair will temporarily slow traffic every day. This work is expected to be completed by 11/30/2013." tsw:event_no="414127" tsw:datecreated="11/10/2010 00:00:00" tsw:daterevised="06/06/2013 16:06:08">
        <tsw:BeginDate>11/10/2010 00:00:00</tsw:BeginDate>
        <tsw:EndDate>11/30/2013 00:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[Interstate 40 westbound in Shelby County - Between EXIT 1B:  US-51 / DANNY THOMAS BLVD. and ARKANSAS-TENNESSEE STATE LINE, bridge repair will temporarily slow traffic every day. This work is expected to be completed by 11/30/2013.]]></tsw:Description>
        <curract><![CDATA[The left (inside) shoulder of Ramp J, the exit ramp for westbound Interstate 40 to Second Street, will be closed for about six months.  Ramp J will remain open at all times.  Work includes:  installation of tie-down anchors for the footing at IL-12 (on the bank of the Wolf River Basin), installation of structural steel along Ramp D, construction of pier caps on Ramp D and Ramp NO, installation of CIDH piles under the main line between Main Street and 3rd Street, and construction of new footings, retrofitting columns and pier caps on the main line between Main Street and 3rd Street.
]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>757014.039896537 323480.499694233</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>35.1530516147551 -90.0536554134853</marker>
    </item>
    <item>
      <title>state route 114 both directions in hardin county - between sr-128 clifton rd. lt. and hardin-decatur county line, bridge repair will result in a lane shift every day. this work is expected to be completed by 10/15/2013. event </title>
      <link>http://maps.google.com/?q=35.3921474161793 -88.0537040202481(1 - SR-114 36 County, - 22-JAN-13 - 15-OCT-13)</link>
      <description>State Route 114 both directions in Hardin County - Between SR-128 CLIFTON RD. LT. and HARDIN-DECATUR COUNTY LINE, bridge repair will result in a lane shift every day. This work is expected to be completed by 10/15/2013.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_59</guid>
      <tsw:COUNTY tsw:countyname="36" tsw:countyid="36" tsw:REGION="4"/>
      <tsw:route tsw:segmentid="SR-114" tsw:routeid="SR-114" tsw:routename="SR-114"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="State Route 114 both directions in Hardin County - Between SR-128 CLIFTON RD. LT. and HARDIN-DECATUR COUNTY LINE, bridge repair will result in a lane shift every day. This work is expected to be completed by 10/15/2013." tsw:event_no="485487" tsw:datecreated="01/22/2013 00:00:00" tsw:daterevised="06/17/2013 13:55:49">
        <tsw:BeginDate>01/22/2013 00:00:00</tsw:BeginDate>
        <tsw:EndDate>10/15/2013 00:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[State Route 114 both directions in Hardin County - Between SR-128 CLIFTON RD. LT. and HARDIN-DECATUR COUNTY LINE, bridge repair will result in a lane shift every day. This work is expected to be completed by 10/15/2013.]]></tsw:Description>
        <curract><![CDATA[CNL319: Hardin County:  This is the repair of the bridge on State Route 114 over the Tennessee River at Log Mile 3.22 at Clifton, Tennessee.   The contractor is working on this project.   There will be lane shifts on Eastbound and Westbound lanes; there will be flagmen and there will be barrells and barrier rail.  ]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>1356420.34414371 391838.707856714</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>35.3921474161793 -88.0537040202481</marker>
    </item>
    <item>
      <title>state route 29 southbound in scott county - between tennessee-kentucky state line and sr-456 (depot st.) rt., bridge repair will cause a reduction in lanes from two to one lane every day. this work is expected to be completed by 08/31/2013. event </title>
      <link>http://maps.google.com/?q=36.5382728750255 -84.4637395978582(1 - SR-29 76 County, - 10-DEC-12 - 20-MAR-13)</link>
      <description>State Route 29 southbound in Scott County - Between TENNESSEE-KENTUCKY STATE LINE and SR-456 (DEPOT ST.) RT., bridge repair will cause a reduction in lanes from two to one lane every day. This work is expected to be completed by 08/31/2013.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_60</guid>
      <tsw:COUNTY tsw:countyname="76" tsw:countyid="76" tsw:REGION="1"/>
      <tsw:route tsw:segmentid="SR-29" tsw:routeid="SR-29" tsw:routename="SR-29"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="State Route 29 southbound in Scott County - Between TENNESSEE-KENTUCKY STATE LINE and SR-456 (DEPOT ST.) RT., bridge repair will cause a reduction in lanes from two to one lane every day. This work is expected to be completed by 08/31/2013." tsw:event_no="470708" tsw:datecreated="12/10/2012 00:00:00" tsw:daterevised="03/25/2013 07:39:35">
        <tsw:BeginDate>12/10/2012 00:00:00</tsw:BeginDate>
        <tsw:EndDate>03/20/2013 00:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[State Route 29 southbound in Scott County - Between TENNESSEE-KENTUCKY STATE LINE and SR-456 (DEPOT ST.) RT., bridge repair will cause a reduction in lanes from two to one lane every day. This work is expected to be completed by 08/31/2013.]]></tsw:Description>
        <curract><![CDATA[Temporary Signal In Use begining 12-10-12 until phase 1 completion.
Phase 1 Construction Continues as of April 2013 Unchanged]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>2419828.23713881 806176.10678927</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>36.5382728750255 -84.4637395978582</marker>
    </item>
    <item>
      <title>interstate 65 both directions in davidson county - between exit 87a:  us-431 south / e. trinity ln. and mile marker 91 (mile marker: 91), a widening project will result in lane closures every day. this work is expected to be completed by 10/15/2015. event </title>
      <link>http://maps.google.com/?q=36.2309188718716 -86.7706372556174(1 - I-65 19 County, - 27-SEP-12 - 15-OCT-15)</link>
      <description>Interstate 65 both directions in Davidson County - Between EXIT 87A:  US-431 SOUTH / E. TRINITY LN. and MILE MARKER 91 (Mile Marker: 91), a widening project will result in lane closures every day. This work is expected to be completed by 10/15/2015.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_61</guid>
      <tsw:COUNTY tsw:countyname="19" tsw:countyid="19" tsw:REGION="3"/>
      <tsw:route tsw:segmentid="I-65" tsw:routeid="I-65" tsw:routename="I-65"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="Interstate 65 both directions in Davidson County - Between EXIT 87A:  US-431 SOUTH / E. TRINITY LN. and MILE MARKER 91 (Mile Marker: 91), a widening project will result in lane closures every day. This work is expected to be completed by 10/15/2015." tsw:event_no="444848" tsw:datecreated="09/27/2012 00:00:00" tsw:daterevised="06/12/2013 12:15:13">
        <tsw:BeginDate>09/27/2012 00:00:00</tsw:BeginDate>
        <tsw:EndDate>10/15/2015 00:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[Interstate 65 both directions in Davidson County - Between EXIT 87A:  US-431 SOUTH / E. TRINITY LN. and MILE MARKER 91 (Mile Marker: 91), a widening project will result in lane closures every day. This work is expected to be completed by 10/15/2015.]]></tsw:Description>
        <curract><![CDATA[No current closures]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>1741211.30863187 691633.336146271</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>36.2309188718716 -86.7706372556174</marker>
    </item>
    <item>
      <title>state route 76 both directions in montgomery county - between sr-112 (nashville hwy.) rt. &amp; lt. / begin state hwy-76 / {end us-41a/bp} and i-24 rt. &amp; lt., intersection modification work will cause temporary lane closures every day. this work is expected to be completed by 6/30/2013. event </title>
      <link>http://maps.google.com/?q=36.5172757342924 -87.2484884129243(1 - SR-76 63 County, - 15-OCT-12 - 30-JUN-13)</link>
      <description>State Route 76 both directions in Montgomery County - Between SR-112 (NASHVILLE HWY.) RT. &amp; LT. / BEGIN STATE HWY-76 / {END US-41A/BP} and I-24 RT. &amp; LT., intersection modification work will cause temporary lane closures every day. This work is expected to be completed by 6/30/2013.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_62</guid>
      <tsw:COUNTY tsw:countyname="63" tsw:countyid="63" tsw:REGION="3"/>
      <tsw:route tsw:segmentid="SR-76" tsw:routeid="SR-76" tsw:routename="SR-76"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="State Route 76 both directions in Montgomery County - Between SR-112 (NASHVILLE HWY.) RT. &amp;amp; LT. / BEGIN STATE HWY-76 / {END US-41A/BP} and I-24 RT. &amp;amp; LT., intersection modification work will cause temporary lane closures every day. This work is expected to be completed by 6/30/2013." tsw:event_no="439888" tsw:datecreated="10/15/2012 08:00:00" tsw:daterevised="05/07/2013 16:06:48">
        <tsw:BeginDate>10/15/2012 08:00:00</tsw:BeginDate>
        <tsw:EndDate>06/30/2013 17:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[State Route 76 both directions in Montgomery County - Between SR-112 (NASHVILLE HWY.) RT. & LT. / BEGIN STATE HWY-76 / {END US-41A/BP} and I-24 RT. & LT., intersection modification work will cause temporary lane closures every day. This work is expected to be completed by 6/30/2013.]]></tsw:Description>
        <curract><![CDATA[Construction to make modifications and add traffic signals to the intersection of State Route 76 and Sango Road &amp; State Route 76 with the east bound off ramp from I-24 continues.  Motorists can expect temporary lane closures from the hours of 9:00 AM to 3:30 PM daily.  Motorists should be alert to changing roadway conditions as this project progresses, and be alert to contractor equipment and personnel in, or near, the existing roadway.  Paving operations are complete, however, permanent pavement markings and final dressing are in still on going to complete this project within the next two to three weeks.]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>1601611.84414613 797329.326982602</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>36.5172757342924 -87.2484884129243</marker>
    </item>
    <item>
      <title>state route 35 eastbound in blount county - between sr-115 (hwy-129 bypass) rt. &amp; (n. hall rd.) lt. and sr-33 (e. broadway av.) rt. &amp; lt., a widening project will result in lane closures every day. this work is expected to be completed by 9/28/2013. event </title>
      <link>http://maps.google.com/?q=35.7756927833792 -83.9791799465981(1 - SR-35 05 County, - 07-FEB-12 - 30-NOV-12)</link>
      <description>State Route 35 eastbound in Blount County - Between SR-115 (HWY-129 BYPASS) RT. &amp; (N. HALL RD.) LT. and SR-33 (E. BROADWAY AV.) RT. &amp; LT., a widening project will result in lane closures every day. This work is expected to be completed by 9/28/2013.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_63</guid>
      <tsw:COUNTY tsw:countyname="05" tsw:countyid="05" tsw:REGION="1"/>
      <tsw:route tsw:segmentid="SR-35" tsw:routeid="SR-35" tsw:routename="SR-35"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="State Route 35 eastbound in Blount County - Between SR-115 (HWY-129 BYPASS) RT. &amp;amp; (N. HALL RD.) LT. and SR-33 (E. BROADWAY AV.) RT. &amp;amp; LT., a widening project will result in lane closures every day. This work is expected to be completed by 9/28/2013." tsw:event_no="447867" tsw:datecreated="02/07/2012 00:00:00" tsw:daterevised="04/01/2013 08:47:40">
        <tsw:BeginDate>02/07/2012 00:00:00</tsw:BeginDate>
        <tsw:EndDate>11/30/2012 00:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[State Route 35 eastbound in Blount County - Between SR-115 (HWY-129 BYPASS) RT. & (N. HALL RD.) LT. and SR-33 (E. BROADWAY AV.) RT. & LT., a widening project will result in lane closures every day. This work is expected to be completed by 9/28/2013.]]></tsw:Description>
        <curract><![CDATA[The grading, drainage, and paving on U.S. 411 (S.R. 35, Sevierville Pike) beginning west of Walnut Street and extending to east of Bogart Lane in Maryville. Work schedule will be restricted to weather conditions limitation. A detour is in place (with signage) to direct east bound Sevierville Rd (SR35/US411) by way of S. Washington St., E. Lamar Alexander Pkwy, Cherokee St., Crest Rd., Wilcox St., to Sevierville Rd. 

West bound traffic on SR35 (US411) has shift left to the east bound lane 200 feet west of South Everett High Road.  This traffic shift will allow for ongoing utility relocation.

Total Project Length - 0.407 mile]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>2567897.90427447 531214.713899565</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>35.7756927833792 -83.9791799465981</marker>
    </item>
    <item>
      <title>state route 8 both directions in hamilton county - between georgia-tennessee state line and sr-17 (dodds av.) rt., construction work will temporarily slow traffic weeknights. this work is expected to be completed by 10/09/2012. event </title>
      <link>http://maps.google.com/?q=34.9955714727859 -85.2359419595688(1 - SR-8 33 County, - 08-OCT-12 - 09-OCT-12)</link>
      <description>State Route 8 both directions in Hamilton County - Between GEORGIA-TENNESSEE STATE LINE and SR-17 (DODDS AV.) RT., construction work will temporarily slow traffic weeknights. This work is expected to be completed by 10/09/2012.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_64</guid>
      <tsw:COUNTY tsw:countyname="33" tsw:countyid="33" tsw:REGION="2"/>
      <tsw:route tsw:segmentid="SR-8" tsw:routeid="SR-8" tsw:routename="SR-8"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="State Route 8 both directions in Hamilton County - Between GEORGIA-TENNESSEE STATE LINE and SR-17 (DODDS AV.) RT., construction work will temporarily slow traffic weeknights. This work is expected to be completed by 10/09/2012." tsw:event_no="433507" tsw:datecreated="10/08/2012 20:00:00" tsw:daterevised="10/08/2012 12:19:07">
        <tsw:BeginDate>10/08/2012 20:00:00</tsw:BeginDate>
        <tsw:EndDate>10/09/2012 06:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[State Route 8 both directions in Hamilton County - Between GEORGIA-TENNESSEE STATE LINE and SR-17 (DODDS AV.) RT., construction work will temporarily slow traffic weeknights. This work is expected to be completed by 10/09/2012.]]></tsw:Description>
        <curract><![CDATA[Sweeping operation]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>2197358.8604599 241958.612210207</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>34.9955714727859 -85.2359419595688</marker>
    </item>
    <item>
      <title>interstate 55 northbound in shelby county - between mile marker 2 (mile marker: 2) and mile marker 3 (mile marker: 3), construction work with no outside shoulder every day. this work is expected to be completed by 07/31/2013. event </title>
      <link>http://maps.google.com/?q=35.0308732921024 -90.0023059067471(1 - I-55 79 County, - 02-JUL-12 - 30-NOV-12)</link>
      <description>Interstate 55 northbound in Shelby County - Between MILE MARKER 2 (Mile Marker: 2) and MILE MARKER 3 (Mile Marker: 3), construction work with no outside shoulder every day. This work is expected to be completed by 07/31/2013.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_65</guid>
      <tsw:COUNTY tsw:countyname="79" tsw:countyid="79" tsw:REGION="4"/>
      <tsw:route tsw:segmentid="I-55" tsw:routeid="I-55" tsw:routename="I-55"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="Interstate 55 northbound in Shelby County - Between MILE MARKER 2 (Mile Marker: 2) and MILE MARKER 3 (Mile Marker: 3), construction work with no outside shoulder every day. This work is expected to be completed by 07/31/2013." tsw:event_no="414150" tsw:datecreated="07/02/2012 00:00:00" tsw:daterevised="06/06/2013 15:24:33">
        <tsw:BeginDate>07/02/2012 00:00:00</tsw:BeginDate>
        <tsw:EndDate>11/30/2012 00:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[Interstate 55 northbound in Shelby County - Between MILE MARKER 2 (Mile Marker: 2) and MILE MARKER 3 (Mile Marker: 3), construction work with no outside shoulder every day. This work is expected to be completed by 07/31/2013.]]></tsw:Description>
        <curract><![CDATA[Rest Area is Closed.  
MLGW Electrical Division has removed the electrical pole and transformer, but the Water Division of MLGW has quoted a cost of 56K to install the water main.  The water main work was original bid by the Contractor for approximately 40K. MLGW Water Division wants TDOT to provide a bond unless they (MLGW) install the main. TDOT Region is making a decision on this issue.
Contractor is has completed the backfilling the advanced drainage system (Storm Tech 4500) on the north end of the project and installing drainage pipe throughout the project.  During the installation of the drainage pipe on the north end of the project the Contractor hit the existing water main on Wednesday, September 12, 2012.  The contractor excavated north of the cut off valve, which was the existing water meter.  The main was disconnected south of the water meter.  Contractor hauled in fill material to flatten the slopes to 4 to 1 instead of 3 to 1 as originally planned. The concrete slabs are completed but need some punchlist work to correct numerous joint-related blemishes.  The permanent striping was completed on December 3, 2012.
The signs for the handicap ramps have been ordered and will be installed upon completion of the watermain work, if the Contractor is allowed to install the main.
Update:
The Region has gotten all parties (MLGW, TDOT Design, TDOT Finance &amp; Admin, TDOT Construction, and TDOT Utilities) together and has come up with a viable solution.  Main will be installed by the Contractor as soon as payment to MLGW for tap is recorded and approval to proceed is given by MLGW.  Work should take about a week and the Contractor has some punchlist work as well to accomplish.]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>770533.691072139 278413.805639283</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>35.0308732921024 -90.0023059067471</marker>
    </item>
    <item>
      <title>state route 78 both directions in lake county - between sr-21 (lake dr.) rt. &amp; (church st.) lt. and sr-212 (wray rd.) lt., a widening project will cause temporary lane closures on weekdays. this work is expected to be completed by 5/31/2014. event </title>
      <link>http://maps.google.com/?q=36.3914722697098 -89.4627764128091(1 - SR-78 48 County, - 01-FEB-12 - 31-MAY-14)</link>
      <description>State Route 78 both directions in Lake County - Between SR-21 (LAKE DR.) RT. &amp; (CHURCH ST.) LT. and SR-212 (WRAY RD.) LT., a widening project will cause temporary lane closures on weekdays. This work is expected to be completed by 5/31/2014.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_66</guid>
      <tsw:COUNTY tsw:countyname="48" tsw:countyid="48" tsw:REGION="4"/>
      <tsw:route tsw:segmentid="SR-78" tsw:routeid="SR-78" tsw:routename="SR-78"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="State Route 78 both directions in Lake County - Between SR-21 (LAKE DR.) RT. &amp;amp; (CHURCH ST.) LT. and SR-212 (WRAY RD.) LT., a widening project will cause temporary lane closures on weekdays. This work is expected to be completed by 5/31/2014." tsw:event_no="414152" tsw:datecreated="02/01/2012 00:00:00" tsw:daterevised="06/17/2013 13:32:55">
        <tsw:BeginDate>02/01/2012 00:00:00</tsw:BeginDate>
        <tsw:EndDate>05/31/2014 00:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[State Route 78 both directions in Lake County - Between SR-21 (LAKE DR.) RT. & (CHURCH ST.) LT. and SR-212 (WRAY RD.) LT., a widening project will cause temporary lane closures on weekdays. This work is expected to be completed by 5/31/2014.]]></tsw:Description>
        <curract><![CDATA[ Trucks entering and exiting highway on S.R. 22.]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>949472.646072822 767217.633646623</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>36.3914722697098 -89.4627764128091</marker>
    </item>
    <item>
      <title>state route 50 westbound in franklin county - between oak grove road (mile marker: 19.29) and childer creek (mile marker: 18.79), slide repair with no outside shoulder today. this work is expected to be completed by 11/29/2012. event </title>
      <link>http://maps.google.com/?q=35.2281264615218 -86.0474219138818(1 - SR-50 26 County, - 29-NOV-12 - 29-NOV-12)</link>
      <description>State Route 50 westbound in Franklin County - Between OAK GROVE ROAD (Mile Marker: 19.29) and CHILDER CREEK (Mile Marker: 18.79), slide repair with no outside shoulder today. This work is expected to be completed by 11/29/2012.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_67</guid>
      <tsw:COUNTY tsw:countyname="26" tsw:countyid="26" tsw:REGION="2"/>
      <tsw:route tsw:segmentid="SR-50" tsw:routeid="SR-50" tsw:routename="SR-50"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="State Route 50 westbound in Franklin County - Between OAK GROVE ROAD (Mile Marker: 19.29) and CHILDER CREEK (Mile Marker: 18.79), slide repair with no outside shoulder today. This work is expected to be completed by 11/29/2012." tsw:event_no="465727" tsw:datecreated="11/29/2012 08:00:00" tsw:daterevised="11/29/2012 07:21:29">
        <tsw:BeginDate>11/29/2012 08:00:00</tsw:BeginDate>
        <tsw:EndDate>11/29/2012 15:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[State Route 50 westbound in Franklin County - Between OAK GROVE ROAD (Mile Marker: 19.29) and CHILDER CREEK (Mile Marker: 18.79), slide repair with no outside shoulder today. This work is expected to be completed by 11/29/2012.]]></tsw:Description>
        <curract><![CDATA[S.R. 50 L.M. 18.79 CHILDER CREEK TO L.M. 19.29 OAK GROVE RD WORKING ON SLIDE REPAIR ON OUTSIDE SHOULDER OF ROADWAY. TODAY ONLY.]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>1954336.55245299 325717.404814172</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>35.2281264615218 -86.0474219138818</marker>
    </item>
    <item>
      <title>interstate 40 both directions in shelby county - between arkansas-tennessee state line and arkansas-tennessee state line, bridge repair will cause temporary lane closures every day. this work is expected to be completed by 12/15/2014. event </title>
      <link>http://maps.google.com/?q=35.1530476140466 -90.0664803760536(1 - I-40 79 County, - 01-MAY-12 - 15-DEC-14)</link>
      <description>Interstate 40 both directions in Shelby County - Between ARKANSAS-TENNESSEE STATE LINE and ARKANSAS-TENNESSEE STATE LINE, bridge repair will cause temporary lane closures every day. This work is expected to be completed by 12/15/2014.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_68</guid>
      <tsw:COUNTY tsw:countyname="79" tsw:countyid="79" tsw:REGION="4"/>
      <tsw:route tsw:segmentid="I-40" tsw:routeid="I-40" tsw:routename="I-40"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="Interstate 40 both directions in Shelby County - Between ARKANSAS-TENNESSEE STATE LINE and ARKANSAS-TENNESSEE STATE LINE, bridge repair will cause temporary lane closures every day. This work is expected to be completed by 12/15/2014." tsw:event_no="414507" tsw:datecreated="05/01/2012 00:00:00" tsw:daterevised="06/06/2013 15:17:53">
        <tsw:BeginDate>05/01/2012 00:00:00</tsw:BeginDate>
        <tsw:EndDate>12/15/2014 00:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[Interstate 40 both directions in Shelby County - Between ARKANSAS-TENNESSEE STATE LINE and ARKANSAS-TENNESSEE STATE LINE, bridge repair will cause temporary lane closures every day. This work is expected to be completed by 12/15/2014.]]></tsw:Description>
        <curract><![CDATA[Contractor has closed the outer most lane of the eastbound side of Interstate 40.  The closure is located from approximately station 181+00 to 211+00.  The closure is required for safe access and egress to the seismic retrofit on the Arkansas approach of the Hernando DeSoto Bridge. Contractor is reconstructing foundations, columns and pier caps under the bridge approach structure.  The lane closure is anticipated to remain in place until December 2013.]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>753183.280419142 323638.053140255</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>35.1530476140466 -90.0664803760536</marker>
    </item>
    <item>
      <title>interstate 40 both directions in madison county - between mile marker  79 (mile marker: 79) and exit 79:  us-412 / jackson, bridge repair will result in a lane shift every day. this work is expected to be completed by 6/30/2013. event </title>
      <link>http://maps.google.com/?q=35.6562915784493 -88.8756109901041(1 - I-40 57 County, - 06-AUG-12 - 30-JUN-13)</link>
      <description>Interstate 40 both directions in Madison County - Between MILE MARKER  79 (Mile Marker: 79) and EXIT 79:  US-412 / JACKSON, bridge repair will result in a lane shift every day. This work is expected to be completed by 6/30/2013.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_69</guid>
      <tsw:COUNTY tsw:countyname="57" tsw:countyid="57" tsw:REGION="4"/>
      <tsw:route tsw:segmentid="I-40" tsw:routeid="I-40" tsw:routename="I-40"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="Interstate 40 both directions in Madison County - Between MILE MARKER  79 (Mile Marker: 79) and EXIT 79:  US-412 / JACKSON, bridge repair will result in a lane shift every day. This work is expected to be completed by 6/30/2013." tsw:event_no="447538" tsw:datecreated="08/06/2012 00:00:00" tsw:daterevised="06/19/2013 15:46:43">
        <tsw:BeginDate>08/06/2012 00:00:00</tsw:BeginDate>
        <tsw:EndDate>06/30/2013 00:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[Interstate 40 both directions in Madison County - Between MILE MARKER  79 (Mile Marker: 79) and EXIT 79:  US-412 / JACKSON, bridge repair will result in a lane shift every day. This work is expected to be completed by 6/30/2013.]]></tsw:Description>
        <curract><![CDATA[I-40 lane closures in both directions beginning June 21 at 8:00pm until June 24 at 6:00am.  Speed limit reduced to 60mph through work zone in both directions.]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>1114346.7792484 494113.315197397</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>35.6562915784493 -88.8756109901041</marker>
    </item>
    <item>
      <title>state route 15 both directions in wayne county - between sr-114 billy nance hwy. lt. and sr-99 (state hwy-99 e.) lt., a widening project will temporarily slow traffic every day. this work is expected to be completed by 5/31/2015. event </title>
      <link>http://maps.google.com/?q=35.2960486023977 -87.836811845539(1 - SR-15 91 County, - 01-OCT-12 - 31-MAY-15)</link>
      <description>State Route 15 both directions in Wayne County - Between SR-114 BILLY NANCE HWY. LT. and SR-99 (STATE HWY-99 E.) LT., a widening project will temporarily slow traffic every day. This work is expected to be completed by 5/31/2015.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_70</guid>
      <tsw:COUNTY tsw:countyname="91" tsw:countyid="91" tsw:REGION="3"/>
      <tsw:route tsw:segmentid="SR-15" tsw:routeid="SR-15" tsw:routename="SR-15"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="State Route 15 both directions in Wayne County - Between SR-114 BILLY NANCE HWY. LT. and SR-99 (STATE HWY-99 E.) LT., a widening project will temporarily slow traffic every day. This work is expected to be completed by 5/31/2015." tsw:event_no="445168" tsw:datecreated="10/01/2012 00:00:00" tsw:daterevised="04/05/2013 10:32:11">
        <tsw:BeginDate>10/01/2012 00:00:00</tsw:BeginDate>
        <tsw:EndDate>05/31/2015 00:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[State Route 15 both directions in Wayne County - Between SR-114 BILLY NANCE HWY. LT. and SR-99 (STATE HWY-99 E.) LT., a widening project will temporarily slow traffic every day. This work is expected to be completed by 5/31/2015.]]></tsw:Description>
        <curract><![CDATA[Contractor is presently clearing right of way, pouring concrete box bridges and, excavating soils for enbankments.  Some excavation is requiring blasting.  The roadway may be closed for short periods prior to blasting.  Motorists should use caution while traveling through this project and watch for large trucks entering the highway.]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>1420397.72336704 355580.743843881</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>35.2960486023977 -87.836811845539</marker>
    </item>
    <item>
      <title>interstate 24 both directions in rutherford county - between mile marker 64 (mile marker: 64) and mile marker 96 (mile marker: 96), construction work will result in lane closures at night. this work is expected to be completed by 7/31/2017. event </title>
      <link>http://maps.google.com/?q=35.8259167588701 -86.4119592138334(1 - I-24 75 County, - 01-AUG-12 - 31-JUL-17)</link>
      <description>Interstate 24 both directions in Rutherford County - Between MILE MARKER 64 (Mile Marker: 64) and MILE MARKER 96 (Mile Marker: 96), construction work will result in lane closures at night. This work is expected to be completed by 7/31/2017.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_71</guid>
      <tsw:COUNTY tsw:countyname="75" tsw:countyid="75" tsw:REGION="3"/>
      <tsw:route tsw:segmentid="I-24" tsw:routeid="I-24" tsw:routename="I-24"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="Interstate 24 both directions in Rutherford County - Between MILE MARKER 64 (Mile Marker: 64) and MILE MARKER 96 (Mile Marker: 96), construction work will result in lane closures at night. This work is expected to be completed by 7/31/2017." tsw:event_no="472396" tsw:datecreated="08/01/2012 00:00:00" tsw:daterevised="06/12/2013 10:26:35">
        <tsw:BeginDate>08/01/2012 00:00:00</tsw:BeginDate>
        <tsw:EndDate>07/31/2017 00:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[Interstate 24 both directions in Rutherford County - Between MILE MARKER 64 (Mile Marker: 64) and MILE MARKER 96 (Mile Marker: 96), construction work will result in lane closures at night. This work is expected to be completed by 7/31/2017.]]></tsw:Description>
        <curract><![CDATA[Thursday June 13 through Wednesday June 19, 8PM-5AM, There will be possible lane closures at the following locations on State Routes and Interstates in Middle Tennessee to repair guardrail on an as needed basis:

I-24, Rutherford ]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>1846376.906363 543565.095409001</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>35.8259167588701 -86.4119592138334</marker>
    </item>
    <item>
      <title>interstate 65 both directions in williamson county - between mile marker 53 (mile marker: 53) and mile marker 74 (mile marker: 74), construction work will result in lane closures at night. this work is expected to be completed by 7/31/2017. event </title>
      <link>http://maps.google.com/?q=35.8863107512329 -86.8299519409876(1 - I-65 94 County, - 01-AUG-12 - 31-JUL-17)</link>
      <description>Interstate 65 both directions in Williamson County - Between MILE MARKER 53 (Mile Marker: 53) and MILE MARKER 74 (Mile Marker: 74), construction work will result in lane closures at night. This work is expected to be completed by 7/31/2017.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_72</guid>
      <tsw:COUNTY tsw:countyname="94" tsw:countyid="94" tsw:REGION="3"/>
      <tsw:route tsw:segmentid="I-65" tsw:routeid="I-65" tsw:routename="I-65"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="Interstate 65 both directions in Williamson County - Between MILE MARKER 53 (Mile Marker: 53) and MILE MARKER 74 (Mile Marker: 74), construction work will result in lane closures at night. This work is expected to be completed by 7/31/2017." tsw:event_no="472398" tsw:datecreated="08/01/2012 00:00:00" tsw:daterevised="06/12/2013 10:27:42">
        <tsw:BeginDate>08/01/2012 00:00:00</tsw:BeginDate>
        <tsw:EndDate>07/31/2017 00:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[Interstate 65 both directions in Williamson County - Between MILE MARKER 53 (Mile Marker: 53) and MILE MARKER 74 (Mile Marker: 74), construction work will result in lane closures at night. This work is expected to be completed by 7/31/2017.]]></tsw:Description>
        <curract><![CDATA[Thursday June 13 through Wednesday June 19, 8PM-5AM, There will be possible lane closures at the following locations on State Routes and Interstates in Middle Tennessee to repair guardrail on an as needed basis:

I-65, Williamson
]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>1722653.86218829 566334.547834676</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>35.8863107512329 -86.8299519409876</marker>
    </item>
    <item>
      <title>state route 840 both directions in williamson county - between mile marker 28 (mile marker: 28) and mile marker 45 (mile marker: 45), construction work will result in lane closures on weekdays. this work is expected to be completed by 7/31/2017. event </title>
      <link>http://maps.google.com/?q=35.8276385229873 -86.7384343263875(1 - SR-840 94 County, - 01-AUG-12 - 31-JUL-17)</link>
      <description>State Route 840 both directions in Williamson County - Between MILE MARKER 28 (Mile Marker: 28) and MILE MARKER 45 (Mile Marker: 45), construction work will result in lane closures on weekdays. This work is expected to be completed by 7/31/2017.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_73</guid>
      <tsw:COUNTY tsw:countyname="94" tsw:countyid="94" tsw:REGION="3"/>
      <tsw:route tsw:segmentid="SR-840" tsw:routeid="SR-840" tsw:routename="SR-840"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="State Route 840 both directions in Williamson County - Between MILE MARKER 28 (Mile Marker: 28) and MILE MARKER 45 (Mile Marker: 45), construction work will result in lane closures on weekdays. This work is expected to be completed by 7/31/2017." tsw:event_no="472368" tsw:datecreated="08/01/2012 00:00:00" tsw:daterevised="06/12/2013 10:33:03">
        <tsw:BeginDate>08/01/2012 00:00:00</tsw:BeginDate>
        <tsw:EndDate>07/31/2017 00:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[State Route 840 both directions in Williamson County - Between MILE MARKER 28 (Mile Marker: 28) and MILE MARKER 45 (Mile Marker: 45), construction work will result in lane closures on weekdays. This work is expected to be completed by 7/31/2017.]]></tsw:Description>
        <curract><![CDATA[Thursday June 13 through Wednesday June 19, 9AM-3PM, There will be possible lane closures at the following locations on State Routes and Interstates in Middle Tennessee to patch potholes on an as needed basis:

SR 840, Williamson]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>1749601.2742843 544760.625983677</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>35.8276385229873 -86.7384343263875</marker>
    </item>
    <item>
      <title>interstate 65 both directions in williamson county - between mile marker 53 (mile marker: 53) and mile marker 74 (mile marker: 74), construction work will result in lane closures on weekdays. this work is expected to be completed by 7/31/2017. event </title>
      <link>http://maps.google.com/?q=35.8863107512329 -86.8299519409876(1 - I-65 94 County, - 01-AUG-12 - 31-JUL-17)</link>
      <description>Interstate 65 both directions in Williamson County - Between MILE MARKER 53 (Mile Marker: 53) and MILE MARKER 74 (Mile Marker: 74), construction work will result in lane closures on weekdays. This work is expected to be completed by 7/31/2017.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_74</guid>
      <tsw:COUNTY tsw:countyname="94" tsw:countyid="94" tsw:REGION="3"/>
      <tsw:route tsw:segmentid="I-65" tsw:routeid="I-65" tsw:routename="I-65"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="Interstate 65 both directions in Williamson County - Between MILE MARKER 53 (Mile Marker: 53) and MILE MARKER 74 (Mile Marker: 74), construction work will result in lane closures on weekdays. This work is expected to be completed by 7/31/2017." tsw:event_no="472390" tsw:datecreated="08/01/2012 00:00:00" tsw:daterevised="06/12/2013 10:32:03">
        <tsw:BeginDate>08/01/2012 00:00:00</tsw:BeginDate>
        <tsw:EndDate>07/31/2017 00:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[Interstate 65 both directions in Williamson County - Between MILE MARKER 53 (Mile Marker: 53) and MILE MARKER 74 (Mile Marker: 74), construction work will result in lane closures on weekdays. This work is expected to be completed by 7/31/2017.]]></tsw:Description>
        <curract><![CDATA[Thursday June 13 through Wednesday June 19, 9AM-3PM, There will be possible lane closures at the following locations on State Routes and Interstates in Middle Tennessee to patch potholes on an as needed basis:

I-65, Williamson
]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>1722653.86218829 566334.547834676</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>35.8863107512329 -86.8299519409876</marker>
    </item>
    <item>
      <title>state route 840 both directions in rutherford county - between mile marker 46 (mile marker: 46) and mile marker 65 (mile marker: 65), construction work will result in lane closures at night. this work is expected to be completed by 7/31/2017. event </title>
      <link>http://maps.google.com/?q=35.910780898476 -86.4422713423495(1 - SR-840 75 County, - 01-AUG-12 - 31-JUL-17)</link>
      <description>State Route 840 both directions in Rutherford County - Between MILE MARKER 46 (Mile Marker: 46) and MILE MARKER 65 (Mile Marker: 65), construction work will result in lane closures at night. This work is expected to be completed by 7/31/2017.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_75</guid>
      <tsw:COUNTY tsw:countyname="75" tsw:countyid="75" tsw:REGION="3"/>
      <tsw:route tsw:segmentid="SR-840" tsw:routeid="SR-840" tsw:routename="SR-840"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="State Route 840 both directions in Rutherford County - Between MILE MARKER 46 (Mile Marker: 46) and MILE MARKER 65 (Mile Marker: 65), construction work will result in lane closures at night. This work is expected to be completed by 7/31/2017." tsw:event_no="472391" tsw:datecreated="08/01/2012 00:00:00" tsw:daterevised="06/12/2013 10:31:12">
        <tsw:BeginDate>08/01/2012 00:00:00</tsw:BeginDate>
        <tsw:EndDate>07/31/2017 00:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[State Route 840 both directions in Rutherford County - Between MILE MARKER 46 (Mile Marker: 46) and MILE MARKER 65 (Mile Marker: 65), construction work will result in lane closures at night. This work is expected to be completed by 7/31/2017.]]></tsw:Description>
        <curract><![CDATA[Thursday June 13 through Wednesday June 19, 8PM-5AM, There will be possible lane closures at the following locations on State Routes and Interstates in Middle Tennessee to repair guardrail on an as needed basis:

SR 840, Rutherford ]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>1837530.69811512 574495.502057641</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>35.910780898476 -86.4422713423495</marker>
    </item>
    <item>
      <title>state route 840 both directions in williamson county - between mile marker 28 (mile marker: 28) and mile marker 45 (mile marker: 45), construction work will result in lane closures at night. this work is expected to be completed by 7/31/2017. event </title>
      <link>http://maps.google.com/?q=35.8276385229873 -86.7384343263875(1 - SR-840 94 County, - 01-AUG-12 - 31-JUL-17)</link>
      <description>State Route 840 both directions in Williamson County - Between MILE MARKER 28 (Mile Marker: 28) and MILE MARKER 45 (Mile Marker: 45), construction work will result in lane closures at night. This work is expected to be completed by 7/31/2017.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_76</guid>
      <tsw:COUNTY tsw:countyname="94" tsw:countyid="94" tsw:REGION="3"/>
      <tsw:route tsw:segmentid="SR-840" tsw:routeid="SR-840" tsw:routename="SR-840"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="State Route 840 both directions in Williamson County - Between MILE MARKER 28 (Mile Marker: 28) and MILE MARKER 45 (Mile Marker: 45), construction work will result in lane closures at night. This work is expected to be completed by 7/31/2017." tsw:event_no="472392" tsw:datecreated="08/01/2012 00:00:00" tsw:daterevised="06/12/2013 10:30:32">
        <tsw:BeginDate>08/01/2012 00:00:00</tsw:BeginDate>
        <tsw:EndDate>07/31/2017 00:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[State Route 840 both directions in Williamson County - Between MILE MARKER 28 (Mile Marker: 28) and MILE MARKER 45 (Mile Marker: 45), construction work will result in lane closures at night. This work is expected to be completed by 7/31/2017.]]></tsw:Description>
        <curract><![CDATA[Thursday June 13 through Wednesday June 19, 8PM-5AM, There will be possible lane closures at the following locations on State Routes and Interstates in Middle Tennessee to repair guardrail on an as needed basis:

SR 840, Williamson]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>1749601.2742843 544760.625983677</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>35.8276385229873 -86.7384343263875</marker>
    </item>
    <item>
      <title>state route 840 both directions in wilson county - between mile marker 66 (mile marker: 66) and mile marker 76 (mile marker: 76), construction work will result in lane closures at night. this work is expected to be completed by 7/31/2017. event </title>
      <link>http://maps.google.com/?q=36.1227106659915 -86.4062569906615(1 - SR-840 95 County, - 01-AUG-12 - 31-JUL-17)</link>
      <description>State Route 840 both directions in Wilson County - Between MILE MARKER 66 (Mile Marker: 66) and MILE MARKER 76 (Mile Marker: 76), construction work will result in lane closures at night. This work is expected to be completed by 7/31/2017.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_77</guid>
      <tsw:COUNTY tsw:countyname="95" tsw:countyid="95" tsw:REGION="3"/>
      <tsw:route tsw:segmentid="SR-840" tsw:routeid="SR-840" tsw:routename="SR-840"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="State Route 840 both directions in Wilson County - Between MILE MARKER 66 (Mile Marker: 66) and MILE MARKER 76 (Mile Marker: 76), construction work will result in lane closures at night. This work is expected to be completed by 7/31/2017." tsw:event_no="472395" tsw:datecreated="08/01/2012 00:00:00" tsw:daterevised="06/12/2013 10:29:39">
        <tsw:BeginDate>08/01/2012 00:00:00</tsw:BeginDate>
        <tsw:EndDate>07/31/2017 00:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[State Route 840 both directions in Wilson County - Between MILE MARKER 66 (Mile Marker: 66) and MILE MARKER 76 (Mile Marker: 76), construction work will result in lane closures at night. This work is expected to be completed by 7/31/2017.]]></tsw:Description>
        <curract><![CDATA[Thursday June 13 through Wednesday June 19, 8PM-5AM, There will be possible lane closures at the following locations on State Routes and Interstates in Middle Tennessee to repair guardrail on an as needed basis:

SR 840, Wilson

]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>1848515.76510216 651595.760415041</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>36.1227106659915 -86.4062569906615</marker>
    </item>
    <item>
      <title>state route 840 both directions in rutherford county - between mile marker 64 (mile marker: 64) and mile marker 65 (mile marker: 65), construction work will result in lane closures on weekdays. this work is expected to be completed by 7/31/2017. event </title>
      <link>http://maps.google.com/?q=36.0343660260322 -86.4286769583467(1 - SR-840 75 County, - 01-AUG-12 - 31-JUL-17)</link>
      <description>State Route 840 both directions in Rutherford County - Between MILE MARKER 64 (Mile Marker: 64) and MILE MARKER 65 (Mile Marker: 65), construction work will result in lane closures on weekdays. This work is expected to be completed by 7/31/2017.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_78</guid>
      <tsw:COUNTY tsw:countyname="75" tsw:countyid="75" tsw:REGION="3"/>
      <tsw:route tsw:segmentid="SR-840" tsw:routeid="SR-840" tsw:routename="SR-840"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="State Route 840 both directions in Rutherford County - Between MILE MARKER 64 (Mile Marker: 64) and MILE MARKER 65 (Mile Marker: 65), construction work will result in lane closures on weekdays. This work is expected to be completed by 7/31/2017." tsw:event_no="472347" tsw:datecreated="08/01/2012 00:00:00" tsw:daterevised="06/12/2013 10:33:33">
        <tsw:BeginDate>08/01/2012 00:00:00</tsw:BeginDate>
        <tsw:EndDate>07/31/2017 00:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[State Route 840 both directions in Rutherford County - Between MILE MARKER 64 (Mile Marker: 64) and MILE MARKER 65 (Mile Marker: 65), construction work will result in lane closures on weekdays. This work is expected to be completed by 7/31/2017.]]></tsw:Description>
        <curract><![CDATA[Thursday June 13 through Wednesday June 19, 9AM-3PM, There will be possible lane closures at the following locations on State Routes and Interstates in Middle Tennessee to patch potholes on an as needed basis:

SR 840, Rutherford ]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>1841753.41198561 619464.451143965</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>36.0343660260322 -86.4286769583467</marker>
    </item>
    <item>
      <title>state route 73 both directions in loudon county - between sr-2 (broadway st.) rt. &amp; lt. and sr-444 (tellico pkwy.) lt., bridge replacement construction will cause temporary lane closures every day. this work is expected to be completed by 5/31/2015. event </title>
      <link>http://maps.google.com/?q=35.7952450149053 -84.2454834611293(1 - SR-73 53 County, - 07-AUG-12 - 31-MAY-15)</link>
      <description>State Route 73 both directions in Loudon County - Between SR-2 (BROADWAY ST.) RT. &amp; LT. and SR-444 (TELLICO PKWY.) LT., bridge replacement construction will cause temporary lane closures every day. This work is expected to be completed by 5/31/2015.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_79</guid>
      <tsw:COUNTY tsw:countyname="53" tsw:countyid="53" tsw:REGION="1"/>
      <tsw:route tsw:segmentid="SR-73" tsw:routeid="SR-73" tsw:routename="SR-73"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="State Route 73 both directions in Loudon County - Between SR-2 (BROADWAY ST.) RT. &amp;amp; LT. and SR-444 (TELLICO PKWY.) LT., bridge replacement construction will cause temporary lane closures every day. This work is expected to be completed by 5/31/2015." tsw:event_no="467188" tsw:datecreated="08/07/2012 00:00:00" tsw:daterevised="03/28/2013 08:52:36">
        <tsw:BeginDate>08/07/2012 00:00:00</tsw:BeginDate>
        <tsw:EndDate>05/31/2015 00:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[State Route 73 both directions in Loudon County - Between SR-2 (BROADWAY ST.) RT. & LT. and SR-444 (TELLICO PKWY.) LT., bridge replacement construction will cause temporary lane closures every day. This work is expected to be completed by 5/31/2015.]]></tsw:Description>
        <curract><![CDATA[Crews are placing both graded solid rock and dirt fill throughout the project.  The contractor is also coordinating with TVA regarding blasting plans and submittals for work expected at the Tellico Canal Bridge.  Please be alert when traveling through the project limits.  Traffic should have minimal impacts due to realignment; however, temporary intermittent lane closures may be expected durning utility relocation efforts.]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>2488790.81333113 536807.167020523</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>35.7952450149053 -84.2454834611293</marker>
    </item>
    <item>
      <title>state route 840 both directions in wilson county - between mile marker 66 (mile marker: 66) and mile marker 76 (mile marker: 76), construction work will result in lane closures on weekdays. this work is expected to be completed by 7/31/2017. event </title>
      <link>http://maps.google.com/?q=36.1227106659915 -86.4062569906615(1 - SR-840 95 County, - 01-AUG-12 - 31-JUL-17)</link>
      <description>State Route 840 both directions in Wilson County - Between MILE MARKER 66 (Mile Marker: 66) and MILE MARKER 76 (Mile Marker: 76), construction work will result in lane closures on weekdays. This work is expected to be completed by 7/31/2017.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_80</guid>
      <tsw:COUNTY tsw:countyname="95" tsw:countyid="95" tsw:REGION="3"/>
      <tsw:route tsw:segmentid="SR-840" tsw:routeid="SR-840" tsw:routename="SR-840"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="State Route 840 both directions in Wilson County - Between MILE MARKER 66 (Mile Marker: 66) and MILE MARKER 76 (Mile Marker: 76), construction work will result in lane closures on weekdays. This work is expected to be completed by 7/31/2017." tsw:event_no="472387" tsw:datecreated="08/01/2012 00:00:00" tsw:daterevised="06/12/2013 10:32:36">
        <tsw:BeginDate>08/01/2012 00:00:00</tsw:BeginDate>
        <tsw:EndDate>07/31/2017 00:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[State Route 840 both directions in Wilson County - Between MILE MARKER 66 (Mile Marker: 66) and MILE MARKER 76 (Mile Marker: 76), construction work will result in lane closures on weekdays. This work is expected to be completed by 7/31/2017.]]></tsw:Description>
        <curract><![CDATA[Thursday June 13 through Wednesday June 19, 9AM-3PM, There will be possible lane closures at the following locations on State Routes and Interstates in Middle Tennessee to patch potholes on an as needed basis:

SR 840, Wilson
]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>1848515.76510216 651595.760415041</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>36.1227106659915 -86.4062569906615</marker>
    </item>
    <item>
      <title>state route 1(us-70) both directions in shelby county - between i-40 center of overhead and leave sr-4 (danny thomas blvd.) lt., bridge repair will result in narrowed lanes every day. this work is expected to be completed by 6/30/2013. event </title>
      <link>http://maps.google.com/?q=35.1533138024585 -90.0388571927732(1 - SR-1 79 County, - 06-NOV-12 - 30-JUN-13)</link>
      <description>State Route 1(US-70) both directions in Shelby County - Between I-40 CENTER OF OVERHEAD and LEAVE SR-4 (DANNY THOMAS BLVD.) LT., bridge repair will result in narrowed lanes every day. This work is expected to be completed by 6/30/2013.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_81</guid>
      <tsw:COUNTY tsw:countyname="79" tsw:countyid="79" tsw:REGION="4"/>
      <tsw:route tsw:segmentid="SR-1" tsw:routeid="SR-1" tsw:routename="SR-1"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="State Route 1(US-70) both directions in Shelby County - Between I-40 CENTER OF OVERHEAD and LEAVE SR-4 (DANNY THOMAS BLVD.) LT., bridge repair will result in narrowed lanes every day. This work is expected to be completed by 6/30/2013." tsw:event_no="481247" tsw:datecreated="11/06/2012 00:00:00" tsw:daterevised="06/06/2013 15:32:30">
        <tsw:BeginDate>11/06/2012 00:00:00</tsw:BeginDate>
        <tsw:EndDate>06/30/2013 00:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[State Route 1(US-70) both directions in Shelby County - Between I-40 CENTER OF OVERHEAD and LEAVE SR-4 (DANNY THOMAS BLVD.) LT., bridge repair will result in narrowed lanes every day. This work is expected to be completed by 6/30/2013.]]></tsw:Description>
        <curract><![CDATA[S.R. 1 (Danny Thomas Blvd.) is completed except for striping.  Presently, all lanes are open on SR 1 until Traf Mark comes back to place permanent thermoplastic markings. Work is 95% Complete.

On I-40 East and I-40 West, the inside shoulders are closed using portable barrier rail.  The barrier rail will be removed untilizing inside lane closures on this Saturday, June 8th, 2013.

All Traffic Lanes are open on SR 1
All Traffic Lanes are open on I-40 except for Saturday, June 8th, 2013.

]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>761438.096206191 323393.003266928</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>35.1533138024585 -90.0388571927732</marker>
    </item>
    <item>
      <title>state route 66 both directions in hawkins county - between pick-up sr-70 (hwy.70) rt. and overhead [37sr0010009]:  sr-1 (hwy-11w) / {leave sr-70 rt. for sr-1 pick-up / center of overhead}, bridge repair will result in lane closures every day. this work is expected to be completed by 6/30/2013. event </title>
      <link>http://maps.google.com/?q=36.3790974636586 -83.0114238084385(1 - SR-66 37 County, - 14-JAN-13 - 30-JUN-13)</link>
      <description>State Route 66 both directions in Hawkins County - Between PICK-UP SR-70 (HWY.70) RT. and OVERHEAD [37SR0010009]:  SR-1 (HWY-11W) / {LEAVE SR-70 RT. FOR SR-1 PICK-UP / CENTER OF OVERHEAD}, bridge repair will result in lane closures every day. This work is expected to be completed by 6/30/2013.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_82</guid>
      <tsw:COUNTY tsw:countyname="37" tsw:countyid="37" tsw:REGION="1"/>
      <tsw:route tsw:segmentid="SR-66" tsw:routeid="SR-66" tsw:routename="SR-66"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="State Route 66 both directions in Hawkins County - Between PICK-UP SR-70 (HWY.70) RT. and OVERHEAD [37SR0010009]:  SR-1 (HWY-11W) / {LEAVE SR-70 RT. FOR SR-1 PICK-UP / CENTER OF OVERHEAD}, bridge repair will result in lane closures every day. This work is expected to be completed by 6/30/2013." tsw:event_no="481311" tsw:datecreated="01/14/2013 00:00:00" tsw:daterevised="06/11/2013 11:32:14">
        <tsw:BeginDate>01/14/2013 00:00:00</tsw:BeginDate>
        <tsw:EndDate>06/30/2013 00:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[State Route 66 both directions in Hawkins County - Between PICK-UP SR-70 (HWY.70) RT. and OVERHEAD [37SR0010009]:  SR-1 (HWY-11W) / {LEAVE SR-70 RT. FOR SR-1 PICK-UP / CENTER OF OVERHEAD}, bridge repair will result in lane closures every day. This work is expected to be completed by 6/30/2013.]]></tsw:Description>
        <curract><![CDATA[Bridge repair work will be continuing until June 30, 2013. This work requires the closure of one lane (12&#39; 6&quot; LANE WIDTH) and the use of a temporary red light system. Motorists should EXPECT DELAYS OF AROUND 25 MINUTES. Be alert to construction equipment and workers. SPEED LIMIT : 45MPH]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>2848163.87988604 758115.021446619</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>36.3790974636586 -83.0114238084385</marker>
    </item>
    <item>
      <title>state route 99 both directions in lewis county - between leave sr-20 w. main st. lt. and lewis-maury county line, a widening project will result in a lane shift on weekdays. this work is expected to be completed by 7/31/2015. event </title>
      <link>http://maps.google.com/?q=35.5837192534519 -87.442850529395(1 - SR-99 51 County, - 04-FEB-13 - 31-JUL-15)</link>
      <description>State Route 99 both directions in Lewis County - Between LEAVE SR-20 W. MAIN ST. LT. and LEWIS-MAURY COUNTY LINE, a widening project will result in a lane shift on weekdays. This work is expected to be completed by 7/31/2015.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_83</guid>
      <tsw:COUNTY tsw:countyname="51" tsw:countyid="51" tsw:REGION="3"/>
      <tsw:route tsw:segmentid="SR-99" tsw:routeid="SR-99" tsw:routename="SR-99"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="State Route 99 both directions in Lewis County - Between LEAVE SR-20 W. MAIN ST. LT. and LEWIS-MAURY COUNTY LINE, a widening project will result in a lane shift on weekdays. This work is expected to be completed by 7/31/2015." tsw:event_no="505848" tsw:datecreated="02/04/2013 06:00:00" tsw:daterevised="06/06/2013 10:04:03">
        <tsw:BeginDate>02/04/2013 06:00:00</tsw:BeginDate>
        <tsw:EndDate>07/31/2015 18:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[State Route 99 both directions in Lewis County - Between LEAVE SR-20 W. MAIN ST. LT. and LEWIS-MAURY COUNTY LINE, a widening project will result in a lane shift on weekdays. This work is expected to be completed by 7/31/2015.]]></tsw:Description>
        <curract><![CDATA[Now through July 31st 2015, the roadway will be under construction for widening the road from 2 lanes to 4 lanes. Motorist are cautioned to be alert for workers and equipment in this area.]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>1539489.26246473 458310.048430614</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>35.5837192534519 -87.442850529395</marker>
    </item>
    <item>
      <title>state route 10 both directions in bedford county - between pick-up sr-64 (lewis av.) lt. and sr-387 (lane pkwy.) lt., bridge repair will cause a reduction in lanes from three to two lanes every day. this work is expected to be completed by 4/30/2014. event </title>
      <link>http://maps.google.com/?q=35.4802279424813 -86.4643491066116(1 - SR-10 02 County, - 01-FEB-13 - 30-APR-14)</link>
      <description>State Route 10 both directions in Bedford County - Between PICK-UP SR-64 (LEWIS AV.) LT. and SR-387 (LANE PKWY.) LT., bridge repair will cause a reduction in lanes from three to two lanes every day. This work is expected to be completed by 4/30/2014.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_84</guid>
      <tsw:COUNTY tsw:countyname="02" tsw:countyid="02" tsw:REGION="3"/>
      <tsw:route tsw:segmentid="SR-10" tsw:routeid="SR-10" tsw:routename="SR-10"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="State Route 10 both directions in Bedford County - Between PICK-UP SR-64 (LEWIS AV.) LT. and SR-387 (LANE PKWY.) LT., bridge repair will cause a reduction in lanes from three to two lanes every day. This work is expected to be completed by 4/30/2014." tsw:event_no="493630" tsw:datecreated="02/01/2013 06:00:00" tsw:daterevised="05/28/2013 10:54:26">
        <tsw:BeginDate>02/01/2013 06:00:00</tsw:BeginDate>
        <tsw:EndDate>04/30/2014 19:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[State Route 10 both directions in Bedford County - Between PICK-UP SR-64 (LEWIS AV.) LT. and SR-387 (LANE PKWY.) LT., bridge repair will cause a reduction in lanes from three to two lanes every day. This work is expected to be completed by 4/30/2014.]]></tsw:Description>
        <curract><![CDATA[Motorist should be aware of lane shifts throughout the project.]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>1830249.29299161 417805.13804765</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>35.4802279424813 -86.4643491066116</marker>
    </item>
    <item>
      <title>state route 34 both directions in greene county - between sr-107 tusculum by-pass rt. and sr-351 (rheatown rd.) rt. &amp; lt., intersection modification work will result in a lane shift every day. this work is expected to be completed by 9/30/2013. event </title>
      <link>http://maps.google.com/?q=36.2041605511837 -82.7176377610867(1 - SR-34 30 County, - 25-FEB-13 - 30-SEP-13)</link>
      <description>State Route 34 both directions in Greene County - Between SR-107 TUSCULUM BY-PASS RT. and SR-351 (RHEATOWN RD.) RT. &amp; LT., intersection modification work will result in a lane shift every day. This work is expected to be completed by 9/30/2013.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_85</guid>
      <tsw:COUNTY tsw:countyname="30" tsw:countyid="30" tsw:REGION="1"/>
      <tsw:route tsw:segmentid="SR-34" tsw:routeid="SR-34" tsw:routename="SR-34"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="State Route 34 both directions in Greene County - Between SR-107 TUSCULUM BY-PASS RT. and SR-351 (RHEATOWN RD.) RT. &amp;amp; LT., intersection modification work will result in a lane shift every day. This work is expected to be completed by 9/30/2013." tsw:event_no="501887" tsw:datecreated="02/25/2013 00:00:00" tsw:daterevised="06/11/2013 11:31:00">
        <tsw:BeginDate>02/25/2013 00:00:00</tsw:BeginDate>
        <tsw:EndDate>09/30/2013 00:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[State Route 34 both directions in Greene County - Between SR-107 TUSCULUM BY-PASS RT. and SR-351 (RHEATOWN RD.) RT. & LT., intersection modification work will result in a lane shift every day. This work is expected to be completed by 9/30/2013.]]></tsw:Description>
        <curract><![CDATA[Motorists should be alert to the lane shifts, construction workers, and equipment. Contractor will be working on widening the existing shoulder in order to construct a better intersection with Rheatown Road and Chuckey Pike. This work will take place behind a protective wall and during daylight hours and should be completed by September 30, 2013.]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>2936742.04642414 697235.6580668</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>36.2041605511837 -82.7176377610867</marker>
    </item>
    <item>
      <title>state route 311 eastbound in bradley county - between i-75 (hwy-74) rt. &amp; i-75 lt. / {center of overhead} / (begin hwy-74) / {us-74} and sr-60 mcgrady dr. rt. &amp; sr-60 us-64bp / 74 front, its construction with no outside shoulder on weekdays. this work is expected to be completed by 7/15/2013. event </title>
      <link>http://maps.google.com/?q=35.1370348621506 -84.9078361266071(1 - SR-311 06 County, - 08-OCT-12 - 30-NOV-12)</link>
      <description>State Route 311 eastbound in Bradley County - Between I-75 (HWY-74) RT. &amp; I-75 LT. / {CENTER OF OVERHEAD} / (BEGIN HWY-74) / {US-74} and SR-60 MCGRADY DR. RT. &amp; SR-60 US-64BP / 74 FRONT, ITS construction with no outside shoulder on weekdays. This work is expected to be completed by 7/15/2013.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_86</guid>
      <tsw:COUNTY tsw:countyname="06" tsw:countyid="06" tsw:REGION="2"/>
      <tsw:route tsw:segmentid="SR-311" tsw:routeid="SR-311" tsw:routename="SR-311"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="State Route 311 eastbound in Bradley County - Between I-75 (HWY-74) RT. &amp;amp; I-75 LT. / {CENTER OF OVERHEAD} / (BEGIN HWY-74) / {US-74} and SR-60 MCGRADY DR. RT. &amp;amp; SR-60 US-64BP / 74 FRONT, ITS construction with no outside shoulder on weekdays. This work is expected to be completed by 7/15/2013." tsw:event_no="436807" tsw:datecreated="10/08/2012 00:00:00" tsw:daterevised="06/14/2013 14:08:53">
        <tsw:BeginDate>10/08/2012 00:00:00</tsw:BeginDate>
        <tsw:EndDate>11/30/2012 00:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[State Route 311 eastbound in Bradley County - Between I-75 (HWY-74) RT. & I-75 LT. / {CENTER OF OVERHEAD} / (BEGIN HWY-74) / {US-74} and SR-60 MCGRADY DR. RT. & SR-60 US-64BP / 74 FRONT, ITS construction with no outside shoulder on weekdays. This work is expected to be completed by 7/15/2013.]]></tsw:Description>
        <curract><![CDATA[Work is almost completely finished.  Still some minor things to be done.  Flaggers will assist if needed.  ]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>2295058.55574047 294379.401646235</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>35.1370348621506 -84.9078361266071</marker>
    </item>
    <item>
      <title>state route 60 both directions in bradley county - between sr-317 (weatherly switch rd.) lt. and pick-up sr-311 (dalton pk.) lt., a widening project will result in a lane shift every day. this work is expected to be completed by 06/30/2013. event </title>
      <link>http://maps.google.com/?q=35.0740100431235 -84.8929024301989(1 - SR-60 06 County, - 16-DEC-09 - 30-JUN-13)</link>
      <description>State Route 60 both directions in Bradley County - Between SR-317 (WEATHERLY SWITCH RD.) LT. and PICK-UP SR-311 (DALTON PK.) LT., a widening project will result in a lane shift every day. This work is expected to be completed by 06/30/2013.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_87</guid>
      <tsw:COUNTY tsw:countyname="06" tsw:countyid="06" tsw:REGION="2"/>
      <tsw:route tsw:segmentid="SR-60" tsw:routeid="SR-60" tsw:routename="SR-60"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="State Route 60 both directions in Bradley County - Between SR-317 (WEATHERLY SWITCH RD.) LT. and PICK-UP SR-311 (DALTON PK.) LT., a widening project will result in a lane shift every day. This work is expected to be completed by 06/30/2013." tsw:event_no="490810" tsw:datecreated="12/16/2009 00:00:00" tsw:daterevised="06/19/2013 08:27:35">
        <tsw:BeginDate>12/16/2009 00:00:00</tsw:BeginDate>
        <tsw:EndDate>06/30/2013 00:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[State Route 60 both directions in Bradley County - Between SR-317 (WEATHERLY SWITCH RD.) LT. and PICK-UP SR-311 (DALTON PK.) LT., a widening project will result in a lane shift every day. This work is expected to be completed by 06/30/2013.]]></tsw:Description>
        <curract><![CDATA[The Signal Light at APD 40 and McGrady Drive is being worked on today.  Police Officers will be directing traffic at the intersection while the signal light is out of service.]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>2299783.06609955 271490.363581658</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>35.0740100431235 -84.8929024301989</marker>
    </item>
    <item>
      <title>state route 384 both directions in tipton county - between sr-59 hastings way rt. &amp; sr-59 mueller brass rd. lt. / along sr-59 for 0.86 miles and sr-54 (e. liberty st.) rt. &amp; lt. / begin hope st., bridge replacement construction will cause a reduction in lanes from two to one lane every day. this work is expected to be completed by 7/31/2013. event </title>
      <link>http://maps.google.com/?q=35.5503742857305 -89.6413589524742(1 - SR-384 84 County, - 06-AUG-12 - 31-JUL-13)</link>
      <description>State Route 384 both directions in Tipton County - Between SR-59 HASTINGS WAY RT. &amp; SR-59 MUELLER BRASS RD. LT. / ALONG SR-59 FOR 0.86 MILES and SR-54 (E. LIBERTY ST.) RT. &amp; LT. / BEGIN HOPE ST., bridge replacement construction will cause a reduction in lanes from two to one lane every day. This work is expected to be completed by 7/31/2013.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_88</guid>
      <tsw:COUNTY tsw:countyname="84" tsw:countyid="84" tsw:REGION="4"/>
      <tsw:route tsw:segmentid="SR-384" tsw:routeid="SR-384" tsw:routename="SR-384"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="State Route 384 both directions in Tipton County - Between SR-59 HASTINGS WAY RT. &amp;amp; SR-59 MUELLER BRASS RD. LT. / ALONG SR-59 FOR 0.86 MILES and SR-54 (E. LIBERTY ST.) RT. &amp;amp; LT. / BEGIN HOPE ST., bridge replacement construction will cause a reduction in lanes from two to one lane every day. This work is expected to be completed by 7/31/2013." tsw:event_no="464209" tsw:datecreated="08/06/2012 00:00:00" tsw:daterevised="06/06/2013 16:08:35">
        <tsw:BeginDate>08/06/2012 00:00:00</tsw:BeginDate>
        <tsw:EndDate>07/31/2013 00:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[State Route 384 both directions in Tipton County - Between SR-59 HASTINGS WAY RT. & SR-59 MUELLER BRASS RD. LT. / ALONG SR-59 FOR 0.86 MILES and SR-54 (E. LIBERTY ST.) RT. & LT. / BEGIN HOPE ST., bridge replacement construction will cause a reduction in lanes from two to one lane every day. This work is expected to be completed by 7/31/2013.]]></tsw:Description>
        <curract><![CDATA[Construction of a concrete box beam bridge over drainage ditch (L.M. 7.08)including grading, drainage, and paving. Temporary traffic light will be turned on today 11/26/2012 and will remain on until completion of project. One lane traffic over bridge- approximately 11&#39; lane width ill remain open.]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>885553.663139697 463158.952801703</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>35.5503742857305 -89.6413589524742</marker>
    </item>
    <item>
      <title>state route 15 westbound in franklin county - between belvidere road (mile marker: 9.45) and cunningham road (mile marker: 8.99), slide repair with no outside shoulder today. this work is expected to be completed by 11/29/2012. event </title>
      <link>http://maps.google.com/?q=35.1186040874874 -86.1996916550438(1 - SR-15 26 County, - 29-NOV-12 - 29-NOV-12)</link>
      <description>State Route 15 westbound in Franklin County - Between BELVIDERE ROAD (Mile Marker: 9.45) and CUNNINGHAM ROAD (Mile Marker: 8.99), slide repair with no outside shoulder today. This work is expected to be completed by 11/29/2012.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_89</guid>
      <tsw:COUNTY tsw:countyname="26" tsw:countyid="26" tsw:REGION="2"/>
      <tsw:route tsw:segmentid="SR-15" tsw:routeid="SR-15" tsw:routename="SR-15"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="State Route 15 westbound in Franklin County - Between BELVIDERE ROAD (Mile Marker: 9.45) and CUNNINGHAM ROAD (Mile Marker: 8.99), slide repair with no outside shoulder today. This work is expected to be completed by 11/29/2012." tsw:event_no="465732" tsw:datecreated="11/29/2012 08:00:00" tsw:daterevised="11/29/2012 07:37:04">
        <tsw:BeginDate>11/29/2012 08:00:00</tsw:BeginDate>
        <tsw:EndDate>11/29/2012 15:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[State Route 15 westbound in Franklin County - Between BELVIDERE ROAD (Mile Marker: 9.45) and CUNNINGHAM ROAD (Mile Marker: 8.99), slide repair with no outside shoulder today. This work is expected to be completed by 11/29/2012.]]></tsw:Description>
        <curract><![CDATA[S.R. 15 L.M. 8.99 CUNNINGHAM ROAD TO L.M. 9.45 BELVIDERE ROAD SLIDE REPAIR ON OUTSIDE SHOULDER OF ROADWAY TODAY ONLY]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>1908777.02393196 285909.497270751</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>35.1186040874874 -86.1996916550438</marker>
    </item>
    <item>
      <title>state route 224 both directions in mcnairy county - between sr-142 hwy.142 rt. &amp; lt.  and leave sr-15 rt., bridge replacement construction will cause temporary lane closures every day. this work is expected to be completed by 10/15/2013. event </title>
      <link>http://maps.google.com/?q=35.1873221074307 -88.4318232410993(1 - SR-224 55 County, - 27-DEC-12 - 15-OCT-13)</link>
      <description>State Route 224 both directions in McNairy County - Between SR-142 HWY.142 RT. &amp; LT.  and LEAVE SR-15 RT., bridge replacement construction will cause temporary lane closures every day. This work is expected to be completed by 10/15/2013.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_90</guid>
      <tsw:COUNTY tsw:countyname="55" tsw:countyid="55" tsw:REGION="4"/>
      <tsw:route tsw:segmentid="SR-224" tsw:routeid="SR-224" tsw:routename="SR-224"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="State Route 224 both directions in McNairy County - Between SR-142 HWY.142 RT. &amp;amp; LT.  and LEAVE SR-15 RT., bridge replacement construction will cause temporary lane closures every day. This work is expected to be completed by 10/15/2013." tsw:event_no="489028" tsw:datecreated="12/27/2012 00:00:00" tsw:daterevised="06/17/2013 13:54:54">
        <tsw:BeginDate>12/27/2012 00:00:00</tsw:BeginDate>
        <tsw:EndDate>10/15/2013 00:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[State Route 224 both directions in McNairy County - Between SR-142 HWY.142 RT. & LT.  and LEAVE SR-15 RT., bridge replacement construction will cause temporary lane closures every day. This work is expected to be completed by 10/15/2013.]]></tsw:Description>
        <curract><![CDATA[CONTRACT CNL327: McNAIRY COUNTY:  The construction of a concrete box beam bridge on State Route 224 over Graham Creek (L.M. 10.61), including grading, drainage and paving. Project length:  0.201 mile
THE CONTRACTOR ADVISES THAT THEY WILL CLOSE THE ROAD ON THIS PROJECT FROM APRIL 10, 2013 UNTIL OCTOBER 15, 2013, FOR BRIDGE REPLACEMENT AT GILCHRIST ROAD ON STATE ROUTE 224 OVER GRAHAM CREEK. CONSTRUCTION SIGNS ARE INSTALLED FOR THE DETOUR AND THE ROAD IS CLOSED.]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>1241895.88973271 319889.276714006</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>35.1873221074307 -88.4318232410993</marker>
    </item>
    <item>
      <title>interstate 26 both directions in carter and washington counties - between exit 24 / old exit 31:  us-321 sr-67 / elizabethton and  (mile marker: ), resurfacing work will cause temporary lane closures weeknights. this work is expected to be completed by 6/30/2013. event </title>
      <link>http://maps.google.com/?q=36.3006687665543 -82.3335719725396(1 - I-26 90 County, - 11-FEB-13 - 30-JUN-13)</link>
      <description>Interstate 26 both directions in Carter and Washington Counties - Between EXIT 24 / OLD EXIT 31:  US-321 SR-67 / ELIZABETHTON and  (Mile Marker: ), resurfacing work will cause temporary lane closures weeknights. This work is expected to be completed by 6/30/2013.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_91</guid>
      <tsw:COUNTY tsw:countyname="90" tsw:countyid="90" tsw:REGION="1"/>
      <tsw:route tsw:segmentid="I-26" tsw:routeid="I-26" tsw:routename="I-26"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="Interstate 26 both directions in Carter and Washington Counties - Between EXIT 24 / OLD EXIT 31:  US-321 SR-67 / ELIZABETHTON and  (Mile Marker: ), resurfacing work will cause temporary lane closures weeknights. This work is expected to be completed by 6/30/2013." tsw:event_no="495309" tsw:datecreated="02/11/2013 19:00:00" tsw:daterevised="05/16/2013 20:47:03">
        <tsw:BeginDate>02/11/2013 19:00:00</tsw:BeginDate>
        <tsw:EndDate>06/30/2013 06:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[Interstate 26 both directions in Carter and Washington Counties - Between EXIT 24 / OLD EXIT 31:  US-321 SR-67 / ELIZABETHTON and  (Mile Marker: ), resurfacing work will cause temporary lane closures weeknights. This work is expected to be completed by 6/30/2013.]]></tsw:Description>
        <curract><![CDATA[Interstate 26 both directions in Washington and Carter Counties from 500&#39; east of exit 24: US-321 SR-67/Elizabethton to the Carter and Unicoi County line at mile marker 27 will be resurfaced causing temporary lane closures nightly from Sunday till Thursday from 7:00 PM until 6:00 AM.  Signs have been installed.  Lane closures should start May 5th with paving operations.  This work is expected to be completed by 06/30/2013.]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>3048668.92166273 736366.176561385</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>36.3006687665543 -82.3335719725396</marker>
    </item>
    <item>
      <title>interstate 26 both directions in carter and washington counties - between exit 24 / old exit 31:  us-321 sr-67 / elizabethton and  (mile marker: ), resurfacing work will cause temporary lane closures weeknights. this work is expected to be completed by 6/30/2013. event </title>
      <link>http://maps.google.com/?q=36.3006687665543 -82.3335719725396(1 - I-26 10 County, - 11-FEB-13 - 30-JUN-13)</link>
      <description>Interstate 26 both directions in Carter and Washington Counties - Between EXIT 24 / OLD EXIT 31:  US-321 SR-67 / ELIZABETHTON and  (Mile Marker: ), resurfacing work will cause temporary lane closures weeknights. This work is expected to be completed by 6/30/2013.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_92</guid>
      <tsw:COUNTY tsw:countyname="10" tsw:countyid="10" tsw:REGION="1"/>
      <tsw:route tsw:segmentid="I-26" tsw:routeid="I-26" tsw:routename="I-26"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="Interstate 26 both directions in Carter and Washington Counties - Between EXIT 24 / OLD EXIT 31:  US-321 SR-67 / ELIZABETHTON and  (Mile Marker: ), resurfacing work will cause temporary lane closures weeknights. This work is expected to be completed by 6/30/2013." tsw:event_no="495309" tsw:datecreated="02/11/2013 19:00:00" tsw:daterevised="05/16/2013 20:47:03">
        <tsw:BeginDate>02/11/2013 19:00:00</tsw:BeginDate>
        <tsw:EndDate>06/30/2013 06:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[Interstate 26 both directions in Carter and Washington Counties - Between EXIT 24 / OLD EXIT 31:  US-321 SR-67 / ELIZABETHTON and  (Mile Marker: ), resurfacing work will cause temporary lane closures weeknights. This work is expected to be completed by 6/30/2013.]]></tsw:Description>
        <curract><![CDATA[Interstate 26 both directions in Washington and Carter Counties from 500&#39; east of exit 24: US-321 SR-67/Elizabethton to the Carter and Unicoi County line at mile marker 27 will be resurfaced causing temporary lane closures nightly from Sunday till Thursday from 7:00 PM until 6:00 AM.  Signs have been installed.  Lane closures should start May 5th with paving operations.  This work is expected to be completed by 06/30/2013.]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>3052138.09064829 729687.482425555</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>36.3006687665543 -82.3335719725396</marker>
    </item>
    <item>
      <title>state route 16 both directions in bedford county - between rutherford-bedford county line / begin us/hwy-41a and sr-270 (old columbia rd.) rt., bridge repair will cause a reduction in lanes from two to one lane every day. this work is expected to be completed by 4/30/2014. event </title>
      <link>http://maps.google.com/?q=35.6330860322996 -86.5931206010671(1 - SR-16 02 County, - 22-FEB-13 - 30-APR-14)</link>
      <description>State Route 16 both directions in Bedford County - Between RUTHERFORD-BEDFORD COUNTY LINE / BEGIN US/HWY-41A and SR-270 (OLD COLUMBIA RD.) RT., bridge repair will cause a reduction in lanes from two to one lane every day. This work is expected to be completed by 4/30/2014.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_93</guid>
      <tsw:COUNTY tsw:countyname="02" tsw:countyid="02" tsw:REGION="3"/>
      <tsw:route tsw:segmentid="SR-16" tsw:routeid="SR-16" tsw:routename="SR-16"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="State Route 16 both directions in Bedford County - Between RUTHERFORD-BEDFORD COUNTY LINE / BEGIN US/HWY-41A and SR-270 (OLD COLUMBIA RD.) RT., bridge repair will cause a reduction in lanes from two to one lane every day. This work is expected to be completed by 4/30/2014." tsw:event_no="502869" tsw:datecreated="02/22/2013 00:00:00" tsw:daterevised="05/09/2013 07:53:49">
        <tsw:BeginDate>02/22/2013 00:00:00</tsw:BeginDate>
        <tsw:EndDate>04/30/2014 00:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[State Route 16 both directions in Bedford County - Between RUTHERFORD-BEDFORD COUNTY LINE / BEGIN US/HWY-41A and SR-270 (OLD COLUMBIA RD.) RT., bridge repair will cause a reduction in lanes from two to one lane every day. This work is expected to be completed by 4/30/2014.]]></tsw:Description>
        <curract><![CDATA[Starting March 12, 2013, SR 16 beginning at Unionville-Deason Road (LM 6.68) and extending to Unionville-Chapel Hill Road (LM 6.73) will be reduced to one lane.  A Temporary Signal System will be in place and approximately a 5 minute delay in both directions due to bridge repair over Weakly Creek.   Motorists are encouraged to seek alternative routes.  ]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>1792247.759786 473651.079141669</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>35.6330860322996 -86.5931206010671</marker>
    </item>
    <item>
      <title>state route 107 both directions in unicoi county - between i-26 (hwy-19w/23) rt. &amp; lt. / {center of underpass} / (begin john sevier hwy.) and sr-395 (tenth st.) rt., railroad crossing work will temporarily slow traffic every day. this work is expected to be completed by 10/31/2014. event </title>
      <link>http://maps.google.com/?q=36.1509604348055 -82.4106153956877(1 - SR-107 86 County, - 04-FEB-13 - 31-OCT-14)</link>
      <description>State Route 107 both directions in Unicoi County - Between I-26 (HWY-19W/23) RT. &amp; LT. / {CENTER OF UNDERPASS} / (BEGIN JOHN SEVIER HWY.) and SR-395 (TENTH ST.) RT., railroad crossing work will temporarily slow traffic every day. This work is expected to be completed by 10/31/2014.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_94</guid>
      <tsw:COUNTY tsw:countyname="86" tsw:countyid="86" tsw:REGION="1"/>
      <tsw:route tsw:segmentid="SR-107" tsw:routeid="SR-107" tsw:routename="SR-107"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="State Route 107 both directions in Unicoi County - Between I-26 (HWY-19W/23) RT. &amp;amp; LT. / {CENTER OF UNDERPASS} / (BEGIN JOHN SEVIER HWY.) and SR-395 (TENTH ST.) RT., railroad crossing work will temporarily slow traffic every day. This work is expected to be completed by 10/31/2014." tsw:event_no="498272" tsw:datecreated="02/04/2013 00:00:00" tsw:daterevised="06/18/2013 14:54:33">
        <tsw:BeginDate>02/04/2013 00:00:00</tsw:BeginDate>
        <tsw:EndDate>10/31/2014 00:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[State Route 107 both directions in Unicoi County - Between I-26 (HWY-19W/23) RT. & LT. / {CENTER OF UNDERPASS} / (BEGIN JOHN SEVIER HWY.) and SR-395 (TENTH ST.) RT., railroad crossing work will temporarily slow traffic every day. This work is expected to be completed by 10/31/2014.]]></tsw:Description>
        <curract><![CDATA[Motorists should be aware that construction vehicles may be entering and leaving the construction site.]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>3027979.77698338 681061.375707694</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>36.1509604348055 -82.4106153956877</marker>
    </item>
    <item>
      <title>state route 3(us-51) northbound in tipton county - between sr-178 (tipton rd.) lt. and sr-206 (munford-atkoa av.) rt. &amp; lt., bridge repair will cause a reduction in lanes from two to one lane every day. this work is expected to be completed by 8/15/2013. event </title>
      <link>http://maps.google.com/?q=35.4330114915396 -89.8034027677794(1 - SR-3 84 County, - 14-FEB-13 - 15-AUG-13)</link>
      <description>State Route 3(US-51) northbound in Tipton County - Between SR-178 (TIPTON RD.) LT. and SR-206 (MUNFORD-ATKOA AV.) RT. &amp; LT., bridge repair will cause a reduction in lanes from two to one lane every day. This work is expected to be completed by 8/15/2013.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_95</guid>
      <tsw:COUNTY tsw:countyname="84" tsw:countyid="84" tsw:REGION="4"/>
      <tsw:route tsw:segmentid="SR-3" tsw:routeid="SR-3" tsw:routename="SR-3"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="State Route 3(US-51) northbound in Tipton County - Between SR-178 (TIPTON RD.) LT. and SR-206 (MUNFORD-ATKOA AV.) RT. &amp;amp; LT., bridge repair will cause a reduction in lanes from two to one lane every day. This work is expected to be completed by 8/15/2013." tsw:event_no="494047" tsw:datecreated="02/14/2013 00:00:00" tsw:daterevised="06/06/2013 16:09:20">
        <tsw:BeginDate>02/14/2013 00:00:00</tsw:BeginDate>
        <tsw:EndDate>08/15/2013 00:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[State Route 3(US-51) northbound in Tipton County - Between SR-178 (TIPTON RD.) LT. and SR-206 (MUNFORD-ATKOA AV.) RT. & LT., bridge repair will cause a reduction in lanes from two to one lane every day. This work is expected to be completed by 8/15/2013.]]></tsw:Description>
        <curract><![CDATA[LANE RESTRICTION IN EFFECT. Effective Tuesday, April 16, Phase Two will require a lane restriction allowing a clearance of 14&#39;0&quot; for the duration of the project life.]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>835725.532518676 422304.703533683</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>35.4330114915396 -89.8034027677794</marker>
    </item>
    <item>
      <title>state route 386 eastbound in sumner county - between  (mile marker: ) and  (mile marker: ), construction work will cause temporary lane closures weeknights. this work is expected to be completed by 12/31/2013. event </title>
      <link>http://maps.google.com/?q=36.3301288218412 -86.6155210353055(1 - SR-386 83 County, - 01-JAN-13 - 31-DEC-13)</link>
      <description>State Route 386 eastbound in Sumner County - Between  (Mile Marker: ) and  (Mile Marker: ), construction work will cause temporary lane closures weeknights. This work is expected to be completed by 12/31/2013.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_96</guid>
      <tsw:COUNTY tsw:countyname="83" tsw:countyid="83" tsw:REGION="3"/>
      <tsw:route tsw:segmentid="SR-386" tsw:routeid="SR-386" tsw:routename="SR-386"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="State Route 386 eastbound in Sumner County - Between  (Mile Marker: ) and  (Mile Marker: ), construction work will cause temporary lane closures weeknights. This work is expected to be completed by 12/31/2013." tsw:event_no="553569" tsw:datecreated="01/01/2013 00:00:00" tsw:daterevised="06/12/2013 12:33:49">
        <tsw:BeginDate>01/01/2013 00:00:00</tsw:BeginDate>
        <tsw:EndDate>12/31/2013 00:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[State Route 386 eastbound in Sumner County - Between  (Mile Marker: ) and  (Mile Marker: ), construction work will cause temporary lane closures weeknights. This work is expected to be completed by 12/31/2013.]]></tsw:Description>
        <curract><![CDATA[Wednesday June 12 and Thursday June 13, 8PM-6AM, There will be one lane closed on SR 386 (Vietnam Veterans Pkwy.) eastbound at MM 11.6 in order to repair cable guardrail.]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>1787187.14131829 727425.633619802</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>36.3301288218412 -86.6155210353055</marker>
    </item>
    <item>
      <title>state route 424 both directions in carroll county - between sr-1 (hwy-70) rt. &amp; lt. / (begin clarksburg-yuma rd.) and sr-22 lexington-clarksburg hwy. rt. &amp; clarksburg-huntingdon hwy. lt. , bridge replacement construction will cause a reduction in lanes from two to one lane every day. this work is expected to be completed by 10/31/2014. event </title>
      <link>http://maps.google.com/?q=35.8443069372622 -88.4732796560963(1 - SR-424 09 County, - 07-JUN-13 - 31-OCT-14)</link>
      <description>State Route 424 both directions in Carroll County - Between SR-1 (HWY-70) RT. &amp; LT. / (BEGIN CLARKSBURG-YUMA RD.) and SR-22 LEXINGTON-CLARKSBURG HWY. RT. &amp; CLARKSBURG-HUNTINGDON HWY. LT. , bridge replacement construction will cause a reduction in lanes from two to one lane every day. This work is expected to be completed by 10/31/2014.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_97</guid>
      <tsw:COUNTY tsw:countyname="09" tsw:countyid="09" tsw:REGION="4"/>
      <tsw:route tsw:segmentid="SR-424" tsw:routeid="SR-424" tsw:routename="SR-424"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="State Route 424 both directions in Carroll County - Between SR-1 (HWY-70) RT. &amp;amp; LT. / (BEGIN CLARKSBURG-YUMA RD.) and SR-22 LEXINGTON-CLARKSBURG HWY. RT. &amp;amp; CLARKSBURG-HUNTINGDON HWY. LT. , bridge replacement construction will cause a reduction in lanes from two to one lane every day. This work is expected to be completed by 10/31/2014." tsw:event_no="555052" tsw:datecreated="06/07/2013 00:00:00" tsw:daterevised="06/10/2013 15:42:47">
        <tsw:BeginDate>06/07/2013 00:00:00</tsw:BeginDate>
        <tsw:EndDate>10/31/2014 00:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[State Route 424 both directions in Carroll County - Between SR-1 (HWY-70) RT. & LT. / (BEGIN CLARKSBURG-YUMA RD.) and SR-22 LEXINGTON-CLARKSBURG HWY. RT. & CLARKSBURG-HUNTINGDON HWY. LT. , bridge replacement construction will cause a reduction in lanes from two to one lane every day. This work is expected to be completed by 10/31/2014.]]></tsw:Description>
        <curract><![CDATA[Four Bridge replacements (LM 2.41 to LM3.09 on SR424 going into Clarksburg from SR1 (U.S. 70) has began.  Flaggers will be used until a signal system is put in place.  The signal system will reduce traffic to one lane with a 10 foot lane restriction.]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>1235554.57599879 559263.984548362</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>35.8443069372622 -88.4732796560963</marker>
    </item>
    <item>
      <title>interstate 40 both directions in smith county - between mile marker 251 (mile marker: 251) and exit 258 / sr-53 / carthage-gordonsville, resurfacing work will result in lane closures at night. this work is expected to be completed by 7/31/2013. event </title>
      <link>http://maps.google.com/?q=36.1761799427725 -86.0133831124313(1 - I-40 80 County, - 16-MAY-13 - 31-JUL-13)</link>
      <description>Interstate 40 both directions in Smith County - Between MILE MARKER 251 (Mile Marker: 251) and EXIT 258 / SR-53 / CARTHAGE-GORDONSVILLE, resurfacing work will result in lane closures at night. This work is expected to be completed by 7/31/2013.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_98</guid>
      <tsw:COUNTY tsw:countyname="80" tsw:countyid="80" tsw:REGION="3"/>
      <tsw:route tsw:segmentid="I-40" tsw:routeid="I-40" tsw:routename="I-40"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="Interstate 40 both directions in Smith County - Between MILE MARKER 251 (Mile Marker: 251) and EXIT 258 / SR-53 / CARTHAGE-GORDONSVILLE, resurfacing work will result in lane closures at night. This work is expected to be completed by 7/31/2013." tsw:event_no="542987" tsw:datecreated="05/16/2013 00:00:00" tsw:daterevised="06/12/2013 15:42:36">
        <tsw:BeginDate>05/16/2013 00:00:00</tsw:BeginDate>
        <tsw:EndDate>07/31/2013 00:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[Interstate 40 both directions in Smith County - Between MILE MARKER 251 (Mile Marker: 251) and EXIT 258 / SR-53 / CARTHAGE-GORDONSVILLE, resurfacing work will result in lane closures at night. This work is expected to be completed by 7/31/2013.]]></tsw:Description>
        <curract><![CDATA[Thursday June 13 through Wednesday June 19 (excluding Saturday and Sunday), 8PM-6AM, There will be lane closures on I-40 eastbound and westbound for asphalt milling and paving operations.]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>1964550.07223035 670811.501765368</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>36.1761799427725 -86.0133831124313</marker>
    </item>
    <item>
      <title>state route 1 both directions in knox county - between north peters road and north winston road, resurfacing work will cause temporary lane closures at night. this work is expected to be completed by 07/31/2013. event </title>
      <link>http://maps.google.com/?q=35.9221915411708 -84.0620038896437(1 - SR-1 47 County, - 27-MAY-13 - 31-JUL-13)</link>
      <description>State Route 1 both directions in Knox County - Between NORTH PETERS ROAD and NORTH WINSTON ROAD, resurfacing work will cause temporary lane closures at night. This work is expected to be completed by 07/31/2013.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_99</guid>
      <tsw:COUNTY tsw:countyname="47" tsw:countyid="47" tsw:REGION="1"/>
      <tsw:route tsw:segmentid="SR-1" tsw:routeid="SR-1" tsw:routename="SR-1"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="State Route 1 both directions in Knox County - Between NORTH PETERS ROAD and NORTH WINSTON ROAD, resurfacing work will cause temporary lane closures at night. This work is expected to be completed by 07/31/2013." tsw:event_no="558388" tsw:datecreated="05/27/2013 00:00:00" tsw:daterevised="06/17/2013 13:01:24">
        <tsw:BeginDate>05/27/2013 00:00:00</tsw:BeginDate>
        <tsw:EndDate>07/31/2013 00:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[State Route 1 both directions in Knox County - Between NORTH PETERS ROAD and NORTH WINSTON ROAD, resurfacing work will cause temporary lane closures at night. This work is expected to be completed by 07/31/2013.]]></tsw:Description>
        <curract><![CDATA[CONTRACTOR WILL BE COLD-PLANING ROADWAY IN BOTH DIRECTIONS WITH TEMPORARY LANES CLOSURES. THERE WILL BE DELAYS AND STOPPAGE OF TRAFFIC AT TIMES. ALL WORK WITH BE PERFORMED BETWEEN 7 PM AND 6 AM, SUNDAY EVENING THROUGH FRIDAY MORNING.]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>2542278.75198115 584034.303978454</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>35.9221915411708 -84.0620038896437</marker>
    </item>
    <item>
      <title>interstate 65 both directions in giles county - between mile marker 13 (mile marker: 13.0) and mile marker 22 (mile marker: 22.0), construction work will result in lane closures at night. this work is expected to be completed by 06/30/2013. event </title>
      <link>http://maps.google.com/?q=35.2389824836755 -86.8878249573137(1 - I-65 28 County, - 17-JUN-13 - 30-JUN-13)</link>
      <description>Interstate 65 both directions in Giles County - Between MILE MARKER 13 (Mile Marker: 13.0) and MILE MARKER 22 (Mile Marker: 22.0), construction work will result in lane closures at night. This work is expected to be completed by 06/30/2013.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_100</guid>
      <tsw:COUNTY tsw:countyname="28" tsw:countyid="28" tsw:REGION="3"/>
      <tsw:route tsw:segmentid="I-65" tsw:routeid="I-65" tsw:routename="I-65"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="Interstate 65 both directions in Giles County - Between MILE MARKER 13 (Mile Marker: 13.0) and MILE MARKER 22 (Mile Marker: 22.0), construction work will result in lane closures at night. This work is expected to be completed by 06/30/2013." tsw:event_no="558390" tsw:datecreated="06/17/2013 00:00:00" tsw:daterevised="06/17/2013 13:07:27">
        <tsw:BeginDate>06/17/2013 00:00:00</tsw:BeginDate>
        <tsw:EndDate>06/30/2013 00:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[Interstate 65 both directions in Giles County - Between MILE MARKER 13 (Mile Marker: 13.0) and MILE MARKER 22 (Mile Marker: 22.0), construction work will result in lane closures at night. This work is expected to be completed by 06/30/2013.]]></tsw:Description>
        <curract><![CDATA[Tuesday June 18 thru Friday June 21, 8PM-6AM, There will be alternating lane closures on I-65 northbound and southbound in Giles County from MM 13 to MM 22 in order to seal the centerline pavement joint.]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>1703373.83141483 330867.940252029</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>35.2389824836755 -86.8878249573137</marker>
    </item>
    <item>
      <title>state route 155 eastbound in davidson county - between exit 16: i-65 rt. &amp; lt. and exit 19: sr-65 / us-431 (whites creek pk.) rt. &amp; lt., construction work will result in lane closures at night. this work is expected to be completed by 06/21/2013. event </title>
      <link>http://maps.google.com/?q=36.2383520266184 -86.7808929413074(1 - SR-155 19 County, - 17-JUN-13 - 21-JUN-13)</link>
      <description>State Route 155 eastbound in Davidson County - Between EXIT 16: I-65 RT. &amp; LT. and EXIT 19: SR-65 / US-431 (WHITES CREEK PK.) RT. &amp; LT., construction work will result in lane closures at night. This work is expected to be completed by 06/21/2013.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_101</guid>
      <tsw:COUNTY tsw:countyname="19" tsw:countyid="19" tsw:REGION="3"/>
      <tsw:route tsw:segmentid="SR-155" tsw:routeid="SR-155" tsw:routename="SR-155"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="State Route 155 eastbound in Davidson County - Between EXIT 16: I-65 RT. &amp;amp; LT. and EXIT 19: SR-65 / US-431 (WHITES CREEK PK.) RT. &amp;amp; LT., construction work will result in lane closures at night. This work is expected to be completed by 06/21/2013." tsw:event_no="558392" tsw:datecreated="06/17/2013 00:00:00" tsw:daterevised="06/17/2013 13:20:37">
        <tsw:BeginDate>06/17/2013 00:00:00</tsw:BeginDate>
        <tsw:EndDate>06/21/2013 00:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[State Route 155 eastbound in Davidson County - Between EXIT 16: I-65 RT. & LT. and EXIT 19: SR-65 / US-431 (WHITES CREEK PK.) RT. & LT., construction work will result in lane closures at night. This work is expected to be completed by 06/21/2013.]]></tsw:Description>
        <curract><![CDATA[Contractor repairing guardrail at various locations, expect some delays.]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>1738208.19212608 694363.088216667</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>36.2383520266184 -86.7808929413074</marker>
    </item>
    <item>
      <title>state route 188 both directions in crockett and gibson counties - between  (mile marker: ) and sr-77 (hwy.77) rt. &amp; lt., bridge replacement construction will close the roadway every day. this work is expected to be completed by 10/31/2014. event </title>
      <link>http://maps.google.com/?q=36.0300580000838 -89.1091850576952(1 - SR-188 17 County, - 12-APR-13 - 31-OCT-14)</link>
      <description>State Route 188 both directions in Crockett and Gibson Counties - Between  (Mile Marker: ) and SR-77 (HWY.77) RT. &amp; LT., bridge replacement construction will close the roadway every day. This work is expected to be completed by 10/31/2014.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_102</guid>
      <tsw:COUNTY tsw:countyname="17" tsw:countyid="17" tsw:REGION="4"/>
      <tsw:route tsw:segmentid="SR-188" tsw:routeid="SR-188" tsw:routename="SR-188"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="State Route 188 both directions in Crockett and Gibson Counties - Between  (Mile Marker: ) and SR-77 (HWY.77) RT. &amp;amp; LT., bridge replacement construction will close the roadway every day. This work is expected to be completed by 10/31/2014." tsw:event_no="532648" tsw:datecreated="04/12/2013 07:00:00" tsw:daterevised="06/13/2013 08:25:42">
        <tsw:BeginDate>04/12/2013 07:00:00</tsw:BeginDate>
        <tsw:EndDate>10/31/2014 18:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[State Route 188 both directions in Crockett and Gibson Counties - Between  (Mile Marker: ) and SR-77 (HWY.77) RT. & LT., bridge replacement construction will close the roadway every day. This work is expected to be completed by 10/31/2014.]]></tsw:Description>
        <curract><![CDATA[ROADWAY WILL BE CLOSED FOR THE CONSTRUCTION OF (5) BRIDGES, L.M. 11.93 TO L.M 11.98 IN CROCKETT COUNTY AND L.M. 0.08, L.M. 0.11, &amp; L.M. 0.25 IN GIBSON COUNTY.  ]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>1032899.6110284 579622.42200231</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>36.0300580000838 -89.1091850576952</marker>
    </item>
    <item>
      <title>state route 188 both directions in crockett and gibson counties - between  (mile marker: ) and sr-77 (hwy.77) rt. &amp; lt., bridge replacement construction will close the roadway every day. this work is expected to be completed by 10/31/2014. event </title>
      <link>http://maps.google.com/?q=36.0300580000838 -89.1091850576952(1 - SR-188 27 County, - 12-APR-13 - 31-OCT-14)</link>
      <description>State Route 188 both directions in Crockett and Gibson Counties - Between  (Mile Marker: ) and SR-77 (HWY.77) RT. &amp; LT., bridge replacement construction will close the roadway every day. This work is expected to be completed by 10/31/2014.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_103</guid>
      <tsw:COUNTY tsw:countyname="27" tsw:countyid="27" tsw:REGION="4"/>
      <tsw:route tsw:segmentid="SR-188" tsw:routeid="SR-188" tsw:routename="SR-188"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="State Route 188 both directions in Crockett and Gibson Counties - Between  (Mile Marker: ) and SR-77 (HWY.77) RT. &amp;amp; LT., bridge replacement construction will close the roadway every day. This work is expected to be completed by 10/31/2014." tsw:event_no="532648" tsw:datecreated="04/12/2013 07:00:00" tsw:daterevised="06/13/2013 08:25:42">
        <tsw:BeginDate>04/12/2013 07:00:00</tsw:BeginDate>
        <tsw:EndDate>10/31/2014 18:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[State Route 188 both directions in Crockett and Gibson Counties - Between  (Mile Marker: ) and SR-77 (HWY.77) RT. & LT., bridge replacement construction will close the roadway every day. This work is expected to be completed by 10/31/2014.]]></tsw:Description>
        <curract><![CDATA[ROADWAY WILL BE CLOSED FOR THE CONSTRUCTION OF (5) BRIDGES, L.M. 11.93 TO L.M 11.98 IN CROCKETT COUNTY AND L.M. 0.08, L.M. 0.11, &amp; L.M. 0.25 IN GIBSON COUNTY.  ]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>1049311.51229935 632220.68697532</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>36.0300580000838 -89.1091850576952</marker>
    </item>
    <item>
      <title>interstate 24 both directions in montgomery county - between mile marker  11 (mile marker: 11) and mile marker  17 (mile marker: 17), resurfacing work will result in lane closures weeknights. this work is expected to be completed by 6/30/2013. event </title>
      <link>http://maps.google.com/?q=36.494608012989 -87.1738918915692(1 - I-24 63 County, - 01-APR-13 - 30-JUN-13)</link>
      <description>Interstate 24 both directions in Montgomery County - Between MILE MARKER  11 (Mile Marker: 11) and MILE MARKER  17 (Mile Marker: 17), resurfacing work will result in lane closures weeknights. This work is expected to be completed by 6/30/2013.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_104</guid>
      <tsw:COUNTY tsw:countyname="63" tsw:countyid="63" tsw:REGION="3"/>
      <tsw:route tsw:segmentid="I-24" tsw:routeid="I-24" tsw:routename="I-24"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="Interstate 24 both directions in Montgomery County - Between MILE MARKER  11 (Mile Marker: 11) and MILE MARKER  17 (Mile Marker: 17), resurfacing work will result in lane closures weeknights. This work is expected to be completed by 6/30/2013." tsw:event_no="547047" tsw:datecreated="04/01/2013 00:00:00" tsw:daterevised="06/12/2013 14:16:20">
        <tsw:BeginDate>04/01/2013 00:00:00</tsw:BeginDate>
        <tsw:EndDate>06/30/2013 00:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[Interstate 24 both directions in Montgomery County - Between MILE MARKER  11 (Mile Marker: 11) and MILE MARKER  17 (Mile Marker: 17), resurfacing work will result in lane closures weeknights. This work is expected to be completed by 6/30/2013.]]></tsw:Description>
        <curract><![CDATA[Thursday June 13 through Wednesday June 19, 8PM-6AM, (excluding weekends), There will be alternating one lane closures on I-24 eastbound and westbound in order to pave the roadway. Also, on Thursday June 13, traffic will be shifted on the ramp at exit 11.0 for concrete repairs.

]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>1623433.14587824 788805.753266879</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>36.494608012989 -87.1738918915692</marker>
    </item>
    <item>
      <title>state route 13 both directions in montgomery county - between leave sr-48 (trenton rd.) lt. and i-24 rt. &amp; lt. / {center of median}, maintenance work will result in rolling roadblocks on sundays from 5:00am, 06/23/2013 to 7:00am, 06/23/2013 (central time zone). event </title>
      <link>http://maps.google.com/?q=36.5814153827748 -87.297858358797(2 - SR-13 63 County, - 23-JUN-13 - 23-JUN-13)</link>
      <description>State Route 13 both directions in Montgomery County - Between LEAVE SR-48 (TRENTON RD.) LT. and I-24 RT. &amp; LT. / {CENTER OF MEDIAN}, maintenance work will result in rolling roadblocks on Sundays from 5:00AM, 06/23/2013 to 7:00AM, 06/23/2013 (Central Time Zone).</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_105</guid>
      <tsw:COUNTY tsw:countyname="63" tsw:countyid="63" tsw:REGION="3"/>
      <tsw:route tsw:segmentid="SR-13" tsw:routeid="SR-13" tsw:routename="SR-13"/>
      <tsw:EVENT tsw:eventtype="2" tsw:typedescription="State Route 13 both directions in Montgomery County - Between LEAVE SR-48 (TRENTON RD.) LT. and I-24 RT. &amp;amp; LT. / {CENTER OF MEDIAN}, maintenance work will result in rolling roadblocks on Sundays from 5:00AM, 06/23/2013 to 7:00AM, 06/23/2013 (Central Time Zone)." tsw:event_no="555327" tsw:datecreated="06/23/2013 05:00:00" tsw:daterevised="06/11/2013 09:07:31">
        <tsw:BeginDate>06/23/2013 05:00:00</tsw:BeginDate>
        <tsw:EndDate>06/23/2013 07:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[State Route 13 both directions in Montgomery County - Between LEAVE SR-48 (TRENTON RD.) LT. and I-24 RT. & LT. / {CENTER OF MEDIAN}, maintenance work will result in rolling roadblocks on Sundays from 5:00AM, 06/23/2013 to 7:00AM, 06/23/2013 (Central Time Zone).]]></tsw:Description>
        <curract><![CDATA[CDE will be removing old lines on SR13 &amp; Edgewood Place]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>1587414.20522255 820867.921742533</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>36.5814153827748 -87.297858358797</marker>
    </item>
    <item>
      <title>interstate 65 southbound in robertson county - between mile marker 119 (mile marker: 119.0) and mile marker 118 (mile marker: 118.0), maintenance work will result in no inside shoulder every day from 2:00pm, 06/11/2013 to 4:00pm, 06/28/2013 (central time zone). event </title>
      <link>http://maps.google.com/?q=36.5996478878624 -86.5894721425892(2 - I-65 74 County, - 11-JUN-13 - 28-JUN-13)</link>
      <description>Interstate 65 southbound in Robertson County - Between MILE MARKER 119 (Mile Marker: 119.0) and MILE MARKER 118 (Mile Marker: 118.0), maintenance work will result in no inside shoulder every day from 2:00PM, 06/11/2013 to 4:00PM, 06/28/2013 (Central Time Zone).</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_106</guid>
      <tsw:COUNTY tsw:countyname="74" tsw:countyid="74" tsw:REGION="3"/>
      <tsw:route tsw:segmentid="I-65" tsw:routeid="I-65" tsw:routename="I-65"/>
      <tsw:EVENT tsw:eventtype="2" tsw:typedescription="Interstate 65 southbound in Robertson County - Between MILE MARKER 119 (Mile Marker: 119.0) and MILE MARKER 118 (Mile Marker: 118.0), maintenance work will result in no inside shoulder every day from 2:00PM, 06/11/2013 to 4:00PM, 06/28/2013 (Central Time Zone)." tsw:event_no="555408" tsw:datecreated="06/11/2013 14:00:00" tsw:daterevised="06/11/2013 11:29:34">
        <tsw:BeginDate>06/11/2013 14:00:00</tsw:BeginDate>
        <tsw:EndDate>06/28/2013 16:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[Interstate 65 southbound in Robertson County - Between MILE MARKER 119 (Mile Marker: 119.0) and MILE MARKER 118 (Mile Marker: 118.0), maintenance work will result in no inside shoulder every day from 2:00PM, 06/11/2013 to 4:00PM, 06/28/2013 (Central Time Zone).]]></tsw:Description>
        <curract><![CDATA[Tuesday June 11 through Friday June 28, The I-65 southbound Weigh-Station (mile marker 119.0) will be closed (No Entrance) for repair to the concrete and for milling, paving and striping the roadway at the scales.  ]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>1795451.22873938 825500.400623585</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>36.5996478878624 -86.5894721425892</marker>
    </item>
    <item>
      <title>interstate 40 both directions in dickson county - between hickman-dickson county line and mile marker 181 (mile marker: 181), construction work will result in lane closures at night. this work is expected to be completed by 6/30/2013. event </title>
      <link>http://maps.google.com/?q=36.0186925161307 -87.3417802782679(1 - I-40 22 County, - 10-JUN-13 - 30-JUN-13)</link>
      <description>Interstate 40 both directions in Dickson County - Between HICKMAN-DICKSON COUNTY LINE and MILE MARKER 181 (Mile Marker: 181), construction work will result in lane closures at night. This work is expected to be completed by 6/30/2013.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_107</guid>
      <tsw:COUNTY tsw:countyname="22" tsw:countyid="22" tsw:REGION="3"/>
      <tsw:route tsw:segmentid="I-40" tsw:routeid="I-40" tsw:routename="I-40"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="Interstate 40 both directions in Dickson County - Between HICKMAN-DICKSON COUNTY LINE and MILE MARKER 181 (Mile Marker: 181), construction work will result in lane closures at night. This work is expected to be completed by 6/30/2013." tsw:event_no="554948" tsw:datecreated="06/10/2013 00:00:00" tsw:daterevised="06/17/2013 13:03:23">
        <tsw:BeginDate>06/10/2013 00:00:00</tsw:BeginDate>
        <tsw:EndDate>06/30/2013 00:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[Interstate 40 both directions in Dickson County - Between HICKMAN-DICKSON COUNTY LINE and MILE MARKER 181 (Mile Marker: 181), construction work will result in lane closures at night. This work is expected to be completed by 6/30/2013.]]></tsw:Description>
        <curract><![CDATA[Monday June 17 thru Wednesday June 19, 8PM-6AM, There will be alternating lane closures on I-40 eastbound and westbound in Dickson County from MM 163 (SR 48) to MM 182 (SR 96) in order to seal the centerline pavement joint.]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>1571709.79160601 616201.289828558</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>36.0186925161307 -87.3417802782679</marker>
    </item>
    <item>
      <title>state route 65 both directions in davidson county - between sr-11 / us-31w-41 (dickerson pk.) rt. &amp; lt. and i-24  rt. &amp; lt., construction work will result in lane closures at night. this work is expected to be completed by 06/21/2013. event </title>
      <link>http://maps.google.com/?q=36.2572089224474 -86.8302020722882(1 - SR-65 19 County, - 17-JUN-13 - 21-JUN-13)</link>
      <description>State Route 65 both directions in Davidson County - Between SR-11 / US-31W-41 (DICKERSON PK.) RT. &amp; LT. and I-24  RT. &amp; LT., construction work will result in lane closures at night. This work is expected to be completed by 06/21/2013.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_108</guid>
      <tsw:COUNTY tsw:countyname="19" tsw:countyid="19" tsw:REGION="3"/>
      <tsw:route tsw:segmentid="SR-65" tsw:routeid="SR-65" tsw:routename="SR-65"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="State Route 65 both directions in Davidson County - Between SR-11 / US-31W-41 (DICKERSON PK.) RT. &amp;amp; LT. and I-24  RT. &amp;amp; LT., construction work will result in lane closures at night. This work is expected to be completed by 06/21/2013." tsw:event_no="558394" tsw:datecreated="06/17/2013 00:00:00" tsw:daterevised="06/17/2013 13:22:43">
        <tsw:BeginDate>06/17/2013 00:00:00</tsw:BeginDate>
        <tsw:EndDate>06/21/2013 00:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[State Route 65 both directions in Davidson County - Between SR-11 / US-31W-41 (DICKERSON PK.) RT. & LT. and I-24  RT. & LT., construction work will result in lane closures at night. This work is expected to be completed by 06/21/2013.]]></tsw:Description>
        <curract><![CDATA[Contractor repairing guardrail at various locations, expect some delays.]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>1723725.09073497 701347.268417679</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>36.2572089224474 -86.8302020722882</marker>
    </item>
    <item>
      <title>state route 18 both directions in hardeman county - between log mile 29.89 on cypress creek (mile marker: 29.89) and log mile 30.50 on cypress creek (mile marker: 30.50), bridge replacement construction will cause a reduction in lanes from two to one lane every day. this work is expected to be completed by 06/30/2015. event </title>
      <link>http://maps.google.com/?q=35.3331128876006 -88.9283999531864(1 - SR-18 35 County, - 09-MAY-13 - 30-JUN-15)</link>
      <description>State Route 18 both directions in Hardeman County - Between LOG MILE 29.89 ON CYPRESS CREEK (Mile Marker: 29.89) and LOG MILE 30.50 ON CYPRESS CREEK (Mile Marker: 30.50), bridge replacement construction will cause a reduction in lanes from two to one lane every day. This work is expected to be completed by 06/30/2015.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_109</guid>
      <tsw:COUNTY tsw:countyname="35" tsw:countyid="35" tsw:REGION="4"/>
      <tsw:route tsw:segmentid="SR-18" tsw:routeid="SR-18" tsw:routename="SR-18"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="State Route 18 both directions in Hardeman County - Between LOG MILE 29.89 ON CYPRESS CREEK (Mile Marker: 29.89) and LOG MILE 30.50 ON CYPRESS CREEK (Mile Marker: 30.50), bridge replacement construction will cause a reduction in lanes from two to one lane every day. This work is expected to be completed by 06/30/2015." tsw:event_no="558468" tsw:datecreated="05/09/2013 00:00:00" tsw:daterevised="06/17/2013 15:31:08">
        <tsw:BeginDate>05/09/2013 00:00:00</tsw:BeginDate>
        <tsw:EndDate>06/30/2015 00:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[State Route 18 both directions in Hardeman County - Between LOG MILE 29.89 ON CYPRESS CREEK (Mile Marker: 29.89) and LOG MILE 30.50 ON CYPRESS CREEK (Mile Marker: 30.50), bridge replacement construction will cause a reduction in lanes from two to one lane every day. This work is expected to be completed by 06/30/2015.]]></tsw:Description>
        <curract><![CDATA[CONTRACT CNM014, PROJECT NUMBER 35003-3228-94, HARDEMAN COUNTY:  THIS IS THE CONSTRUCTION OF A CONCRETE BOX BEAM BRIDGE ON STATE ROUTE 18 OVER CYPRESS CREEK (L.M. 29.89), INCLUDING GRADING, DRAINAGE AND PAVING.  PROJECT LENGTH: 0.241 MILE. ]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>1095151.95822128 376995.244720653</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>35.3331128876006 -88.9283999531864</marker>
    </item>
    <item>
      <title>interstate 24 both directions in hamilton county - between mile marker 185 (mile marker: 185) and i-75 rt. &amp; lt., resurfacing work will result in lane closures at night. this work is expected to be completed by 7/6/2013. event </title>
      <link>http://maps.google.com/?q=35.0041235121242 -85.214060804332(1 - I-24 33 County, - 28-APR-13 - 15-JUN-13)</link>
      <description>Interstate 24 both directions in Hamilton County - Between MILE MARKER 185 (Mile Marker: 185) and I-75 RT. &amp; LT., resurfacing work will result in lane closures at night. This work is expected to be completed by 7/6/2013.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_110</guid>
      <tsw:COUNTY tsw:countyname="33" tsw:countyid="33" tsw:REGION="2"/>
      <tsw:route tsw:segmentid="I-24" tsw:routeid="I-24" tsw:routename="I-24"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="Interstate 24 both directions in Hamilton County - Between MILE MARKER 185 (Mile Marker: 185) and I-75 RT. &amp;amp; LT., resurfacing work will result in lane closures at night. This work is expected to be completed by 7/6/2013." tsw:event_no="535289" tsw:datecreated="04/28/2013 00:00:00" tsw:daterevised="06/14/2013 14:11:19">
        <tsw:BeginDate>04/28/2013 00:00:00</tsw:BeginDate>
        <tsw:EndDate>06/15/2013 00:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[Interstate 24 both directions in Hamilton County - Between MILE MARKER 185 (Mile Marker: 185) and I-75 RT. & LT., resurfacing work will result in lane closures at night. This work is expected to be completed by 7/6/2013.]]></tsw:Description>
        <curract><![CDATA[Work on this project will resume on June 16 following the suspension of work to accommodate Chattanooga’s downtown Riverbend Festival.  Any work requiring lane closures is limited to Sunday through Thursday nights between 9PM - 6AM.  THP will assist with traffic control.]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>2203887.80151443 245123.207870544</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>35.0041235121242 -85.214060804332</marker>
    </item>
    <item>
      <title>interstate 75 both directions in hamilton county - between georgia-tennessee state line and mile marker 2 (mile marker: 2), resurfacing work will result in lane closures at night. this work is expected to be completed by 7/6/2013. event </title>
      <link>http://maps.google.com/?q=34.9985522994394 -85.2094132736133(1 - I-75 33 County, - 28-APR-13 - 15-JUN-13)</link>
      <description>Interstate 75 both directions in Hamilton County - Between GEORGIA-TENNESSEE STATE LINE and MILE MARKER 2 (Mile Marker: 2), resurfacing work will result in lane closures at night. This work is expected to be completed by 7/6/2013.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_111</guid>
      <tsw:COUNTY tsw:countyname="33" tsw:countyid="33" tsw:REGION="2"/>
      <tsw:route tsw:segmentid="I-75" tsw:routeid="I-75" tsw:routename="I-75"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="Interstate 75 both directions in Hamilton County - Between GEORGIA-TENNESSEE STATE LINE and MILE MARKER 2 (Mile Marker: 2), resurfacing work will result in lane closures at night. This work is expected to be completed by 7/6/2013." tsw:event_no="535290" tsw:datecreated="04/28/2013 00:00:00" tsw:daterevised="06/14/2013 14:11:06">
        <tsw:BeginDate>04/28/2013 00:00:00</tsw:BeginDate>
        <tsw:EndDate>06/15/2013 00:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[Interstate 75 both directions in Hamilton County - Between GEORGIA-TENNESSEE STATE LINE and MILE MARKER 2 (Mile Marker: 2), resurfacing work will result in lane closures at night. This work is expected to be completed by 7/6/2013.]]></tsw:Description>
        <curract><![CDATA[Work on this project will resume on June 16 following the suspension of work to accommodate Chattanooga’s downtown Riverbend Festival.  Any work requiring lane closures is limited to Sunday through Thursday nights between 9PM - 6AM.  THP will assist with traffic control. ]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>2205296.08236844 243106.580576434</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>34.9985522994394 -85.2094132736133</marker>
    </item>
    <item>
      <title>state route 1 both directions in sullivan county - between i-181 (us/hwy-23) rt. &amp; sr-137 (us/hwy-23) lt. / {center of underpass} and i-81 / {center of overhead}, intersection modification work will cause temporary lane closures every day. this work is expected to be completed by 7/31/2013. event </title>
      <link>http://maps.google.com/?q=36.5751843783569 -82.4228716265993(1 - SR-1 82 County, - 21-DEC-12 - 31-JUL-13)</link>
      <description>State Route 1 both directions in Sullivan County - Between I-181 (US/HWY-23) RT. &amp; SR-137 (US/HWY-23) LT. / {CENTER OF UNDERPASS} and I-81 / {CENTER OF OVERHEAD}, intersection modification work will cause temporary lane closures every day. This work is expected to be completed by 7/31/2013.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_112</guid>
      <tsw:COUNTY tsw:countyname="82" tsw:countyid="82" tsw:REGION="1"/>
      <tsw:route tsw:segmentid="SR-1" tsw:routeid="SR-1" tsw:routename="SR-1"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="State Route 1 both directions in Sullivan County - Between I-181 (US/HWY-23) RT. &amp;amp; SR-137 (US/HWY-23) LT. / {CENTER OF UNDERPASS} and I-81 / {CENTER OF OVERHEAD}, intersection modification work will cause temporary lane closures every day. This work is expected to be completed by 7/31/2013." tsw:event_no="546568" tsw:datecreated="12/21/2012 00:00:00" tsw:daterevised="06/18/2013 14:54:22">
        <tsw:BeginDate>12/21/2012 00:00:00</tsw:BeginDate>
        <tsw:EndDate>07/31/2013 00:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[State Route 1 both directions in Sullivan County - Between I-181 (US/HWY-23) RT. & SR-137 (US/HWY-23) LT. / {CENTER OF UNDERPASS} and I-81 / {CENTER OF OVERHEAD}, intersection modification work will cause temporary lane closures every day. This work is expected to be completed by 7/31/2013.]]></tsw:Description>
        <curract><![CDATA[Construction in the surrounding area is taking place which could result in temporary lane closures.  Motorists should use caution in this area and pay attention for crews working near the roadway.]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>3018720.03099078 835267.621760703</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>36.5751843783569 -82.4228716265993</marker>
    </item>
    <item>
      <title>interstate 24 eastbound in montgomery county - between mile marker  7 (mile marker: 7.0) and mile marker  11 (mile marker: 11.0), brush removal will result in no outside shoulders on weekdays from 7:00am, 06/17/2013 to 5:00pm, 06/21/2013 (central time zone). event </title>
      <link>http://maps.google.com/?q=36.5420584898228 -87.2405153992765(2 - I-24 63 County, - 17-JUN-13 - 21-JUN-13)</link>
      <description>Interstate 24 eastbound in Montgomery County - Between MILE MARKER  7 (Mile Marker: 7.0) and MILE MARKER  11 (Mile Marker: 11.0), brush removal will result in no outside shoulders on weekdays from 7:00AM, 06/17/2013 to 5:00PM, 06/21/2013 (Central Time Zone).</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_113</guid>
      <tsw:COUNTY tsw:countyname="63" tsw:countyid="63" tsw:REGION="3"/>
      <tsw:route tsw:segmentid="I-24" tsw:routeid="I-24" tsw:routename="I-24"/>
      <tsw:EVENT tsw:eventtype="2" tsw:typedescription="Interstate 24 eastbound in Montgomery County - Between MILE MARKER  7 (Mile Marker: 7.0) and MILE MARKER  11 (Mile Marker: 11.0), brush removal will result in no outside shoulders on weekdays from 7:00AM, 06/17/2013 to 5:00PM, 06/21/2013 (Central Time Zone)." tsw:event_no="556390" tsw:datecreated="06/17/2013 07:00:00" tsw:daterevised="06/13/2013 10:02:24">
        <tsw:BeginDate>06/17/2013 07:00:00</tsw:BeginDate>
        <tsw:EndDate>06/21/2013 17:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[Interstate 24 eastbound in Montgomery County - Between MILE MARKER  7 (Mile Marker: 7.0) and MILE MARKER  11 (Mile Marker: 11.0), brush removal will result in no outside shoulders on weekdays from 7:00AM, 06/17/2013 to 5:00PM, 06/21/2013 (Central Time Zone).]]></tsw:Description>
        <curract><![CDATA[No current activities. ]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>1604069.08032825 806321.550687232</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>36.5420584898228 -87.2405153992765</marker>
    </item>
    <item>
      <title>state route 113 both directions in hamblen county - between sr-160 (enka hwy.) rt. &amp; lt. and sr-34 e. andrew johnson hwy. rt. &amp; lt. , construction work will cause temporary lane closures on weekdays. this work is expected to be completed by 6/30/2013. event </title>
      <link>http://maps.google.com/?q=36.2191421069741 -83.1684287586561(1 - SR-113 32 County, - 03-APR-13 - 30-JUN-13)</link>
      <description>State Route 113 both directions in Hamblen County - Between SR-160 (ENKA HWY.) RT. &amp; LT. and SR-34 E. ANDREW JOHNSON HWY. RT. &amp; LT. , construction work will cause temporary lane closures on weekdays. This work is expected to be completed by 6/30/2013.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_114</guid>
      <tsw:COUNTY tsw:countyname="32" tsw:countyid="32" tsw:REGION="1"/>
      <tsw:route tsw:segmentid="SR-113" tsw:routeid="SR-113" tsw:routename="SR-113"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="State Route 113 both directions in Hamblen County - Between SR-160 (ENKA HWY.) RT. &amp;amp; LT. and SR-34 E. ANDREW JOHNSON HWY. RT. &amp;amp; LT. , construction work will cause temporary lane closures on weekdays. This work is expected to be completed by 6/30/2013." tsw:event_no="526908" tsw:datecreated="04/03/2013 00:00:00" tsw:daterevised="06/11/2013 11:32:39">
        <tsw:BeginDate>04/03/2013 00:00:00</tsw:BeginDate>
        <tsw:EndDate>06/30/2013 00:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[State Route 113 both directions in Hamblen County - Between SR-160 (ENKA HWY.) RT. & LT. and SR-34 E. ANDREW JOHNSON HWY. RT. & LT. , construction work will cause temporary lane closures on weekdays. This work is expected to be completed by 6/30/2013.]]></tsw:Description>
        <curract><![CDATA[Motorists should be alert to flaggers and other construction equipment and workers.]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>2803648.51881731 698533.456315265</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>36.2191421069741 -83.1684287586561</marker>
    </item>
    <item>
      <title>state route 190 both directions in carroll county - between sr-105 (w. main st.) rt. &amp; lt. and carroll-weakley county line, utilities will cause temporary lane closures on weekdays. this work is expected to be completed by 6/21/2013. event </title>
      <link>http://maps.google.com/?q=36.0658257223448 -88.6196462254173(1 - SR-190 09 County, - 11-JUN-13 - 21-JUN-13)</link>
      <description>State Route 190 both directions in Carroll County - Between SR-105 (W. MAIN ST.) RT. &amp; LT. and CARROLL-WEAKLEY COUNTY LINE, utilities will cause temporary lane closures on weekdays. This work is expected to be completed by 6/21/2013.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_115</guid>
      <tsw:COUNTY tsw:countyname="09" tsw:countyid="09" tsw:REGION="4"/>
      <tsw:route tsw:segmentid="SR-190" tsw:routeid="SR-190" tsw:routename="SR-190"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="State Route 190 both directions in Carroll County - Between SR-105 (W. MAIN ST.) RT. &amp;amp; LT. and CARROLL-WEAKLEY COUNTY LINE, utilities will cause temporary lane closures on weekdays. This work is expected to be completed by 6/21/2013." tsw:event_no="555310" tsw:datecreated="06/11/2013 08:00:00" tsw:daterevised="06/11/2013 09:28:43">
        <tsw:BeginDate>06/11/2013 08:00:00</tsw:BeginDate>
        <tsw:EndDate>06/21/2013 17:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[State Route 190 both directions in Carroll County - Between SR-105 (W. MAIN ST.) RT. & LT. and CARROLL-WEAKLEY COUNTY LINE, utilities will cause temporary lane closures on weekdays. This work is expected to be completed by 6/21/2013.]]></tsw:Description>
        <curract><![CDATA[No current activities. ]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>1194347.72209071 641000.400515476</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>36.0658257223448 -88.6196462254173</marker>
    </item>
    <item>
      <title>state route 253 both directions in williamson county - between sr-252 (wilson pk.) rt. &amp; lt. and williamson-davidson county line, construction work will result in rolling roadblocks on weekdays. this work is expected to be completed by 6/30/2013. event </title>
      <link>http://maps.google.com/?q=35.9856482139988 -86.7329206458598(1 - SR-253 94 County, - 06-NOV-12 - 30-JUN-13)</link>
      <description>State Route 253 both directions in Williamson County - Between SR-252 (WILSON PK.) RT. &amp; LT. and WILLIAMSON-DAVIDSON COUNTY LINE, construction work will result in rolling roadblocks on weekdays. This work is expected to be completed by 6/30/2013.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_116</guid>
      <tsw:COUNTY tsw:countyname="94" tsw:countyid="94" tsw:REGION="3"/>
      <tsw:route tsw:segmentid="SR-253" tsw:routeid="SR-253" tsw:routename="SR-253"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="State Route 253 both directions in Williamson County - Between SR-252 (WILSON PK.) RT. &amp;amp; LT. and WILLIAMSON-DAVIDSON COUNTY LINE, construction work will result in rolling roadblocks on weekdays. This work is expected to be completed by 6/30/2013." tsw:event_no="536329" tsw:datecreated="11/06/2012 00:00:00" tsw:daterevised="06/06/2013 10:32:55">
        <tsw:BeginDate>11/06/2012 00:00:00</tsw:BeginDate>
        <tsw:EndDate>06/30/2013 00:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[State Route 253 both directions in Williamson County - Between SR-252 (WILSON PK.) RT. & LT. and WILLIAMSON-DAVIDSON COUNTY LINE, construction work will result in rolling roadblocks on weekdays. This work is expected to be completed by 6/30/2013.]]></tsw:Description>
        <curract><![CDATA[THERE ARE NO CURRENT LANE CLOSURES TO REPORT.]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>1751666.43755236 602264.335091015</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>35.9856482139988 -86.7329206458598</marker>
    </item>
    <item>
      <title>interstate 24 both directions in davidson county - between exit 52: sr-1 / us-41-70s / murfreesboro rd. and mile marker 63 (mile marker: 63.0), drainage work will result in rolling roadblocks at night from 7:00pm, 06/24/2013 to 5:00am, 06/28/2013 (central time zone). event </title>
      <link>http://maps.google.com/?q=36.0657019278654 -86.6858267389113(2 - I-24 19 County, - 24-JUN-13 - 28-JUN-13)</link>
      <description>Interstate 24 both directions in Davidson County - Between EXIT 52: SR-1 / US-41-70S / MURFREESBORO RD. and MILE MARKER 63 (Mile Marker: 63.0), drainage work will result in rolling roadblocks at night from 7:00PM, 06/24/2013 to 5:00AM, 06/28/2013 (Central Time Zone).</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_117</guid>
      <tsw:COUNTY tsw:countyname="19" tsw:countyid="19" tsw:REGION="3"/>
      <tsw:route tsw:segmentid="I-24" tsw:routeid="I-24" tsw:routename="I-24"/>
      <tsw:EVENT tsw:eventtype="2" tsw:typedescription="Interstate 24 both directions in Davidson County - Between EXIT 52: SR-1 / US-41-70S / MURFREESBORO RD. and MILE MARKER 63 (Mile Marker: 63.0), drainage work will result in rolling roadblocks at night from 7:00PM, 06/24/2013 to 5:00AM, 06/28/2013 (Central Time Zone)." tsw:event_no="558767" tsw:datecreated="06/24/2013 19:00:00" tsw:daterevised="06/18/2013 08:03:34">
        <tsw:BeginDate>06/24/2013 19:00:00</tsw:BeginDate>
        <tsw:EndDate>06/28/2013 05:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[Interstate 24 both directions in Davidson County - Between EXIT 52: SR-1 / US-41-70S / MURFREESBORO RD. and MILE MARKER 63 (Mile Marker: 63.0), drainage work will result in rolling roadblocks at night from 7:00PM, 06/24/2013 to 5:00AM, 06/28/2013 (Central Time Zone).]]></tsw:Description>
        <curract><![CDATA[No current activities. ]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>1765803.08073753 631304.010698562</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>36.0657019278654 -86.6858267389113</marker>
    </item>
    <item>
      <title>state route 78 both directions in lake county - between sr-79 lt. and sr-21 (lake dr.) rt. &amp; (church st.) lt., construction work will cause temporary lane closures every day. this work is expected to be completed by 6/30/2013. event </title>
      <link>http://maps.google.com/?q=36.3066651417055 -89.4758127245087(1 - SR-78 48 County, - 09-JUL-09 - 30-SEP-12)</link>
      <description>State Route 78 both directions in Lake County - Between SR-79 LT. and SR-21 (LAKE DR.) RT. &amp; (CHURCH ST.) LT., construction work will cause temporary lane closures every day. This work is expected to be completed by 6/30/2013.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_118</guid>
      <tsw:COUNTY tsw:countyname="48" tsw:countyid="48" tsw:REGION="4"/>
      <tsw:route tsw:segmentid="SR-78" tsw:routeid="SR-78" tsw:routename="SR-78"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="State Route 78 both directions in Lake County - Between SR-79 LT. and SR-21 (LAKE DR.) RT. &amp;amp; (CHURCH ST.) LT., construction work will cause temporary lane closures every day. This work is expected to be completed by 6/30/2013." tsw:event_no="414151" tsw:datecreated="07/09/2009 00:00:00" tsw:daterevised="06/17/2013 13:32:04">
        <tsw:BeginDate>07/09/2009 00:00:00</tsw:BeginDate>
        <tsw:EndDate>09/30/2012 00:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[State Route 78 both directions in Lake County - Between SR-79 LT. and SR-21 (LAKE DR.) RT. & (CHURCH ST.) LT., construction work will cause temporary lane closures every day. This work is expected to be completed by 6/30/2013.]]></tsw:Description>
        <curract><![CDATA[NO WORK ON PROJECT.]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>944541.637820114 736498.621643608</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>36.3066651417055 -89.4758127245087</marker>
    </item>
    <item>
      <title>state route 57 both directions in shelby county - between leave sr-177 (germantown rd.) lt. and sr-205 (eastly rd.) lt., striping will result in rolling roadblocks at night. this work is expected to be completed by 06/24/2013. event </title>
      <link>http://maps.google.com/?q=35.0546215808336 -89.7380405341866(1 - SR-57 79 County, - 18-JUN-13 - 24-JUN-13)</link>
      <description>State Route 57 both directions in Shelby County - Between LEAVE SR-177 (GERMANTOWN RD.) LT. and SR-205 (EASTLY RD.) LT., striping will result in rolling roadblocks at night. This work is expected to be completed by 06/24/2013.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_119</guid>
      <tsw:COUNTY tsw:countyname="79" tsw:countyid="79" tsw:REGION="4"/>
      <tsw:route tsw:segmentid="SR-57" tsw:routeid="SR-57" tsw:routename="SR-57"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="State Route 57 both directions in Shelby County - Between LEAVE SR-177 (GERMANTOWN RD.) LT. and SR-205 (EASTLY RD.) LT., striping will result in rolling roadblocks at night. This work is expected to be completed by 06/24/2013." tsw:event_no="558972" tsw:datecreated="06/18/2013 00:00:00" tsw:daterevised="06/18/2013 15:52:54">
        <tsw:BeginDate>06/18/2013 00:00:00</tsw:BeginDate>
        <tsw:EndDate>06/24/2013 00:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[State Route 57 both directions in Shelby County - Between LEAVE SR-177 (GERMANTOWN RD.) LT. and SR-205 (EASTLY RD.) LT., striping will result in rolling roadblocks at night. This work is expected to be completed by 06/24/2013.]]></tsw:Description>
        <curract><![CDATA[No current activities. ]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>849923.601797512 283923.616489022</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>35.0546215808336 -89.7380405341866</marker>
    </item>
    <item>
      <title>state route 251 both directions in cheatham county - between sr-249 (sams creek rd.) rt. &amp; (river rd.) lt. and cheatham-davidson county line, bridge replacement construction will cause a reduction in lanes from two to one lane every day. this work is expected to be completed by 5/15/2014. event </title>
      <link>http://maps.google.com/?q=36.2154306791334 -87.0162206411796(1 - SR-251 11 County, - 01-MAR-13 - 15-MAY-14)</link>
      <description>State Route 251 both directions in Cheatham County - Between SR-249 (SAMS CREEK RD.) RT. &amp; (RIVER RD.) LT. and CHEATHAM-DAVIDSON COUNTY LINE, bridge replacement construction will cause a reduction in lanes from two to one lane every day. This work is expected to be completed by 5/15/2014.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_120</guid>
      <tsw:COUNTY tsw:countyname="11" tsw:countyid="11" tsw:REGION="3"/>
      <tsw:route tsw:segmentid="SR-251" tsw:routeid="SR-251" tsw:routename="SR-251"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="State Route 251 both directions in Cheatham County - Between SR-249 (SAMS CREEK RD.) RT. &amp;amp; (RIVER RD.) LT. and CHEATHAM-DAVIDSON COUNTY LINE, bridge replacement construction will cause a reduction in lanes from two to one lane every day. This work is expected to be completed by 5/15/2014." tsw:event_no="516649" tsw:datecreated="03/01/2013 08:00:00" tsw:daterevised="05/07/2013 15:59:16">
        <tsw:BeginDate>03/01/2013 08:00:00</tsw:BeginDate>
        <tsw:EndDate>05/15/2014 17:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[State Route 251 both directions in Cheatham County - Between SR-249 (SAMS CREEK RD.) RT. & (RIVER RD.) LT. and CHEATHAM-DAVIDSON COUNTY LINE, bridge replacement construction will cause a reduction in lanes from two to one lane every day. This work is expected to be completed by 5/15/2014.]]></tsw:Description>
        <curract><![CDATA[Construction to replace the existing bridge over Sam&#39;s Creek on State Route 251 in Cheatham County continues.  The existing roadway has been reduced to one lane with a temporary traffic signal to direct traffic as needed in each direction through this construction zone.  Motorists can expect some minor delays and should be alert to changing roadway conditions while traveling through this section of State Route 251.  Additional updates to follow as needed.]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>1668723.66374096 686656.397091945</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>36.2154306791334 -87.0162206411796</marker>
    </item>
    <item>
      <title>interstate 240 both directions in shelby county - between i-55 rt. &amp; lt. / center of overhead / along i-55 &amp; ramp system / leave i-55 back / center of underpass and exit 17:  mt. moriah rd., resurfacing work will result in lane closures at night. this work is expected to be completed by 8/31/2013. event </title>
      <link>http://maps.google.com/?q=35.0781055915937 -89.9618457030049(1 - I-240 79 County, - 10-MAR-13 - 31-AUG-13)</link>
      <description>Interstate 240 both directions in Shelby County - Between I-55 RT. &amp; LT. / CENTER OF OVERHEAD / ALONG I-55 &amp; RAMP SYSTEM / LEAVE I-55 BACK / CENTER OF UNDERPASS and EXIT 17:  MT. MORIAH RD., resurfacing work will result in lane closures at night. This work is expected to be completed by 8/31/2013.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_121</guid>
      <tsw:COUNTY tsw:countyname="79" tsw:countyid="79" tsw:REGION="4"/>
      <tsw:route tsw:segmentid="I-240" tsw:routeid="I-240" tsw:routename="I-240"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="Interstate 240 both directions in Shelby County - Between I-55 RT. &amp;amp; LT. / CENTER OF OVERHEAD / ALONG I-55 &amp;amp; RAMP SYSTEM / LEAVE I-55 BACK / CENTER OF UNDERPASS and EXIT 17:  MT. MORIAH RD., resurfacing work will result in lane closures at night. This work is expected to be completed by 8/31/2013." tsw:event_no="512187" tsw:datecreated="03/10/2013 00:00:00" tsw:daterevised="05/14/2013 15:41:32">
        <tsw:BeginDate>03/10/2013 00:00:00</tsw:BeginDate>
        <tsw:EndDate>08/31/2013 00:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[Interstate 240 both directions in Shelby County - Between I-55 RT. & LT. / CENTER OF OVERHEAD / ALONG I-55 & RAMP SYSTEM / LEAVE I-55 BACK / CENTER OF UNDERPASS and EXIT 17:  MT. MORIAH RD., resurfacing work will result in lane closures at night. This work is expected to be completed by 8/31/2013.]]></tsw:Description>
        <curract><![CDATA[The contractor will be milling and paving.   This work will be nighttime only.  There will be up to 2 lanes closed in each direction.  At least 1 lane of traffic will remain open at all times.   ]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>783333.33256483 295099.185331671</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>35.0781055915937 -89.9618457030049</marker>
    </item>
    <item>
      <title>interstate 24 both directions in davidson county - between exit 53:  i-440 / four-forty pkwy. and exit 57:  haywood ln. (mile marker: 57), resurfacing work will cause temporary lane closures at night. this work is expected to be completed by 6/30/2013. event </title>
      <link>http://maps.google.com/?q=36.0982530532854 -86.7099963843773(1 - I-24 19 County, - 11-MAR-13 - 30-JUN-13)</link>
      <description>Interstate 24 both directions in Davidson County - Between EXIT 53:  I-440 / FOUR-FORTY PKWY. and EXIT 57:  HAYWOOD LN. (Mile Marker: 57), resurfacing work will cause temporary lane closures at night. This work is expected to be completed by 6/30/2013.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_122</guid>
      <tsw:COUNTY tsw:countyname="19" tsw:countyid="19" tsw:REGION="3"/>
      <tsw:route tsw:segmentid="I-24" tsw:routeid="I-24" tsw:routename="I-24"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="Interstate 24 both directions in Davidson County - Between EXIT 53:  I-440 / FOUR-FORTY PKWY. and EXIT 57:  HAYWOOD LN. (Mile Marker: 57), resurfacing work will cause temporary lane closures at night. This work is expected to be completed by 6/30/2013." tsw:event_no="512547" tsw:datecreated="03/11/2013 00:00:00" tsw:daterevised="06/14/2013 09:16:00">
        <tsw:BeginDate>03/11/2013 00:00:00</tsw:BeginDate>
        <tsw:EndDate>06/30/2013 00:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[Interstate 24 both directions in Davidson County - Between EXIT 53:  I-440 / FOUR-FORTY PKWY. and EXIT 57:  HAYWOOD LN. (Mile Marker: 57), resurfacing work will cause temporary lane closures at night. This work is expected to be completed by 6/30/2013.]]></tsw:Description>
        <curract><![CDATA[Friday June 14, 8PM-6AM, Traffic will be closed down to one lane I-24 westbound in order to install permanent striping and pavement markers on the center lanes of the roadway.

Monday June 17 and Tuesday June 18, 8PM-6AM, There will be alternating lane closures on I-24 westbound and eastbound in order to install permanent striping and pavement markers.
]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>1758745.79920086 643204.147186041</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>36.0982530532854 -86.7099963843773</marker>
    </item>
    <item>
      <title>state route 344 both directions in hawkins county - between hamblen-hawkins county line / sr-113 (state hwy-113) rt. &amp; lt. and sr-1 (hwy-11w) rt. &amp; lt., construction work will cause temporary lane closures on weekdays. this work is expected to be completed by 6/30/2013. event </title>
      <link>http://maps.google.com/?q=36.357073024212 -83.1001825219432(1 - SR-344 37 County, - 08-APR-13 - 30-JUN-13)</link>
      <description>State Route 344 both directions in Hawkins County - Between HAMBLEN-HAWKINS COUNTY LINE / SR-113 (STATE HWY-113) RT. &amp; LT. and SR-1 (HWY-11W) RT. &amp; LT., construction work will cause temporary lane closures on weekdays. This work is expected to be completed by 6/30/2013.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_123</guid>
      <tsw:COUNTY tsw:countyname="37" tsw:countyid="37" tsw:REGION="1"/>
      <tsw:route tsw:segmentid="SR-344" tsw:routeid="SR-344" tsw:routename="SR-344"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="State Route 344 both directions in Hawkins County - Between HAMBLEN-HAWKINS COUNTY LINE / SR-113 (STATE HWY-113) RT. &amp;amp; LT. and SR-1 (HWY-11W) RT. &amp;amp; LT., construction work will cause temporary lane closures on weekdays. This work is expected to be completed by 6/30/2013." tsw:event_no="526909" tsw:datecreated="04/08/2013 00:00:00" tsw:daterevised="06/11/2013 11:32:47">
        <tsw:BeginDate>04/08/2013 00:00:00</tsw:BeginDate>
        <tsw:EndDate>06/30/2013 00:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[State Route 344 both directions in Hawkins County - Between HAMBLEN-HAWKINS COUNTY LINE / SR-113 (STATE HWY-113) RT. & LT. and SR-1 (HWY-11W) RT. & LT., construction work will cause temporary lane closures on weekdays. This work is expected to be completed by 6/30/2013.]]></tsw:Description>
        <curract><![CDATA[Motorists should be alert to flagging operations, construction equipment, and construction workers.]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>2822283.75671287 749314.314575724</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>36.357073024212 -83.1001825219432</marker>
    </item>
    <item>
      <title>interstate 75 northbound in knox county - between mile marker 110 (mile marker: 110) and exit 110:  callahan dr., a widening project will temporarily slow traffic on weekdays. this work is expected to be completed by 9/30/2013. event </title>
      <link>http://maps.google.com/?q=36.0216219457158 -83.9945250460961(1 - I-75 47 County, - 22-APR-13 - 30-SEP-13)</link>
      <description>Interstate 75 northbound in Knox County - Between MILE MARKER 110 (Mile Marker: 110) and EXIT 110:  CALLAHAN DR., a widening project will temporarily slow traffic on weekdays. This work is expected to be completed by 9/30/2013.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_124</guid>
      <tsw:COUNTY tsw:countyname="47" tsw:countyid="47" tsw:REGION="1"/>
      <tsw:route tsw:segmentid="I-75" tsw:routeid="I-75" tsw:routename="I-75"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="Interstate 75 northbound in Knox County - Between MILE MARKER 110 (Mile Marker: 110) and EXIT 110:  CALLAHAN DR., a widening project will temporarily slow traffic on weekdays. This work is expected to be completed by 9/30/2013." tsw:event_no="539288" tsw:datecreated="04/22/2013 00:00:00" tsw:daterevised="06/03/2013 12:11:36">
        <tsw:BeginDate>04/22/2013 00:00:00</tsw:BeginDate>
        <tsw:EndDate>09/30/2013 00:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[Interstate 75 northbound in Knox County - Between MILE MARKER 110 (Mile Marker: 110) and EXIT 110:  CALLAHAN DR., a widening project will temporarily slow traffic on weekdays. This work is expected to be completed by 9/30/2013.]]></tsw:Description>
        <curract><![CDATA[This project will include the widening of the north bound exit ramp at Callahan road to be completed in three phases. Currently, we are beginning work on phase II of the project which will involve shifting traffic on the ramp to the right lane reducing the exit to one lane by using barrier rail.  ]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>2561512.69980107 620623.721348511</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>36.0216219457158 -83.9945250460961</marker>
    </item>
    <item>
      <title>interstate 81 both directions in greene county - between exit 44:  jearoldstown rd. and mile marker 49 (mile marker: 49), resurfacing work will result in lane closures every day. this work is expected to be completed by 6/30/2013. event </title>
      <link>http://maps.google.com/?q=36.3779340707162 -82.6690838543446(1 - I-81 30 County, - 28-FEB-13 - 30-JUN-13)</link>
      <description>Interstate 81 both directions in Greene County - Between EXIT 44:  JEAROLDSTOWN RD. and MILE MARKER 49 (Mile Marker: 49), resurfacing work will result in lane closures every day. This work is expected to be completed by 6/30/2013.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_125</guid>
      <tsw:COUNTY tsw:countyname="30" tsw:countyid="30" tsw:REGION="1"/>
      <tsw:route tsw:segmentid="I-81" tsw:routeid="I-81" tsw:routename="I-81"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="Interstate 81 both directions in Greene County - Between EXIT 44:  JEAROLDSTOWN RD. and MILE MARKER 49 (Mile Marker: 49), resurfacing work will result in lane closures every day. This work is expected to be completed by 6/30/2013." tsw:event_no="513167" tsw:datecreated="02/28/2013 18:00:00" tsw:daterevised="06/18/2013 14:54:02">
        <tsw:BeginDate>02/28/2013 18:00:00</tsw:BeginDate>
        <tsw:EndDate>06/30/2013 06:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[Interstate 81 both directions in Greene County - Between EXIT 44:  JEAROLDSTOWN RD. and MILE MARKER 49 (Mile Marker: 49), resurfacing work will result in lane closures every day. This work is expected to be completed by 6/30/2013.]]></tsw:Description>
        <curract><![CDATA[Paving operation have begun.  This will result in lane closures from 7:00 p.m. until 6:00 a.m. the next day Sunday night through Friday morning.  Both lanes in both directions will be affected in an alternating pattern.  Motorists should use extreme caution in this area.]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>2948906.45326105 760944.823246372</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>36.3779340707162 -82.6690838543446</marker>
    </item>
    <item>
      <title>state route 12 both directions in davidson county - between sr-6 / us-31-41 (james robertson pkwy.) rt. &amp; lt. and sr-112 / us-41a (clarksville hwy.) rt., resurfacing work will cause temporary lane closures every day. this work is expected to be completed by 6/30/2013. event </title>
      <link>http://maps.google.com/?q=36.1933951388249 -86.8042479867386(1 - SR-12 19 County, - 17-MAR-13 - 30-JUN-13)</link>
      <description>State Route 12 both directions in Davidson County - Between SR-6 / US-31-41 (JAMES ROBERTSON PKWY.) RT. &amp; LT. and SR-112 / US-41A (CLARKSVILLE HWY.) RT., resurfacing work will cause temporary lane closures every day. This work is expected to be completed by 6/30/2013.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_126</guid>
      <tsw:COUNTY tsw:countyname="19" tsw:countyid="19" tsw:REGION="3"/>
      <tsw:route tsw:segmentid="SR-12" tsw:routeid="SR-12" tsw:routename="SR-12"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="State Route 12 both directions in Davidson County - Between SR-6 / US-31-41 (JAMES ROBERTSON PKWY.) RT. &amp;amp; LT. and SR-112 / US-41A (CLARKSVILLE HWY.) RT., resurfacing work will cause temporary lane closures every day. This work is expected to be completed by 6/30/2013." tsw:event_no="527928" tsw:datecreated="03/17/2013 00:00:00" tsw:daterevised="06/12/2013 12:12:52">
        <tsw:BeginDate>03/17/2013 00:00:00</tsw:BeginDate>
        <tsw:EndDate>06/30/2013 00:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[State Route 12 both directions in Davidson County - Between SR-6 / US-31-41 (JAMES ROBERTSON PKWY.) RT. & LT. and SR-112 / US-41A (CLARKSVILLE HWY.) RT., resurfacing work will cause temporary lane closures every day. This work is expected to be completed by 6/30/2013.]]></tsw:Description>
        <curract><![CDATA[Saturday June 15, 8AM-3PM, There will be alternating lane closures on SR 12 in order to perform joint repairs.]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>1731186.25807384 678053.294815515</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>36.1933951388249 -86.8042479867386</marker>
    </item>
    <item>
      <title>state route 78 both directions in dyer county - between sr-104 (w. mcgaughey st.) rt. &amp; (forest st.) lt. and sr-182 (lenox-nauvoo rd.) lt., resurfacing work will cause temporary lane closures every day. this work is expected to be completed by 9/30/2013. event </title>
      <link>http://maps.google.com/?q=36.070672920288 -89.3968274072494(1 - SR-78 23 County, - 08-MAY-13 - 30-SEP-13)</link>
      <description>State Route 78 both directions in Dyer County - Between SR-104 (W. MCGAUGHEY ST.) RT. &amp; (FOREST ST.) LT. and SR-182 (LENOX-NAUVOO RD.) LT., resurfacing work will cause temporary lane closures every day. This work is expected to be completed by 9/30/2013.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_127</guid>
      <tsw:COUNTY tsw:countyname="23" tsw:countyid="23" tsw:REGION="4"/>
      <tsw:route tsw:segmentid="SR-78" tsw:routeid="SR-78" tsw:routename="SR-78"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="State Route 78 both directions in Dyer County - Between SR-104 (W. MCGAUGHEY ST.) RT. &amp;amp; (FOREST ST.) LT. and SR-182 (LENOX-NAUVOO RD.) LT., resurfacing work will cause temporary lane closures every day. This work is expected to be completed by 9/30/2013." tsw:event_no="542948" tsw:datecreated="05/08/2013 00:00:00" tsw:daterevised="06/19/2013 16:28:54">
        <tsw:BeginDate>05/08/2013 00:00:00</tsw:BeginDate>
        <tsw:EndDate>09/30/2013 00:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[State Route 78 both directions in Dyer County - Between SR-104 (W. MCGAUGHEY ST.) RT. & (FOREST ST.) LT. and SR-182 (LENOX-NAUVOO RD.) LT., resurfacing work will cause temporary lane closures every day. This work is expected to be completed by 9/30/2013.]]></tsw:Description>
        <curract><![CDATA[June 19th from 6:00 p.m. to 6:00 a.m June 20th, North and South Bound Lanes will be closed for milling.]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>964819.700769781 649823.118100279</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>36.070672920288 -89.3968274072494</marker>
    </item>
    <item>
      <title>interstate 24 both directions in montgomery county - between mile marker  11 (mile marker: 11) and mile marker  17 (mile marker: 17), resurfacing work will result in lane closures at night. this work is expected to be completed by 6/30/2013. event </title>
      <link>http://maps.google.com/?q=36.494608012989 -87.1738918915692(1 - I-24 63 County, - 01-APR-13 - 30-JUN-13)</link>
      <description>Interstate 24 both directions in Montgomery County - Between MILE MARKER  11 (Mile Marker: 11) and MILE MARKER  17 (Mile Marker: 17), resurfacing work will result in lane closures at night. This work is expected to be completed by 6/30/2013.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_128</guid>
      <tsw:COUNTY tsw:countyname="63" tsw:countyid="63" tsw:REGION="3"/>
      <tsw:route tsw:segmentid="I-24" tsw:routeid="I-24" tsw:routename="I-24"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="Interstate 24 both directions in Montgomery County - Between MILE MARKER  11 (Mile Marker: 11) and MILE MARKER  17 (Mile Marker: 17), resurfacing work will result in lane closures at night. This work is expected to be completed by 6/30/2013." tsw:event_no="513887" tsw:datecreated="04/01/2013 18:00:00" tsw:daterevised="06/03/2013 22:12:15">
        <tsw:BeginDate>04/01/2013 18:00:00</tsw:BeginDate>
        <tsw:EndDate>06/30/2013 06:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[Interstate 24 both directions in Montgomery County - Between MILE MARKER  11 (Mile Marker: 11) and MILE MARKER  17 (Mile Marker: 17), resurfacing work will result in lane closures at night. This work is expected to be completed by 6/30/2013.]]></tsw:Description>
        <curract><![CDATA[Construction on this project continues nightly for paving operations and bridge repair work.  Motorists can expect temporary lane closures nightly from 8:00 PM to 6:00 AM the following morning.  This work will effect both east and west bound I-24 from mile marker 10.62 to 17.02 in Montgomery County, with temporary lane closures in both directions as needed / I-24 reduced to one lane in each direction as needed to perform this work.  Motorists should be alert to changing roadway continues, and contractor personnel and equipment in, or near, the roadway.  In addition, motorists should expect some delays while traveling through this work zone, and seek an alternate route if all possible.  This work is scheduled seven nights per week until this project is complete sometime late June, weather permitting.]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>1623433.14587824 788805.753266879</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>36.494608012989 -87.1738918915692</marker>
    </item>
    <item>
      <title>interstate 65 both directions in marshall county - between mile marker  23 (mile marker: 23) and mile marker  34 (mile marker: 34), resurfacing work will result in lane closures at night. this work is expected to be completed by 7/31/2013. event </title>
      <link>http://maps.google.com/?q=35.392805407091 -86.8786025805721(1 - I-65 59 County, - 15-MAR-13 - 31-JUL-13)</link>
      <description>Interstate 65 both directions in Marshall County - Between MILE MARKER  23 (Mile Marker: 23) and MILE MARKER  34 (Mile Marker: 34), resurfacing work will result in lane closures at night. This work is expected to be completed by 7/31/2013.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_129</guid>
      <tsw:COUNTY tsw:countyname="59" tsw:countyid="59" tsw:REGION="3"/>
      <tsw:route tsw:segmentid="I-65" tsw:routeid="I-65" tsw:routename="I-65"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="Interstate 65 both directions in Marshall County - Between MILE MARKER  23 (Mile Marker: 23) and MILE MARKER  34 (Mile Marker: 34), resurfacing work will result in lane closures at night. This work is expected to be completed by 7/31/2013." tsw:event_no="531007" tsw:datecreated="03/15/2013 00:00:00" tsw:daterevised="06/12/2013 14:17:09">
        <tsw:BeginDate>03/15/2013 00:00:00</tsw:BeginDate>
        <tsw:EndDate>07/31/2013 00:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[Interstate 65 both directions in Marshall County - Between MILE MARKER  23 (Mile Marker: 23) and MILE MARKER  34 (Mile Marker: 34), resurfacing work will result in lane closures at night. This work is expected to be completed by 7/31/2013.]]></tsw:Description>
        <curract><![CDATA[Sunday June 16 through Wednesday June 19,8PM-6AM, There will be one lane closures on I-65 northbound and southbound between MM 22.0 and MM 35.0 for paving operations.  There will be two contractors working simultaneous in both directions.  One lane will remain open in each direction.]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>1706630.42677592 386831.245979864</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>35.392805407091 -86.8786025805721</marker>
    </item>
    <item>
      <title>state route 1(us-70) both directions in benton county - between sr-391 (old hwy-70 w.) lt. and sr-69 (hwy-641 s.) rt. &amp; lt., bridge repair will cause a reduction in lanes from two to one lane every day. this work is expected to be completed by 10/31/2013. event </title>
      <link>http://maps.google.com/?q=36.039775910136 -88.1294969261388(1 - SR-1 03 County, - 07-FEB-13 - 31-OCT-13)</link>
      <description>State Route 1(US-70) both directions in Benton County - Between SR-391 (OLD HWY-70 W.) LT. and SR-69 (HWY-641 S.) RT. &amp; LT., bridge repair will cause a reduction in lanes from two to one lane every day. This work is expected to be completed by 10/31/2013.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_130</guid>
      <tsw:COUNTY tsw:countyname="03" tsw:countyid="03" tsw:REGION="4"/>
      <tsw:route tsw:segmentid="SR-1" tsw:routeid="SR-1" tsw:routename="SR-1"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="State Route 1(US-70) both directions in Benton County - Between SR-391 (OLD HWY-70 W.) LT. and SR-69 (HWY-641 S.) RT. &amp;amp; LT., bridge repair will cause a reduction in lanes from two to one lane every day. This work is expected to be completed by 10/31/2013." tsw:event_no="533227" tsw:datecreated="02/07/2013 00:00:00" tsw:daterevised="06/18/2013 11:05:56">
        <tsw:BeginDate>02/07/2013 00:00:00</tsw:BeginDate>
        <tsw:EndDate>10/31/2013 00:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[State Route 1(US-70) both directions in Benton County - Between SR-391 (OLD HWY-70 W.) LT. and SR-69 (HWY-641 S.) RT. & LT., bridge repair will cause a reduction in lanes from two to one lane every day. This work is expected to be completed by 10/31/2013.]]></tsw:Description>
        <curract><![CDATA[Ongoing work on the repair of the bridge on U.S 70 (S.R. 1) over the C.S.X. Railroad (L.M. 0.59) will cause traffic to be reduced from two lanes to one.  Traffic lights are on site.]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>1338963.78979419 628005.342842156</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>36.039775910136 -88.1294969261388</marker>
    </item>
    <item>
      <title>state route 24 both directions in cumberland county - between i-40 rt. &amp; lt. / center of underpass and sr-1 (hwy-70) rt. / 90 deg. lt. turn, construction work will result in lane closures every day. this work is expected to be completed by 6/30/2014. event </title>
      <link>http://maps.google.com/?q=36.0230924883765 -85.1511113109017(1 - SR-24 18 County, - 08-APR-13 - 30-JUN-14)</link>
      <description>State Route 24 both directions in Cumberland County - Between I-40 RT. &amp; LT. / CENTER OF UNDERPASS and SR-1 (HWY-70) RT. / 90 DEG. LT. TURN, construction work will result in lane closures every day. This work is expected to be completed by 6/30/2014.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_131</guid>
      <tsw:COUNTY tsw:countyname="18" tsw:countyid="18" tsw:REGION="2"/>
      <tsw:route tsw:segmentid="SR-24" tsw:routeid="SR-24" tsw:routename="SR-24"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="State Route 24 both directions in Cumberland County - Between I-40 RT. &amp;amp; LT. / CENTER OF UNDERPASS and SR-1 (HWY-70) RT. / 90 DEG. LT. TURN, construction work will result in lane closures every day. This work is expected to be completed by 6/30/2014." tsw:event_no="534527" tsw:datecreated="04/08/2013 00:00:00" tsw:daterevised="05/30/2013 07:01:00">
        <tsw:BeginDate>04/08/2013 00:00:00</tsw:BeginDate>
        <tsw:EndDate>06/30/2014 00:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[State Route 24 both directions in Cumberland County - Between I-40 RT. & LT. / CENTER OF UNDERPASS and SR-1 (HWY-70) RT. / 90 DEG. LT. TURN, construction work will result in lane closures every day. This work is expected to be completed by 6/30/2014.]]></tsw:Description>
        <curract><![CDATA[  Work continues on this project.  Currently there are no lane closures that will result from this project.  Motorists should be alert for construction vehicles and equipment that may be entering or leaving the jobsite.  Estimated project completion date is June 2014.]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>2219523.51944817 616171.589837251</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>36.0230924883765 -85.1511113109017</marker>
    </item>
    <item>
      <title>state route 22 both directions in obion county - between leave sr-5 w. main st. rt. and leave sr-5 w. main st. rt., resurfacing work will cause temporary lane closures every day. this work is expected to be completed by 7/31/2013. event </title>
      <link>http://maps.google.com/?q=36.4334334598229 -89.0860579588995(1 - SR-22 66 County, - 19-APR-13 - 12-JUN-13)</link>
      <description>State Route 22 both directions in Obion County - Between LEAVE SR-5 W. MAIN ST. RT. and LEAVE SR-5 W. MAIN ST. RT., resurfacing work will cause temporary lane closures every day. This work is expected to be completed by 7/31/2013.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_132</guid>
      <tsw:COUNTY tsw:countyname="66" tsw:countyid="66" tsw:REGION="4"/>
      <tsw:route tsw:segmentid="SR-22" tsw:routeid="SR-22" tsw:routename="SR-22"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="State Route 22 both directions in Obion County - Between LEAVE SR-5 W. MAIN ST. RT. and LEAVE SR-5 W. MAIN ST. RT., resurfacing work will cause temporary lane closures every day. This work is expected to be completed by 7/31/2013." tsw:event_no="534708" tsw:datecreated="04/19/2013 00:00:00" tsw:daterevised="06/17/2013 13:31:28">
        <tsw:BeginDate>04/19/2013 00:00:00</tsw:BeginDate>
        <tsw:EndDate>06/12/2013 00:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[State Route 22 both directions in Obion County - Between LEAVE SR-5 W. MAIN ST. RT. and LEAVE SR-5 W. MAIN ST. RT., resurfacing work will cause temporary lane closures every day. This work is expected to be completed by 7/31/2013.]]></tsw:Description>
        <curract><![CDATA[EAST BOUND INSIDE LANE AT L.M. 0.0 - 3.0 IS CLOSED FOR SCORING.]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>1060776.15934939 778777.221345745</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>36.4334334598229 -89.0860579588995</marker>
    </item>
    <item>
      <title>state route 22 both directions in weakley county - between sr-216 (us/hwy-45e) eb. lns. rt. / {rt. lns. only} and sr-216 (us/hwy-45e) eb. lns. rt. / {rt. lns. only}, resurfacing work will cause temporary lane closures every day. this work is expected to be completed by 7/31/2013. event </title>
      <link>http://maps.google.com/?q=36.3305203579812 -88.8040952555845(1 - SR-22 92 County, - 19-APR-13 - 12-JUN-13)</link>
      <description>State Route 22 both directions in Weakley County - Between SR-216 (US/HWY-45E) EB. LNS. RT. / {RT. LNS. ONLY} and SR-216 (US/HWY-45E) EB. LNS. RT. / {RT. LNS. ONLY}, resurfacing work will cause temporary lane closures every day. This work is expected to be completed by 7/31/2013.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_133</guid>
      <tsw:COUNTY tsw:countyname="92" tsw:countyid="92" tsw:REGION="4"/>
      <tsw:route tsw:segmentid="SR-22" tsw:routeid="SR-22" tsw:routename="SR-22"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="State Route 22 both directions in Weakley County - Between SR-216 (US/HWY-45E) EB. LNS. RT. / {RT. LNS. ONLY} and SR-216 (US/HWY-45E) EB. LNS. RT. / {RT. LNS. ONLY}, resurfacing work will cause temporary lane closures every day. This work is expected to be completed by 7/31/2013." tsw:event_no="534709" tsw:datecreated="04/19/2013 00:00:00" tsw:daterevised="06/17/2013 13:31:44">
        <tsw:BeginDate>04/19/2013 00:00:00</tsw:BeginDate>
        <tsw:EndDate>06/12/2013 00:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[State Route 22 both directions in Weakley County - Between SR-216 (US/HWY-45E) EB. LNS. RT. / {RT. LNS. ONLY} and SR-216 (US/HWY-45E) EB. LNS. RT. / {RT. LNS. ONLY}, resurfacing work will cause temporary lane closures every day. This work is expected to be completed by 7/31/2013.]]></tsw:Description>
        <curract><![CDATA[NO WORK ON PROJECT.]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>1142614.65093315 738830.377478121</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>36.3305203579812 -88.8040952555845</marker>
    </item>
    <item>
      <title>state route 13 both directions in montgomery county - between sr-235 (marion rd.) rt. and pick-up sr-48 (state hwy-48) rt., resurfacing work will cause temporary lane closures on weekdays. this work is expected to be completed by 7/31/2013. event </title>
      <link>http://maps.google.com/?q=36.3877300744508 -87.4024777515398(1 - SR-13 63 County, - 25-APR-13 - 31-JUL-13)</link>
      <description>State Route 13 both directions in Montgomery County - Between SR-235 (MARION RD.) RT. and PICK-UP SR-48 (STATE HWY-48) RT., resurfacing work will cause temporary lane closures on weekdays. This work is expected to be completed by 7/31/2013.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_134</guid>
      <tsw:COUNTY tsw:countyname="63" tsw:countyid="63" tsw:REGION="3"/>
      <tsw:route tsw:segmentid="SR-13" tsw:routeid="SR-13" tsw:routename="SR-13"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="State Route 13 both directions in Montgomery County - Between SR-235 (MARION RD.) RT. and PICK-UP SR-48 (STATE HWY-48) RT., resurfacing work will cause temporary lane closures on weekdays. This work is expected to be completed by 7/31/2013." tsw:event_no="536189" tsw:datecreated="04/25/2013 08:00:00" tsw:daterevised="05/07/2013 16:01:14">
        <tsw:BeginDate>04/25/2013 08:00:00</tsw:BeginDate>
        <tsw:EndDate>07/31/2013 17:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[State Route 13 both directions in Montgomery County - Between SR-235 (MARION RD.) RT. and PICK-UP SR-48 (STATE HWY-48) RT., resurfacing work will cause temporary lane closures on weekdays. This work is expected to be completed by 7/31/2013.]]></tsw:Description>
        <curract><![CDATA[Constuction to resurface State Route 13 in Montgomery County, from Houston County line to junction State Route 48 at Montgomery Central, has begun.  Temporary Lane Closures are necessary during weekdays from 8:00 AM to 5:00 PM daily while this work is in progress.  No Major delays are expected, but motorists should be alert to changing roadway conditions and contractor personnel and equipment in the roadway.  Additional updates to follow as needed.]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>1555686.71458096 750783.488478992</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>36.3877300744508 -87.4024777515398</marker>
    </item>
    <item>
      <title>state route 13 both directions in montgomery county - between leave sr-48 (trenton rd.) lt. and tennessee-kentucky state line, intersection modification work will cause temporary lane closures on weekdays. this work is expected to be completed by 8/31/2013. event </title>
      <link>http://maps.google.com/?q=36.608262664492 -87.2658085446175(1 - SR-13 63 County, - 01-MAY-13 - 30-NOV-13)</link>
      <description>State Route 13 both directions in Montgomery County - Between LEAVE SR-48 (TRENTON RD.) LT. and TENNESSEE-KENTUCKY STATE LINE, intersection modification work will cause temporary lane closures on weekdays. This work is expected to be completed by 8/31/2013.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_135</guid>
      <tsw:COUNTY tsw:countyname="63" tsw:countyid="63" tsw:REGION="3"/>
      <tsw:route tsw:segmentid="SR-13" tsw:routeid="SR-13" tsw:routename="SR-13"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="State Route 13 both directions in Montgomery County - Between LEAVE SR-48 (TRENTON RD.) LT. and TENNESSEE-KENTUCKY STATE LINE, intersection modification work will cause temporary lane closures on weekdays. This work is expected to be completed by 8/31/2013." tsw:event_no="536192" tsw:datecreated="05/01/2013 09:00:00" tsw:daterevised="06/05/2013 10:33:00">
        <tsw:BeginDate>05/01/2013 09:00:00</tsw:BeginDate>
        <tsw:EndDate>11/30/2013 16:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[State Route 13 both directions in Montgomery County - Between LEAVE SR-48 (TRENTON RD.) LT. and TENNESSEE-KENTUCKY STATE LINE, intersection modification work will cause temporary lane closures on weekdays. This work is expected to be completed by 8/31/2013.]]></tsw:Description>
        <curract><![CDATA[Construction to make modifications to the Intersection of State Route 13 with Alfred Thun Road &amp; Cracker Barrel Road will in mid June.  This work will consist of the addition of a new traffic signal and turn lane at Alfred Thun off State Route 13.  Motorists can expect some temporary lane closures on a daily basis as needed to complete this work.  In addition, motorists should be alert to changing roadway conditions and seek an alternate route if all possible - some major delays could be encountered while lane closures are in place.]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>1596950.77491348 830518.608327601</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>36.608262664492 -87.2658085446175</marker>
    </item>
    <item>
      <title>interstate 40 both directions in hickman county - between mile marker 161 (mile marker: 161) and mile marker 163 (mile marker: 163), bridge repair will result in lane closures this weekend. this work is expected to be completed by 8/15/2013. event </title>
      <link>http://maps.google.com/?q=35.9779934964555 -87.5094228538502(1 - I-40 41 County, - 08-APR-13 - 15-AUG-13)</link>
      <description>Interstate 40 both directions in Hickman County - Between MILE MARKER 161 (Mile Marker: 161) and MILE MARKER 163 (Mile Marker: 163), bridge repair will result in lane closures this weekend. This work is expected to be completed by 8/15/2013.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_136</guid>
      <tsw:COUNTY tsw:countyname="41" tsw:countyid="41" tsw:REGION="3"/>
      <tsw:route tsw:segmentid="I-40" tsw:routeid="I-40" tsw:routename="I-40"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="Interstate 40 both directions in Hickman County - Between MILE MARKER 161 (Mile Marker: 161) and MILE MARKER 163 (Mile Marker: 163), bridge repair will result in lane closures this weekend. This work is expected to be completed by 8/15/2013." tsw:event_no="536707" tsw:datecreated="04/08/2013 00:00:00" tsw:daterevised="06/10/2013 07:54:36">
        <tsw:BeginDate>04/08/2013 00:00:00</tsw:BeginDate>
        <tsw:EndDate>08/15/2013 00:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[Interstate 40 both directions in Hickman County - Between MILE MARKER 161 (Mile Marker: 161) and MILE MARKER 163 (Mile Marker: 163), bridge repair will result in lane closures this weekend. This work is expected to be completed by 8/15/2013.]]></tsw:Description>
        <curract><![CDATA[Beginning Friday night (June 14) at 8:00 p.m. and extending through Monday morning at 6:00 a.m. the contractor will close one lane of traffic westbound to do bridge repair work. Expect major delays.]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>1521909.88572115 602109.907520668</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>35.9779934964555 -87.5094228538502</marker>
    </item>
    <item>
      <title>interstate 640 both directions in knox county - between mile marker 5 (mile marker: 5) and i-40 rt. &amp; lt., resurfacing work will cause temporary lane closures weeknights. this work is expected to be completed by 7/31/2013. event </title>
      <link>http://maps.google.com/?q=36.0308096121424 -83.8938799129267(1 - I-640 47 County, - 06-MAY-13 - 31-JUL-13)</link>
      <description>Interstate 640 both directions in Knox County - Between MILE MARKER 5 (Mile Marker: 5) and I-40 RT. &amp; LT., resurfacing work will cause temporary lane closures weeknights. This work is expected to be completed by 7/31/2013.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_137</guid>
      <tsw:COUNTY tsw:countyname="47" tsw:countyid="47" tsw:REGION="1"/>
      <tsw:route tsw:segmentid="I-640" tsw:routeid="I-640" tsw:routename="I-640"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="Interstate 640 both directions in Knox County - Between MILE MARKER 5 (Mile Marker: 5) and I-40 RT. &amp;amp; LT., resurfacing work will cause temporary lane closures weeknights. This work is expected to be completed by 7/31/2013." tsw:event_no="538927" tsw:datecreated="05/06/2013 19:00:00" tsw:daterevised="06/17/2013 12:45:05">
        <tsw:BeginDate>05/06/2013 19:00:00</tsw:BeginDate>
        <tsw:EndDate>07/31/2013 17:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[Interstate 640 both directions in Knox County - Between MILE MARKER 5 (Mile Marker: 5) and I-40 RT. & LT., resurfacing work will cause temporary lane closures weeknights. This work is expected to be completed by 7/31/2013.]]></tsw:Description>
        <curract><![CDATA[The contractor will be temporary closing left and right lanes in both directions to install roadway safety devices and permanent pavement markings. ]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>2591196.6992459 624592.608177256</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>36.0308096121424 -83.8938799129267</marker>
    </item>
    <item>
      <title>interstate 24 both directions in rutherford county - between mile marker 64 (mile marker: 64) and mile marker 96 (mile marker: 96), construction work will result in lane closures at night. this work is expected to be completed by 06/28/2013. event </title>
      <link>http://maps.google.com/?q=35.8259170922194 -86.4119592155449(1 - I-24 75 County, - 13-MAY-13 - 28-JUN-13)</link>
      <description>Interstate 24 both directions in Rutherford County - Between MILE MARKER 64 (Mile Marker: 64) and MILE MARKER 96 (Mile Marker: 96), construction work will result in lane closures at night. This work is expected to be completed by 06/28/2013.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_138</guid>
      <tsw:COUNTY tsw:countyname="75" tsw:countyid="75" tsw:REGION="3"/>
      <tsw:route tsw:segmentid="I-24" tsw:routeid="I-24" tsw:routename="I-24"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="Interstate 24 both directions in Rutherford County - Between MILE MARKER 64 (Mile Marker: 64) and MILE MARKER 96 (Mile Marker: 96), construction work will result in lane closures at night. This work is expected to be completed by 06/28/2013." tsw:event_no="542919" tsw:datecreated="05/13/2013 00:00:00" tsw:daterevised="06/17/2013 13:25:27">
        <tsw:BeginDate>05/13/2013 00:00:00</tsw:BeginDate>
        <tsw:EndDate>06/28/2013 00:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[Interstate 24 both directions in Rutherford County - Between MILE MARKER 64 (Mile Marker: 64) and MILE MARKER 96 (Mile Marker: 96), construction work will result in lane closures at night. This work is expected to be completed by 06/28/2013.]]></tsw:Description>
        <curract><![CDATA[Contractor repairing guardrail at various locations, expect some delays.]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>1846376.906363 543565.095409001</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>35.8259170922194 -86.4119592155449</marker>
    </item>
    <item>
      <title>state route 14 both directions in shelby county - between sr-204 (new covington pk.) rt. &amp; (sgt. walter k. singleton pkwy.) lt. and underpass [79sr0140072]:  sr-385 (paul w. barret memorial pkwy.) eb. lns., bridge repair will cause a reduction in lanes from two to one lane this weekend. this work is expected to be completed by 6/30/2013. event </title>
      <link>http://maps.google.com/?q=35.2716292342326 -89.8591321054149(1 - SR-14 79 County, - 08-MAR-13 - 30-JUN-13)</link>
      <description>State Route 14 both directions in Shelby County - Between SR-204 (NEW COVINGTON PK.) RT. &amp; (SGT. WALTER K. SINGLETON PKWY.) LT. and UNDERPASS [79SR0140072]:  SR-385 (PAUL W. BARRET MEMORIAL PKWY.) EB. LNS., bridge repair will cause a reduction in lanes from two to one lane this weekend. This work is expected to be completed by 6/30/2013.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_139</guid>
      <tsw:COUNTY tsw:countyname="79" tsw:countyid="79" tsw:REGION="4"/>
      <tsw:route tsw:segmentid="SR-14" tsw:routeid="SR-14" tsw:routename="SR-14"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="State Route 14 both directions in Shelby County - Between SR-204 (NEW COVINGTON PK.) RT. &amp;amp; (SGT. WALTER K. SINGLETON PKWY.) LT. and UNDERPASS [79SR0140072]:  SR-385 (PAUL W. BARRET MEMORIAL PKWY.) EB. LNS., bridge repair will cause a reduction in lanes from two to one lane this weekend. This work is expected to be completed by 6/30/2013." tsw:event_no="512207" tsw:datecreated="03/08/2013 00:00:00" tsw:daterevised="05/14/2013 15:40:40">
        <tsw:BeginDate>03/08/2013 00:00:00</tsw:BeginDate>
        <tsw:EndDate>06/30/2013 00:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[State Route 14 both directions in Shelby County - Between SR-204 (NEW COVINGTON PK.) RT. & (SGT. WALTER K. SINGLETON PKWY.) LT. and UNDERPASS [79SR0140072]:  SR-385 (PAUL W. BARRET MEMORIAL PKWY.) EB. LNS., bridge repair will cause a reduction in lanes from two to one lane this weekend. This work is expected to be completed by 6/30/2013.]]></tsw:Description>
        <curract><![CDATA[Temporary signals are in place for weekend work only.  Beginning the weekend of 3/8/13, the temporary signals will be activated for the bridge repair operation.  This condition will only exist on the weekends.  Expect delays.  As an alternate route, use SR 204, Singleton Parkway.]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>816820.386291495 364258.017464273</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>35.2716292342326 -89.8591321054149</marker>
    </item>
    <item>
      <title>state route 3(us-51) both directions in tipton county - between sr-54 (w. pleasant av.) rt. and sr-384 (industrial rd. n.) rt., resurfacing work will cause a reduction in lanes from two to one lane every day. this work is expected to be completed by 7/31/2013. event </title>
      <link>http://maps.google.com/?q=35.572221626835 -89.6454862361607(1 - SR-3 84 County, - 30-APR-13 - 31-JUL-13)</link>
      <description>State Route 3(US-51) both directions in Tipton County - Between SR-54 (W. PLEASANT AV.) RT. and SR-384 (INDUSTRIAL RD. N.) RT., resurfacing work will cause a reduction in lanes from two to one lane every day. This work is expected to be completed by 7/31/2013.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_140</guid>
      <tsw:COUNTY tsw:countyname="84" tsw:countyid="84" tsw:REGION="4"/>
      <tsw:route tsw:segmentid="SR-3" tsw:routeid="SR-3" tsw:routename="SR-3"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="State Route 3(US-51) both directions in Tipton County - Between SR-54 (W. PLEASANT AV.) RT. and SR-384 (INDUSTRIAL RD. N.) RT., resurfacing work will cause a reduction in lanes from two to one lane every day. This work is expected to be completed by 7/31/2013." tsw:event_no="538128" tsw:datecreated="04/30/2013 09:00:00" tsw:daterevised="06/06/2013 16:08:40">
        <tsw:BeginDate>04/30/2013 09:00:00</tsw:BeginDate>
        <tsw:EndDate>07/31/2013 00:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[State Route 3(US-51) both directions in Tipton County - Between SR-54 (W. PLEASANT AV.) RT. and SR-384 (INDUSTRIAL RD. N.) RT., resurfacing work will cause a reduction in lanes from two to one lane every day. This work is expected to be completed by 7/31/2013.]]></tsw:Description>
        <curract><![CDATA[Resurfacing from Hope St. to the Hatchie River on SR-3(US-51) Log mile 18.78 to 22.08.]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>884622.918608223 471151.370956508</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>35.572221626835 -89.6454862361607</marker>
    </item>
    <item>
      <title>interstate 40 both directions in wilson county - between mile marker 225 (mile marker: 225) and exit 232:  sr-109 / gallatin, a widening project will cause temporary lane closures this weekend. this work is expected to be completed by 12/12/2013. event </title>
      <link>http://maps.google.com/?q=36.1764419495894 -86.4697521269064(1 - I-40 95 County, - 23-JAN-12 - 12-DEC-13)</link>
      <description>Interstate 40 both directions in Wilson County - Between MILE MARKER 225 (Mile Marker: 225) and EXIT 232:  SR-109 / GALLATIN, a widening project will cause temporary lane closures this weekend. This work is expected to be completed by 12/12/2013.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_141</guid>
      <tsw:COUNTY tsw:countyname="95" tsw:countyid="95" tsw:REGION="3"/>
      <tsw:route tsw:segmentid="I-40" tsw:routeid="I-40" tsw:routename="I-40"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="Interstate 40 both directions in Wilson County - Between MILE MARKER 225 (Mile Marker: 225) and EXIT 232:  SR-109 / GALLATIN, a widening project will cause temporary lane closures this weekend. This work is expected to be completed by 12/12/2013." tsw:event_no="539148" tsw:datecreated="01/23/2012 00:00:00" tsw:daterevised="06/13/2013 07:33:43">
        <tsw:BeginDate>01/23/2012 00:00:00</tsw:BeginDate>
        <tsw:EndDate>12/12/2013 00:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[Interstate 40 both directions in Wilson County - Between MILE MARKER 225 (Mile Marker: 225) and EXIT 232:  SR-109 / GALLATIN, a widening project will cause temporary lane closures this weekend. This work is expected to be completed by 12/12/2013.]]></tsw:Description>
        <curract><![CDATA[Thursday June 13 through Wednesday June 19, 8PM-5AM, There will be alternating lane closures on I-40 eastbound and westbound for asphalt patching and placement of barrier rail.  One lane will remain open in each direction.]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>1829857.08455517 671239.345450481</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>36.1764419495894 -86.4697521269064</marker>
    </item>
    <item>
      <title>interstate 40 both directions in davidson county - between cheatham-davidson county line and davidson-wilson county line, construction work will result in lane closures at night. this work is expected to be completed by 06/21/2013. event </title>
      <link>http://maps.google.com/?q=36.1694967427259 -86.8111007145674(1 - I-40 19 County, - 17-JUN-13 - 21-JUN-13)</link>
      <description>Interstate 40 both directions in Davidson County - Between CHEATHAM-DAVIDSON COUNTY LINE and DAVIDSON-WILSON COUNTY LINE, construction work will result in lane closures at night. This work is expected to be completed by 06/21/2013.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_142</guid>
      <tsw:COUNTY tsw:countyname="19" tsw:countyid="19" tsw:REGION="3"/>
      <tsw:route tsw:segmentid="I-40" tsw:routeid="I-40" tsw:routename="I-40"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="Interstate 40 both directions in Davidson County - Between CHEATHAM-DAVIDSON COUNTY LINE and DAVIDSON-WILSON COUNTY LINE, construction work will result in lane closures at night. This work is expected to be completed by 06/21/2013." tsw:event_no="540573" tsw:datecreated="06/17/2013 00:00:00" tsw:daterevised="06/17/2013 13:23:48">
        <tsw:BeginDate>06/17/2013 00:00:00</tsw:BeginDate>
        <tsw:EndDate>06/21/2013 00:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[Interstate 40 both directions in Davidson County - Between CHEATHAM-DAVIDSON COUNTY LINE and DAVIDSON-WILSON COUNTY LINE, construction work will result in lane closures at night. This work is expected to be completed by 06/21/2013.]]></tsw:Description>
        <curract><![CDATA[Contractor repairing guardrail at various locations, expect some delays.]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>1729092.13185607 669370.38251134</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>36.1694967427259 -86.8111007145674</marker>
    </item>
    <item>
      <title>interstate 65 both directions in marshall county - between mile marker  23 (mile marker: 23) and mile marker  34 (mile marker: 34), bridge repair will result in lane closures this weekend. this work is expected to be completed by 7/31/2013. event </title>
      <link>http://maps.google.com/?q=35.392805407091 -86.8786025805721(1 - I-65 59 County, - 15-MAR-13 - 31-JUL-13)</link>
      <description>Interstate 65 both directions in Marshall County - Between MILE MARKER  23 (Mile Marker: 23) and MILE MARKER  34 (Mile Marker: 34), bridge repair will result in lane closures this weekend. This work is expected to be completed by 7/31/2013.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_143</guid>
      <tsw:COUNTY tsw:countyname="59" tsw:countyid="59" tsw:REGION="3"/>
      <tsw:route tsw:segmentid="I-65" tsw:routeid="I-65" tsw:routename="I-65"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="Interstate 65 both directions in Marshall County - Between MILE MARKER  23 (Mile Marker: 23) and MILE MARKER  34 (Mile Marker: 34), bridge repair will result in lane closures this weekend. This work is expected to be completed by 7/31/2013." tsw:event_no="539247" tsw:datecreated="03/15/2013 00:00:00" tsw:daterevised="06/06/2013 07:48:24">
        <tsw:BeginDate>03/15/2013 00:00:00</tsw:BeginDate>
        <tsw:EndDate>07/31/2013 00:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[Interstate 65 both directions in Marshall County - Between MILE MARKER  23 (Mile Marker: 23) and MILE MARKER  34 (Mile Marker: 34), bridge repair will result in lane closures this weekend. This work is expected to be completed by 7/31/2013.]]></tsw:Description>
        <curract><![CDATA[Friday June 7, 8PM through Monday June 10, 6AM, There will be one lane closures on I-65 northbound and southbound at MM 22.0 for expansion joint repair.  One lane will remain open in each direction.]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>1706630.42677592 386831.245979864</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>35.392805407091 -86.8786025805721</marker>
    </item>
    <item>
      <title>interstate 40 both directions in haywood county - between exit 60:  sr-19 / mercer rd. and haywood-madison county line, resurfacing work will cause temporary lane closures at night. this work is expected to be completed by 07/31/2013. event </title>
      <link>http://maps.google.com/?q=35.5735223379127 -89.132623994229(1 - I-40 38 County, - 28-APR-13 - 31-JUL-13)</link>
      <description>Interstate 40 both directions in Haywood County - Between EXIT 60:  SR-19 / MERCER RD. and HAYWOOD-MADISON COUNTY LINE, resurfacing work will cause temporary lane closures at night. This work is expected to be completed by 07/31/2013.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_144</guid>
      <tsw:COUNTY tsw:countyname="38" tsw:countyid="38" tsw:REGION="4"/>
      <tsw:route tsw:segmentid="I-40" tsw:routeid="I-40" tsw:routename="I-40"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="Interstate 40 both directions in Haywood County - Between EXIT 60:  SR-19 / MERCER RD. and HAYWOOD-MADISON COUNTY LINE, resurfacing work will cause temporary lane closures at night. This work is expected to be completed by 07/31/2013." tsw:event_no="554929" tsw:datecreated="04/28/2013 19:00:00" tsw:daterevised="06/10/2013 08:31:38">
        <tsw:BeginDate>04/28/2013 19:00:00</tsw:BeginDate>
        <tsw:EndDate>07/31/2013 06:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[Interstate 40 both directions in Haywood County - Between EXIT 60:  SR-19 / MERCER RD. and HAYWOOD-MADISON COUNTY LINE, resurfacing work will cause temporary lane closures at night. This work is expected to be completed by 07/31/2013.]]></tsw:Description>
        <curract><![CDATA[SURFACE PAVING ON THE WESTBOUND OUTSIDE LANE AND EASTBOUND OUTSIDE LANE. HOURS OF CONSTRUCTION OPERATION ARE SUNDAY NIGHT THRU FRIDAY MORNING FROM 7:00 P.M. UNTIL 6:00 A.M.]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>1037066.08378302 466344.064292313</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>35.5735223379127 -89.132623994229</marker>
    </item>
    <item>
      <title>interstate 40 both directions in roane county - between exit 347 / {us-27} / harriman-rockwood and mile marker 348 (mile marker: 348), bridge repair will result in lane closures every day. this work is expected to be completed by 5/5/2014. event </title>
      <link>http://maps.google.com/?q=35.9091932490009 -84.5827763286214(1 - I-40 73 County, - 09-MAR-13 - 05-MAY-14)</link>
      <description>Interstate 40 both directions in Roane County - Between EXIT 347 / {US-27} / HARRIMAN-ROCKWOOD and MILE MARKER 348 (Mile Marker: 348), bridge repair will result in lane closures every day. This work is expected to be completed by 5/5/2014.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_145</guid>
      <tsw:COUNTY tsw:countyname="73" tsw:countyid="73" tsw:REGION="1"/>
      <tsw:route tsw:segmentid="I-40" tsw:routeid="I-40" tsw:routename="I-40"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="Interstate 40 both directions in Roane County - Between EXIT 347 / {US-27} / HARRIMAN-ROCKWOOD and MILE MARKER 348 (Mile Marker: 348), bridge repair will result in lane closures every day. This work is expected to be completed by 5/5/2014." tsw:event_no="513707" tsw:datecreated="03/09/2013 00:00:00" tsw:daterevised="04/03/2013 08:56:11">
        <tsw:BeginDate>03/09/2013 00:00:00</tsw:BeginDate>
        <tsw:EndDate>05/05/2014 00:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[Interstate 40 both directions in Roane County - Between EXIT 347 / {US-27} / HARRIMAN-ROCKWOOD and MILE MARKER 348 (Mile Marker: 348), bridge repair will result in lane closures every day. This work is expected to be completed by 5/5/2014.]]></tsw:Description>
        <curract><![CDATA[Maintaining two lanes of Traffic both EB and WB on I-40 Daytime, with Exit(3rd) lanes closed both directions. Day time lane closures on Hwy 27, SR 29 NB and SB Weekdays. Adding Nite Time lane closures on I-40 EB &amp; WB from 8 pm to 6 am for the following dates 4-3, 4-4, 4-7, 4-8 and 4-9.]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>2388175.9386904 576660.236801692</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>35.9091932490009 -84.5827763286214</marker>
    </item>
    <item>
      <title>state route 135 both directions in putnam county - between white-putnam county line / begin burgess falls rd. and i-40, intersection modification work will cause temporary lane closures on weekdays. this work is expected to be completed by 08/31/2013. event </title>
      <link>http://maps.google.com/?q=36.0952301408468 -85.5789268676989(1 - SR-135 71 County, - 25-MAR-13 - 31-AUG-13)</link>
      <description>State Route 135 both directions in Putnam County - Between WHITE-PUTNAM COUNTY LINE / BEGIN BURGESS FALLS RD. and I-40, intersection modification work will cause temporary lane closures on weekdays. This work is expected to be completed by 08/31/2013.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_146</guid>
      <tsw:COUNTY tsw:countyname="71" tsw:countyid="71" tsw:REGION="2"/>
      <tsw:route tsw:segmentid="SR-135" tsw:routeid="SR-135" tsw:routename="SR-135"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="State Route 135 both directions in Putnam County - Between WHITE-PUTNAM COUNTY LINE / BEGIN BURGESS FALLS RD. and I-40, intersection modification work will cause temporary lane closures on weekdays. This work is expected to be completed by 08/31/2013." tsw:event_no="528968" tsw:datecreated="03/25/2013 00:00:00" tsw:daterevised="04/05/2013 13:13:51">
        <tsw:BeginDate>03/25/2013 00:00:00</tsw:BeginDate>
        <tsw:EndDate>08/31/2013 00:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[State Route 135 both directions in Putnam County - Between WHITE-PUTNAM COUNTY LINE / BEGIN BURGESS FALLS RD. and I-40, intersection modification work will cause temporary lane closures on weekdays. This work is expected to be completed by 08/31/2013.]]></tsw:Description>
        <curract><![CDATA[The improvement of the intersection on S.R. 135 at Ditty Road (L.M. 4.02), including, grading, drainage, and paving. Construction signs have been placed.  The contractor will be performing grade, drainage and paving work which will result in temporary lane closures on weekdays.  Flaggers will be present to direct traffic.  Motorists are encouraged to be alert for construction vehicles and equipment that may be entering or leaving the project.  Estimated project completion date is 8/31/13]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>2092903.05898403 641610.491198162</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>36.0952301408468 -85.5789268676989</marker>
    </item>
    <item>
      <title>interstate 40 both directions in smith county - between mile marker 251 (mile marker: 251) and exit 258 / sr-53 / carthage-gordonsville, bridge repair will result in lane closures this weekend. this work is expected to be completed by 7/31/2013. event </title>
      <link>http://maps.google.com/?q=36.1761799427725 -86.0133831124313(1 - I-40 80 County, - 16-MAY-13 - 31-JUL-13)</link>
      <description>Interstate 40 both directions in Smith County - Between MILE MARKER 251 (Mile Marker: 251) and EXIT 258 / SR-53 / CARTHAGE-GORDONSVILLE, bridge repair will result in lane closures this weekend. This work is expected to be completed by 7/31/2013.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_147</guid>
      <tsw:COUNTY tsw:countyname="80" tsw:countyid="80" tsw:REGION="3"/>
      <tsw:route tsw:segmentid="I-40" tsw:routeid="I-40" tsw:routename="I-40"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="Interstate 40 both directions in Smith County - Between MILE MARKER 251 (Mile Marker: 251) and EXIT 258 / SR-53 / CARTHAGE-GORDONSVILLE, bridge repair will result in lane closures this weekend. This work is expected to be completed by 7/31/2013." tsw:event_no="542988" tsw:datecreated="05/16/2013 00:00:00" tsw:daterevised="06/12/2013 15:43:07">
        <tsw:BeginDate>05/16/2013 00:00:00</tsw:BeginDate>
        <tsw:EndDate>07/31/2013 00:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[Interstate 40 both directions in Smith County - Between MILE MARKER 251 (Mile Marker: 251) and EXIT 258 / SR-53 / CARTHAGE-GORDONSVILLE, bridge repair will result in lane closures this weekend. This work is expected to be completed by 7/31/2013.]]></tsw:Description>
        <curract><![CDATA[Friday June 14, 8PM through Monday June 17, 6AM, There will be alternating lane closures on I-40 in both directions in order to perform bridge deck repairs.]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>1964550.07223035 670811.501765368</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>36.1761799427725 -86.0133831124313</marker>
    </item>
    <item>
      <title>interstate 24 both directions in montgomery county - between mile marker  11 (mile marker: 11) and mile marker  17 (mile marker: 17), resurfacing work will cause temporary lane closures this weekend. this work is expected to be completed by 6/30/2013. event </title>
      <link>http://maps.google.com/?q=36.494608012989 -87.1738918915692(1 - I-24 63 County, - 01-APR-13 - 30-JUN-13)</link>
      <description>Interstate 24 both directions in Montgomery County - Between MILE MARKER  11 (Mile Marker: 11) and MILE MARKER  17 (Mile Marker: 17), resurfacing work will cause temporary lane closures this weekend. This work is expected to be completed by 6/30/2013.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_148</guid>
      <tsw:COUNTY tsw:countyname="63" tsw:countyid="63" tsw:REGION="3"/>
      <tsw:route tsw:segmentid="I-24" tsw:routeid="I-24" tsw:routename="I-24"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="Interstate 24 both directions in Montgomery County - Between MILE MARKER  11 (Mile Marker: 11) and MILE MARKER  17 (Mile Marker: 17), resurfacing work will cause temporary lane closures this weekend. This work is expected to be completed by 6/30/2013." tsw:event_no="536187" tsw:datecreated="04/01/2013 18:00:00" tsw:daterevised="06/03/2013 22:01:40">
        <tsw:BeginDate>04/01/2013 18:00:00</tsw:BeginDate>
        <tsw:EndDate>06/30/2013 06:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[Interstate 24 both directions in Montgomery County - Between MILE MARKER  11 (Mile Marker: 11) and MILE MARKER  17 (Mile Marker: 17), resurfacing work will cause temporary lane closures this weekend. This work is expected to be completed by 6/30/2013.]]></tsw:Description>
        <curract><![CDATA[Construction on this project will continue this coming weekend for paving operations and bridge repair work.  Motorists can expect lane closures starting Friday night at 8:00 PM lasting through Monday morning at 6:00 AM.  This will effect both east and west bound I-24 from mile marker 10.62 to 17.02 in Montgomery County, with temporary lane closures in both directions as needed / I-24 reduced to one lane in each direction as needed to perform this work.  Motorists should be alert to changing roadway continues, and contractor personnel and equipment in, or near, the roadway.  In addition, motorists should expect some delays while traveling through this work zone, and seek an alternate route if all possible.  Additional updates to follow, as needed, as this work progresses.]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>1623433.14587824 788805.753266879</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>36.494608012989 -87.1738918915692</marker>
    </item>
    <item>
      <title>interstate 24 both directions in rutherford county - between exit 66b:  sr-266 / sam ridley pkwy. and mile marker 67 (mile marker: 67.0), construction work will result in lane closures weeknights. this work is expected to be completed by 07/31/2014. event </title>
      <link>http://maps.google.com/?q=35.970340432558 -86.5683654895071(1 - I-24 75 County, - 01-AUG-12 - 31-JUL-14)</link>
      <description>Interstate 24 both directions in Rutherford County - Between EXIT 66B:  SR-266 / SAM RIDLEY PKWY. and MILE MARKER 67 (Mile Marker: 67.0), construction work will result in lane closures weeknights. This work is expected to be completed by 07/31/2014.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_149</guid>
      <tsw:COUNTY tsw:countyname="75" tsw:countyid="75" tsw:REGION="3"/>
      <tsw:route tsw:segmentid="I-24" tsw:routeid="I-24" tsw:routename="I-24"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="Interstate 24 both directions in Rutherford County - Between EXIT 66B:  SR-266 / SAM RIDLEY PKWY. and MILE MARKER 67 (Mile Marker: 67.0), construction work will result in lane closures weeknights. This work is expected to be completed by 07/31/2014." tsw:event_no="555707" tsw:datecreated="08/01/2012 00:00:00" tsw:daterevised="06/12/2013 10:39:08">
        <tsw:BeginDate>08/01/2012 00:00:00</tsw:BeginDate>
        <tsw:EndDate>07/31/2014 00:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[Interstate 24 both directions in Rutherford County - Between EXIT 66B:  SR-266 / SAM RIDLEY PKWY. and MILE MARKER 67 (Mile Marker: 67.0), construction work will result in lane closures weeknights. This work is expected to be completed by 07/31/2014.]]></tsw:Description>
        <curract><![CDATA[Tuesday June 18, 8PM - 10PM, The left lane of I-24 Eastbound and Westbound will be closed at MM 67.0 in order to replace HOV signs.]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>1800316.86616853 596368.449177943</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>35.970340432558 -86.5683654895071</marker>
    </item>
    <item>
      <title>state route 253 both directions in williamson county - between sr-6 / us-31 (franklin rd.) rt. &amp; lt. and sr-252 (wilson pk.) rt. &amp; lt., resurfacing work will cause temporary lane closures every day. this work is expected to be completed by 07/31/2013. event </title>
      <link>http://maps.google.com/?q=35.9972211942176 -86.7940352204038(1 - SR-253 94 County, - 12-JUN-13 - 31-JUL-13)</link>
      <description>State Route 253 both directions in Williamson County - Between SR-6 / US-31 (FRANKLIN RD.) RT. &amp; LT. and SR-252 (WILSON PK.) RT. &amp; LT., resurfacing work will cause temporary lane closures every day. This work is expected to be completed by 07/31/2013.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_150</guid>
      <tsw:COUNTY tsw:countyname="94" tsw:countyid="94" tsw:REGION="3"/>
      <tsw:route tsw:segmentid="SR-253" tsw:routeid="SR-253" tsw:routename="SR-253"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="State Route 253 both directions in Williamson County - Between SR-6 / US-31 (FRANKLIN RD.) RT. &amp;amp; LT. and SR-252 (WILSON PK.) RT. &amp;amp; LT., resurfacing work will cause temporary lane closures every day. This work is expected to be completed by 07/31/2013." tsw:event_no="555750" tsw:datecreated="06/12/2013 00:00:00" tsw:daterevised="06/12/2013 12:10:23">
        <tsw:BeginDate>06/12/2013 00:00:00</tsw:BeginDate>
        <tsw:EndDate>07/31/2013 00:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[State Route 253 both directions in Williamson County - Between SR-6 / US-31 (FRANKLIN RD.) RT. & LT. and SR-252 (WILSON PK.) RT. & LT., resurfacing work will cause temporary lane closures every day. This work is expected to be completed by 07/31/2013.]]></tsw:Description>
        <curract><![CDATA[Thursday June 13 through Wednesday June 19, 8PM-6AM, There will be alternating lane closures in order to work on handicap ramps, sidewalks, and to mill the roadway.]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>1733620.33585616 606618.042303944</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>35.9972211942176 -86.7940352204038</marker>
    </item>
    <item>
      <title>state route 32 both directions in hamblen county - between sr-113 (spencer hale rd.) rt. and e. morris blvd. rt. &amp; sr-34 (e. morris blvd.) lt., intersection modification work will result in a lane shift every day. this work is expected to be completed by 9/30/2014. event </title>
      <link>http://maps.google.com/?q=36.1962587499527 -83.2654052983261(1 - SR-32 32 County, - 16-MAY-13 - 30-SEP-14)</link>
      <description>State Route 32 both directions in Hamblen County - Between SR-113 (SPENCER HALE RD.) RT. and E. MORRIS BLVD. RT. &amp; SR-34 (E. MORRIS BLVD.) LT., intersection modification work will result in a lane shift every day. This work is expected to be completed by 9/30/2014.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_151</guid>
      <tsw:COUNTY tsw:countyname="32" tsw:countyid="32" tsw:REGION="1"/>
      <tsw:route tsw:segmentid="SR-32" tsw:routeid="SR-32" tsw:routename="SR-32"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="State Route 32 both directions in Hamblen County - Between SR-113 (SPENCER HALE RD.) RT. and E. MORRIS BLVD. RT. &amp;amp; SR-34 (E. MORRIS BLVD.) LT., intersection modification work will result in a lane shift every day. This work is expected to be completed by 9/30/2014." tsw:event_no="544608" tsw:datecreated="05/16/2013 00:00:00" tsw:daterevised="06/11/2013 11:37:40">
        <tsw:BeginDate>05/16/2013 00:00:00</tsw:BeginDate>
        <tsw:EndDate>09/30/2014 00:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[State Route 32 both directions in Hamblen County - Between SR-113 (SPENCER HALE RD.) RT. and E. MORRIS BLVD. RT. & SR-34 (E. MORRIS BLVD.) LT., intersection modification work will result in a lane shift every day. This work is expected to be completed by 9/30/2014.]]></tsw:Description>
        <curract><![CDATA[:  Beginning Friday, May 17, 2013, motorists on US 25E (SR 32) should be on alert for a new traffic shift through the construction interchange project at College Park Drive. The traffic pattern switch will move the existing northbound traffic over to the newly constructed northbound lanes. Also included in this traffic pattern switch will be the opening of a new tie road for SR 32 northbound traffic to provide access to the Wal-Mart shopping center and the Walters State Community College campus, with a signalized intersection at the existing Retail Road intersection. All northbound traffic to College Square Mall shall utilize the existing exit ramp to Morris Boulevard (US 11E). No major traffic delays are expected in conjunction with this traffic pattern switch. Motorists should be on alert for this changed condition and use extreme caution in this area.condition and use extreme caution in this area.]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>2775286.40300714 689392.885858081</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>36.1962587499527 -83.2654052983261</marker>
    </item>
    <item>
      <title>interstate 40 both directions in davidson county - between cheatham-davidson county line and davidson-wilson county line, construction work will cause temporary lane closures every day. this work is expected to be completed by 12/31/2013. event </title>
      <link>http://maps.google.com/?q=36.1694967427259 -86.8111007145674(1 - I-40 19 County, - 01-JAN-13 - 31-DEC-13)</link>
      <description>Interstate 40 both directions in Davidson County - Between CHEATHAM-DAVIDSON COUNTY LINE and DAVIDSON-WILSON COUNTY LINE, construction work will cause temporary lane closures every day. This work is expected to be completed by 12/31/2013.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_152</guid>
      <tsw:COUNTY tsw:countyname="19" tsw:countyid="19" tsw:REGION="3"/>
      <tsw:route tsw:segmentid="I-40" tsw:routeid="I-40" tsw:routename="I-40"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="Interstate 40 both directions in Davidson County - Between CHEATHAM-DAVIDSON COUNTY LINE and DAVIDSON-WILSON COUNTY LINE, construction work will cause temporary lane closures every day. This work is expected to be completed by 12/31/2013." tsw:event_no="544368" tsw:datecreated="01/01/2013 00:00:00" tsw:daterevised="06/12/2013 12:35:36">
        <tsw:BeginDate>01/01/2013 00:00:00</tsw:BeginDate>
        <tsw:EndDate>12/31/2013 00:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[Interstate 40 both directions in Davidson County - Between CHEATHAM-DAVIDSON COUNTY LINE and DAVIDSON-WILSON COUNTY LINE, construction work will cause temporary lane closures every day. This work is expected to be completed by 12/31/2013.]]></tsw:Description>
        <curract><![CDATA[Wednesday June 12 through Wednesday June 19 there will be temp. lane closures to repair cable guardrail.]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>1729092.13185607 669370.38251134</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>36.1694967427259 -86.8111007145674</marker>
    </item>
    <item>
      <title>state route 5(us-45w) both directions in gibson county - between sr-366 (james a. hadley sr. hwy.) rt. 90 deg. lt. turn and pick-up sr-76 (22nd av.) rt. / {begin us-45w/70a/79br}, resurfacing work will cause temporary lane closures on weekdays. this work is expected to be completed by 7/31/2013. event </title>
      <link>http://maps.google.com/?q=35.8156939707261 -88.8979575378955(1 - SR-5 27 County, - 20-MAY-13 - 31-JUL-13)</link>
      <description>State Route 5(US-45W) both directions in Gibson County - Between SR-366 (JAMES A. HADLEY SR. HWY.) RT. 90 DEG. LT. TURN and PICK-UP SR-76 (22ND AV.) RT. / {BEGIN US-45W/70A/79BR}, resurfacing work will cause temporary lane closures on weekdays. This work is expected to be completed by 7/31/2013.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_153</guid>
      <tsw:COUNTY tsw:countyname="27" tsw:countyid="27" tsw:REGION="4"/>
      <tsw:route tsw:segmentid="SR-5" tsw:routeid="SR-5" tsw:routename="SR-5"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="State Route 5(US-45W) both directions in Gibson County - Between SR-366 (JAMES A. HADLEY SR. HWY.) RT. 90 DEG. LT. TURN and PICK-UP SR-76 (22ND AV.) RT. / {BEGIN US-45W/70A/79BR}, resurfacing work will cause temporary lane closures on weekdays. This work is expected to be completed by 7/31/2013." tsw:event_no="546587" tsw:datecreated="05/20/2013 06:00:00" tsw:daterevised="06/13/2013 08:25:02">
        <tsw:BeginDate>05/20/2013 06:00:00</tsw:BeginDate>
        <tsw:EndDate>07/31/2013 18:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[State Route 5(US-45W) both directions in Gibson County - Between SR-366 (JAMES A. HADLEY SR. HWY.) RT. 90 DEG. LT. TURN and PICK-UP SR-76 (22ND AV.) RT. / {BEGIN US-45W/70A/79BR}, resurfacing work will cause temporary lane closures on weekdays. This work is expected to be completed by 7/31/2013.]]></tsw:Description>
        <curract><![CDATA[CONTRACTOR IS CURRENTLY MILLING PROJECT FOR RESURFACING. WORKING ON SIGNAL LOOPS AT INTERSECTION OF SR 5 AND SR 76.]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>1109428.89966954 552306.627661006</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>35.8156939707261 -88.8979575378955</marker>
    </item>
    <item>
      <title>state route 268 both directions in rutherford county - between sr-1/ us-41-70s / nw. broad st. rt. &amp; lt. and sr-10 / us-231 memorial blvd. rt. &amp; lt., resurfacing work will cause temporary lane closures every day. this work is expected to be completed by 7/31/2013. event </title>
      <link>http://maps.google.com/?q=35.9048497588193 -86.4152903457752(1 - SR-268 75 County, - 17-APR-13 - 31-JUL-13)</link>
      <description>State Route 268 both directions in Rutherford County - Between SR-1/ US-41-70S / NW. BROAD ST. RT. &amp; LT. and SR-10 / US-231 MEMORIAL BLVD. RT. &amp; LT., resurfacing work will cause temporary lane closures every day. This work is expected to be completed by 7/31/2013.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_154</guid>
      <tsw:COUNTY tsw:countyname="75" tsw:countyid="75" tsw:REGION="3"/>
      <tsw:route tsw:segmentid="SR-268" tsw:routeid="SR-268" tsw:routename="SR-268"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="State Route 268 both directions in Rutherford County - Between SR-1/ US-41-70S / NW. BROAD ST. RT. &amp;amp; LT. and SR-10 / US-231 MEMORIAL BLVD. RT. &amp;amp; LT., resurfacing work will cause temporary lane closures every day. This work is expected to be completed by 7/31/2013." tsw:event_no="533728" tsw:datecreated="04/17/2013 00:00:00" tsw:daterevised="06/06/2013 08:39:55">
        <tsw:BeginDate>04/17/2013 00:00:00</tsw:BeginDate>
        <tsw:EndDate>07/31/2013 00:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[State Route 268 both directions in Rutherford County - Between SR-1/ US-41-70S / NW. BROAD ST. RT. & LT. and SR-10 / US-231 MEMORIAL BLVD. RT. & LT., resurfacing work will cause temporary lane closures every day. This work is expected to be completed by 7/31/2013.]]></tsw:Description>
        <curract><![CDATA[No current activities.]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>1845511.33846402 572301.377573551</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>35.9048497588193 -86.4152903457752</marker>
    </item>
    <item>
      <title>interstate 65 both directions in marshall county - between mile marker  23 (mile marker: 23) and mile marker  34 (mile marker: 34), resurfacing work will result in a lane shift on weekdays. this work is expected to be completed by 7/31/2013. event </title>
      <link>http://maps.google.com/?q=35.392805407091 -86.8786025805721(1 - I-65 59 County, - 15-MAR-13 - 31-JUL-13)</link>
      <description>Interstate 65 both directions in Marshall County - Between MILE MARKER  23 (Mile Marker: 23) and MILE MARKER  34 (Mile Marker: 34), resurfacing work will result in a lane shift on weekdays. This work is expected to be completed by 7/31/2013.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_155</guid>
      <tsw:COUNTY tsw:countyname="59" tsw:countyid="59" tsw:REGION="3"/>
      <tsw:route tsw:segmentid="I-65" tsw:routeid="I-65" tsw:routename="I-65"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="Interstate 65 both directions in Marshall County - Between MILE MARKER  23 (Mile Marker: 23) and MILE MARKER  34 (Mile Marker: 34), resurfacing work will result in a lane shift on weekdays. This work is expected to be completed by 7/31/2013." tsw:event_no="541653" tsw:datecreated="03/15/2013 00:00:00" tsw:daterevised="06/06/2013 07:49:50">
        <tsw:BeginDate>03/15/2013 00:00:00</tsw:BeginDate>
        <tsw:EndDate>07/31/2013 00:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[Interstate 65 both directions in Marshall County - Between MILE MARKER  23 (Mile Marker: 23) and MILE MARKER  34 (Mile Marker: 34), resurfacing work will result in a lane shift on weekdays. This work is expected to be completed by 7/31/2013.]]></tsw:Description>
        <curract><![CDATA[No current activities that will affect traffic at this time. ]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>1706630.42677592 386831.245979864</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>35.392805407091 -86.8786025805721</marker>
    </item>
    <item>
      <title>interstate 440 both directions in davidson county - between mile marker 5 (mile marker: 5.0) and mile marker 7 (mile marker: 7.0), a widening project will result in lane closures this weekend. this work is expected to be completed by 08/31/2013. event </title>
      <link>http://maps.google.com/?q=36.1216293151157 -86.7551036545987(1 - I-440 19 County, - 12-JUN-13 - 31-AUG-13)</link>
      <description>Interstate 440 both directions in Davidson County - Between MILE MARKER 5 (Mile Marker: 5.0) and MILE MARKER 7 (Mile Marker: 7.0), a widening project will result in lane closures this weekend. This work is expected to be completed by 08/31/2013.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_156</guid>
      <tsw:COUNTY tsw:countyname="19" tsw:countyid="19" tsw:REGION="3"/>
      <tsw:route tsw:segmentid="I-440" tsw:routeid="I-440" tsw:routename="I-440"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="Interstate 440 both directions in Davidson County - Between MILE MARKER 5 (Mile Marker: 5.0) and MILE MARKER 7 (Mile Marker: 7.0), a widening project will result in lane closures this weekend. This work is expected to be completed by 08/31/2013." tsw:event_no="555813" tsw:datecreated="06/12/2013 00:00:00" tsw:daterevised="06/12/2013 14:10:21">
        <tsw:BeginDate>06/12/2013 00:00:00</tsw:BeginDate>
        <tsw:EndDate>08/31/2013 00:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[Interstate 440 both directions in Davidson County - Between MILE MARKER 5 (Mile Marker: 5.0) and MILE MARKER 7 (Mile Marker: 7.0), a widening project will result in lane closures this weekend. This work is expected to be completed by 08/31/2013.]]></tsw:Description>
        <curract><![CDATA[Friday June 14, 8PM through Monday June 17, 5AM, The left lane of I-440 eastbound will be closed in order to remove and replace concrete pavement. Also, the ramp from Nolensville Rd. southbound to I-440 eastbound will be closed. 

]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>1745485.67282874 651813.303410919</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>36.1216293151157 -86.7551036545987</marker>
    </item>
    <item>
      <title>state route 222 both directions in fayette county - between sr-59 rt. &amp; lt. / begin &quot;stanton rd.&quot; and fayette-haywood county line, bridge replacement construction will result in lane closures every day. this work is expected to be completed by 4/28/2014. event </title>
      <link>http://maps.google.com/?q=35.3445340020004 -89.4029166634123(1 - SR-222 24 County, - 14-DEC-12 - 28-APR-14)</link>
      <description>State Route 222 both directions in Fayette County - Between SR-59 RT. &amp; LT. / BEGIN &quot;STANTON RD.&quot; and FAYETTE-HAYWOOD COUNTY LINE, bridge replacement construction will result in lane closures every day. This work is expected to be completed by 4/28/2014.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_157</guid>
      <tsw:COUNTY tsw:countyname="24" tsw:countyid="24" tsw:REGION="4"/>
      <tsw:route tsw:segmentid="SR-222" tsw:routeid="SR-222" tsw:routename="SR-222"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="State Route 222 both directions in Fayette County - Between SR-59 RT. &amp;amp; LT. / BEGIN &quot;STANTON RD.&quot; and FAYETTE-HAYWOOD COUNTY LINE, bridge replacement construction will result in lane closures every day. This work is expected to be completed by 4/28/2014." tsw:event_no="549169" tsw:datecreated="12/14/2012 00:00:00" tsw:daterevised="06/17/2013 13:33:10">
        <tsw:BeginDate>12/14/2012 00:00:00</tsw:BeginDate>
        <tsw:EndDate>04/28/2014 00:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[State Route 222 both directions in Fayette County - Between SR-59 RT. & LT. / BEGIN "STANTON RD." and FAYETTE-HAYWOOD COUNTY LINE, bridge replacement construction will result in lane closures every day. This work is expected to be completed by 4/28/2014.]]></tsw:Description>
        <curract><![CDATA[No work on project.]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>953832.580444518 385727.353254193</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>35.3445340020004 -89.4029166634123</marker>
    </item>
    <item>
      <title>interstate 40 both directions in fayette county - between mile marker 42 (mile marker: 42) and exit 42:  sr-222 / stanton / somerville, bridge replacement construction will cause temporary lane closures every day. this work is expected to be completed by 4/28/2014. event </title>
      <link>http://maps.google.com/?q=35.3901826389386 -89.4151335300871(1 - I-40 24 County, - 14-DEC-12 - 28-APR-14)</link>
      <description>Interstate 40 both directions in Fayette County - Between MILE MARKER 42 (Mile Marker: 42) and EXIT 42:  SR-222 / STANTON / SOMERVILLE, bridge replacement construction will cause temporary lane closures every day. This work is expected to be completed by 4/28/2014.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_158</guid>
      <tsw:COUNTY tsw:countyname="24" tsw:countyid="24" tsw:REGION="4"/>
      <tsw:route tsw:segmentid="I-40" tsw:routeid="I-40" tsw:routename="I-40"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="Interstate 40 both directions in Fayette County - Between MILE MARKER 42 (Mile Marker: 42) and EXIT 42:  SR-222 / STANTON / SOMERVILLE, bridge replacement construction will cause temporary lane closures every day. This work is expected to be completed by 4/28/2014." tsw:event_no="549170" tsw:datecreated="12/14/2012 00:00:00" tsw:daterevised="06/17/2013 13:32:35">
        <tsw:BeginDate>12/14/2012 00:00:00</tsw:BeginDate>
        <tsw:EndDate>04/28/2014 00:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[Interstate 40 both directions in Fayette County - Between MILE MARKER 42 (Mile Marker: 42) and EXIT 42:  SR-222 / STANTON / SOMERVILLE, bridge replacement construction will cause temporary lane closures every day. This work is expected to be completed by 4/28/2014.]]></tsw:Description>
        <curract><![CDATA[THERE WILL BE SHOULDER CLOSURES, EASTBOUND AND WESTBOUND AT EXIT 42 FOR THE LENGTH OF THE PROJECT. ALL DRIVING LANES WILL REMAIN OPEN. MOTORIST ARE ADVISED TO USE CAUTION WHEN TRAVELING THROUGH A CONSTRUCTION ZONE.]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>950770.977769188 402459.905141961</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>35.3901826389386 -89.4151335300871</marker>
    </item>
    <item>
      <title>state route 48 both directions in montgomery county - between sr-374 (101st airborne division pkwy.) rt. &amp; lt. and sr-236 (tiny town rd.) lt., maintenance work will intermittently close the roadway on weekdays from 9:00am, 06/17/2013 to 4:00pm, 06/20/2013 (central time zone). event </title>
      <link>http://maps.google.com/?q=36.6011838283118 -87.3157320550164(2 - SR-48 63 County, - 17-JUN-13 - 20-JUN-13)</link>
      <description>State Route 48 both directions in Montgomery County - Between SR-374 (101ST AIRBORNE DIVISION PKWY.) RT. &amp; LT. and SR-236 (TINY TOWN RD.) LT., maintenance work will intermittently close the roadway on weekdays from 9:00AM, 06/17/2013 to 4:00PM, 06/20/2013 (Central Time Zone).</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_159</guid>
      <tsw:COUNTY tsw:countyname="63" tsw:countyid="63" tsw:REGION="3"/>
      <tsw:route tsw:segmentid="SR-48" tsw:routeid="SR-48" tsw:routename="SR-48"/>
      <tsw:EVENT tsw:eventtype="2" tsw:typedescription="State Route 48 both directions in Montgomery County - Between SR-374 (101ST AIRBORNE DIVISION PKWY.) RT. &amp;amp; LT. and SR-236 (TINY TOWN RD.) LT., maintenance work will intermittently close the roadway on weekdays from 9:00AM, 06/17/2013 to 4:00PM, 06/20/2013 (Central Time Zone)." tsw:event_no="557047" tsw:datecreated="06/17/2013 09:00:00" tsw:daterevised="06/14/2013 09:24:54">
        <tsw:BeginDate>06/17/2013 09:00:00</tsw:BeginDate>
        <tsw:EndDate>06/20/2013 16:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[State Route 48 both directions in Montgomery County - Between SR-374 (101ST AIRBORNE DIVISION PKWY.) RT. & LT. and SR-236 (TINY TOWN RD.) LT., maintenance work will intermittently close the roadway on weekdays from 9:00AM, 06/17/2013 to 4:00PM, 06/20/2013 (Central Time Zone).]]></tsw:Description>
        <curract><![CDATA[Monday, June 17 through Thursday, June 20, 9AM-4PM, CDE line construction will intermittently close the roadway in both directions on State Route 48 from Kennedy Lane to Tiny Town Road.]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>1582263.08488955 828134.78349166</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>36.6011838283118 -87.3157320550164</marker>
    </item>
    <item>
      <title>state route 346 both directions in hawkins county - between sr-1 (hwy-11w) rt. &amp; lt. / begin state hwy.346 and sr-1 hwy. 11w rt. &amp; lt. , resurfacing work will cause temporary lane closures every day. this work is expected to be completed by 7/31/2013. event </title>
      <link>http://maps.google.com/?q=36.4699591168536 -82.8519861413304(1 - SR-346 37 County, - 23-MAY-13 - 31-JUL-13)</link>
      <description>State Route 346 both directions in Hawkins County - Between SR-1 (HWY-11W) RT. &amp; LT. / BEGIN STATE HWY.346 and SR-1 HWY. 11W RT. &amp; LT. , resurfacing work will cause temporary lane closures every day. This work is expected to be completed by 7/31/2013.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_160</guid>
      <tsw:COUNTY tsw:countyname="37" tsw:countyid="37" tsw:REGION="1"/>
      <tsw:route tsw:segmentid="SR-346" tsw:routeid="SR-346" tsw:routename="SR-346"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="State Route 346 both directions in Hawkins County - Between SR-1 (HWY-11W) RT. &amp;amp; LT. / BEGIN STATE HWY.346 and SR-1 HWY. 11W RT. &amp;amp; LT. , resurfacing work will cause temporary lane closures every day. This work is expected to be completed by 7/31/2013." tsw:event_no="557227" tsw:datecreated="05/23/2013 00:00:00" tsw:daterevised="06/18/2013 14:53:38">
        <tsw:BeginDate>05/23/2013 00:00:00</tsw:BeginDate>
        <tsw:EndDate>07/31/2013 00:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[State Route 346 both directions in Hawkins County - Between SR-1 (HWY-11W) RT. & LT. / BEGIN STATE HWY.346 and SR-1 HWY. 11W RT. & LT. , resurfacing work will cause temporary lane closures every day. This work is expected to be completed by 7/31/2013.]]></tsw:Description>
        <curract><![CDATA[The contractor will begin erecting construction signs on Monday June 17th.  Paving operations will begin the week of June 24th resulting in alternating lane closures for the duration of the project.  Flaggers will possibly be on site to stop and release traffic.]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>2894013.47682411 792648.567165553</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>36.4699591168536 -82.8519861413304</marker>
    </item>
    <item>
      <title>interstate 40 both directions in jefferson county - between sevier-jefferson county line / begin interstate-40 and mile marker 416 (mile marker: 416), resurfacing work will cause temporary lane closures at night. this work is expected to be completed by 7/31/2013. event </title>
      <link>http://maps.google.com/?q=36.0116745341382 -83.518701491132(1 - I-40 45 County, - 06-NOV-12 - 31-JUL-13)</link>
      <description>Interstate 40 both directions in Jefferson County - Between SEVIER-JEFFERSON COUNTY LINE / BEGIN INTERSTATE-40 and MILE MARKER 416 (Mile Marker: 416), resurfacing work will cause temporary lane closures at night. This work is expected to be completed by 7/31/2013.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_161</guid>
      <tsw:COUNTY tsw:countyname="45" tsw:countyid="45" tsw:REGION="1"/>
      <tsw:route tsw:segmentid="I-40" tsw:routeid="I-40" tsw:routename="I-40"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="Interstate 40 both directions in Jefferson County - Between SEVIER-JEFFERSON COUNTY LINE / BEGIN INTERSTATE-40 and MILE MARKER 416 (Mile Marker: 416), resurfacing work will cause temporary lane closures at night. This work is expected to be completed by 7/31/2013." tsw:event_no="533969" tsw:datecreated="11/06/2012 00:00:00" tsw:daterevised="05/23/2013 18:34:30">
        <tsw:BeginDate>11/06/2012 00:00:00</tsw:BeginDate>
        <tsw:EndDate>07/31/2013 00:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[Interstate 40 both directions in Jefferson County - Between SEVIER-JEFFERSON COUNTY LINE / BEGIN INTERSTATE-40 and MILE MARKER 416 (Mile Marker: 416), resurfacing work will cause temporary lane closures at night. This work is expected to be completed by 7/31/2013.]]></tsw:Description>
        <curract><![CDATA[The contractor has currently started resurfacing operations on the on-ramps and off-ramps of exits 412 and 415. On Sunday, April 28 the contractor will begin paving I-40 between the Sevier County line and extending to east of U.S. 25 West (just past the Exit 415). During this time lane closures will be in effect during the hours of 7 P.M. to 6 A.M. each night, starting Sunday night at 7 P.M. and ending Friday morning at 6 A.M. Motorists are urged to use caution while diving thru the work area and be on the lookout for construction equipment and personnel.  ]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>2702276.78361946 620228.946033925</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>36.0116745341382 -83.518701491132</marker>
    </item>
    <item>
      <title>interstate 40 eastbound in benton county - between exit 133:  sr-191 / birdsong rd. (mile marker: 133) and mile marker 134 (mile marker: 134), construction work will cause temporary lane closures at night. this work is expected to be completed by 8/28/2013. event </title>
      <link>http://maps.google.com/?q=35.8690080920753 -87.9615885099007(1 - I-40 03 County, - 04-SEP-12 - 28-AUG-13)</link>
      <description>Interstate 40 eastbound in Benton County - Between EXIT 133:  SR-191 / BIRDSONG RD. (Mile Marker: 133) and MILE MARKER 134 (Mile Marker: 134), construction work will cause temporary lane closures at night. This work is expected to be completed by 8/28/2013.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_162</guid>
      <tsw:COUNTY tsw:countyname="03" tsw:countyid="03" tsw:REGION="4"/>
      <tsw:route tsw:segmentid="I-40" tsw:routeid="I-40" tsw:routename="I-40"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="Interstate 40 eastbound in Benton County - Between EXIT 133:  SR-191 / BIRDSONG RD. (Mile Marker: 133) and MILE MARKER 134 (Mile Marker: 134), construction work will cause temporary lane closures at night. This work is expected to be completed by 8/28/2013." tsw:event_no="550989" tsw:datecreated="09/04/2012 19:00:00" tsw:daterevised="06/18/2013 11:05:44">
        <tsw:BeginDate>09/04/2012 19:00:00</tsw:BeginDate>
        <tsw:EndDate>08/28/2013 06:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[Interstate 40 eastbound in Benton County - Between EXIT 133:  SR-191 / BIRDSONG RD. (Mile Marker: 133) and MILE MARKER 134 (Mile Marker: 134), construction work will cause temporary lane closures at night. This work is expected to be completed by 8/28/2013.]]></tsw:Description>
        <curract><![CDATA[Beginning Sunday June 23, 2013 at 7:00 P.M. until Friday June 28, 2013 at 6:00 A.M. from MM 133 to MM 135 on I-40, eastbound, ongoing construction work will cause lane closures during nighttime hours.  Construction crew will be paving.]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>1387349.22163573 564817.88030568</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>35.8690080920753 -87.9615885099007</marker>
    </item>
    <item>
      <title>state route 18 both directions in hardeman county - between teague rd. and madison county line, bridge replacement construction will cause a reduction in lanes from two to one lane every day. this work is expected to be completed by 06/30/2015. event </title>
      <link>http://maps.google.com/?q=35.3337884511786 -88.927884395449(1 - SR-18 35 County, - 16-APR-13 - 30-JUN-15)</link>
      <description>State Route 18 both directions in Hardeman County - Between Teague Rd. and Madison County Line, bridge replacement construction will cause a reduction in lanes from two to one lane every day. This work is expected to be completed by 06/30/2015.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_163</guid>
      <tsw:COUNTY tsw:countyname="35" tsw:countyid="35" tsw:REGION="4"/>
      <tsw:route tsw:segmentid="SR-18" tsw:routeid="SR-18" tsw:routename="SR-18"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="State Route 18 both directions in Hardeman County - Between Teague Rd. and Madison County Line, bridge replacement construction will cause a reduction in lanes from two to one lane every day. This work is expected to be completed by 06/30/2015." tsw:event_no="557288" tsw:datecreated="04/16/2013 00:00:00" tsw:daterevised="06/14/2013 14:27:43">
        <tsw:BeginDate>04/16/2013 00:00:00</tsw:BeginDate>
        <tsw:EndDate>06/30/2015 00:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[State Route 18 both directions in Hardeman County - Between Teague Rd. and Madison County Line, bridge replacement construction will cause a reduction in lanes from two to one lane every day. This work is expected to be completed by 06/30/2015.]]></tsw:Description>
        <curract><![CDATA[No current activities. ]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>1095313.0245416 377236.43455337</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>35.3337884511786 -88.927884395449</marker>
    </item>
    <item>
      <title>state route 115 southbound in knox county - between buck karnes bridge over tennessee river (mile marker: 5.3) and topside road (mile marker: 0.9), resurfacing work will cause temporary lane closures every day. this work is expected to be completed by 09/30/2013. event </title>
      <link>http://maps.google.com/?q=35.915647683794 -83.955921257653(1 - SR-115 47 County, - 29-MAY-13 - 30-SEP-13)</link>
      <description>State Route 115 southbound in Knox County - Between Buck Karnes Bridge over Tennessee River (Mile Marker: 5.3) and TOPSIDE ROAD (Mile Marker: 0.9), resurfacing work will cause temporary lane closures every day. This work is expected to be completed by 09/30/2013.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_164</guid>
      <tsw:COUNTY tsw:countyname="47" tsw:countyid="47" tsw:REGION="1"/>
      <tsw:route tsw:segmentid="SR-115" tsw:routeid="SR-115" tsw:routename="SR-115"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="State Route 115 southbound in Knox County - Between Buck Karnes Bridge over Tennessee River (Mile Marker: 5.3) and TOPSIDE ROAD (Mile Marker: 0.9), resurfacing work will cause temporary lane closures every day. This work is expected to be completed by 09/30/2013." tsw:event_no="557408" tsw:datecreated="05/29/2013 00:00:00" tsw:daterevised="06/14/2013 16:42:54">
        <tsw:BeginDate>05/29/2013 00:00:00</tsw:BeginDate>
        <tsw:EndDate>09/30/2013 00:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[State Route 115 southbound in Knox County - Between Buck Karnes Bridge over Tennessee River (Mile Marker: 5.3) and TOPSIDE ROAD (Mile Marker: 0.9), resurfacing work will cause temporary lane closures every day. This work is expected to be completed by 09/30/2013.]]></tsw:Description>
        <curract><![CDATA[Monday, June 16 to Thursday, June19 crew will work on install a new median barrier wall at SB SR115 (Alcoa Hwy) at SR168 (John Sevier Hwy) and begin work on the intersection improvement of Montlake at SB SR115 (Alcoa Hwy).  Motorist should expect lane closures Sunday night.  Watch for slow traffic in these areas.]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>2573731.73094609 582291.722767662</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>35.915647683794 -83.955921257653</marker>
    </item>
    <item>
      <title>interstate 24 both directions in davidson county - between mile marker 32 (mile marker: 32) and mile marker 63 (mile marker: 63), construction work will cause temporary lane closures at night. this work is expected to be completed by 06/28/2013. event </title>
      <link>http://maps.google.com/?q=36.18181650406 -86.7749674733189(1 - I-24 19 County, - 17-JUN-13 - 21-JUN-13)</link>
      <description>Interstate 24 both directions in Davidson County - Between MILE MARKER 32 (Mile Marker: 32) and MILE MARKER 63 (Mile Marker: 63), construction work will cause temporary lane closures at night. This work is expected to be completed by 06/28/2013.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_165</guid>
      <tsw:COUNTY tsw:countyname="19" tsw:countyid="19" tsw:REGION="3"/>
      <tsw:route tsw:segmentid="I-24" tsw:routeid="I-24" tsw:routename="I-24"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="Interstate 24 both directions in Davidson County - Between MILE MARKER 32 (Mile Marker: 32) and MILE MARKER 63 (Mile Marker: 63), construction work will cause temporary lane closures at night. This work is expected to be completed by 06/28/2013." tsw:event_no="553069" tsw:datecreated="06/17/2013 00:00:00" tsw:daterevised="06/19/2013 07:45:01">
        <tsw:BeginDate>06/17/2013 00:00:00</tsw:BeginDate>
        <tsw:EndDate>06/21/2013 00:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[Interstate 24 both directions in Davidson County - Between MILE MARKER 32 (Mile Marker: 32) and MILE MARKER 63 (Mile Marker: 63), construction work will cause temporary lane closures at night. This work is expected to be completed by 06/28/2013.]]></tsw:Description>
        <curract><![CDATA[Contractor repairing guardrail at various locations, expect some delays.]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>1739792.65471155 673768.66126758</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>36.18181650406 -86.7749674733189</marker>
    </item>
    <item>
      <title>state route 424 both directions in carroll county - between sr-22 lexington-clarksburg hwy. rt. &amp; clarksburg-huntingdon hwy. lt.  and sr-114 (hester-cavia rd.) rt. &amp; (yuma-westport rd.) lt., bridge replacement construction will result in lane closures every day. this work is expected to be completed by 5/31/2014. event </title>
      <link>http://maps.google.com/?q=35.8548882967828 -88.3549631126945(1 - SR-424 09 County, - 07-MAY-13 - 31-MAY-14)</link>
      <description>State Route 424 both directions in Carroll County - Between SR-22 LEXINGTON-CLARKSBURG HWY. RT. &amp; CLARKSBURG-HUNTINGDON HWY. LT.  and SR-114 (HESTER-CAVIA RD.) RT. &amp; (YUMA-WESTPORT RD.) LT., bridge replacement construction will result in lane closures every day. This work is expected to be completed by 5/31/2014.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_166</guid>
      <tsw:COUNTY tsw:countyname="09" tsw:countyid="09" tsw:REGION="4"/>
      <tsw:route tsw:segmentid="SR-424" tsw:routeid="SR-424" tsw:routename="SR-424"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="State Route 424 both directions in Carroll County - Between SR-22 LEXINGTON-CLARKSBURG HWY. RT. &amp;amp; CLARKSBURG-HUNTINGDON HWY. LT.  and SR-114 (HESTER-CAVIA RD.) RT. &amp;amp; (YUMA-WESTPORT RD.) LT., bridge replacement construction will result in lane closures every day. This work is expected to be completed by 5/31/2014." tsw:event_no="540961" tsw:datecreated="05/07/2013 00:00:00" tsw:daterevised="06/10/2013 15:37:43">
        <tsw:BeginDate>05/07/2013 00:00:00</tsw:BeginDate>
        <tsw:EndDate>05/31/2014 00:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[State Route 424 both directions in Carroll County - Between SR-22 LEXINGTON-CLARKSBURG HWY. RT. & CLARKSBURG-HUNTINGDON HWY. LT.  and SR-114 (HESTER-CAVIA RD.) RT. & (YUMA-WESTPORT RD.) LT., bridge replacement construction will result in lane closures every day. This work is expected to be completed by 5/31/2014.]]></tsw:Description>
        <curract><![CDATA[Two Bridge replacements on SR424 going into Yuma from Clarksburg (LM 15.7 Yuma Bottom) has began.  Flaggers will be used until a signal system is put in place.  The signal system will reduce traffic to one lane with a 10 foot lane restriction.]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>1270702.89351942 562249.693399501</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>35.8548882967828 -88.3549631126945</marker>
    </item>
    <item>
      <title>state route 32 both directions in grainger county - between sr-375 (lake shore rd.) lt. and sr-131 (thorn hill rd.) rt. &amp; sr-131 lt., resurfacing work will cause temporary lane closures every day. this work is expected to be completed by 08/31/2013. event </title>
      <link>http://maps.google.com/?q=36.3573219971932 -83.3588165314162(1 - SR-32 29 County, - 17-JUN-13 - 31-AUG-13)</link>
      <description>State Route 32 both directions in Grainger County - Between SR-375 (LAKE SHORE RD.) LT. and SR-131 (THORN HILL RD.) RT. &amp; SR-131 LT., resurfacing work will cause temporary lane closures every day. This work is expected to be completed by 08/31/2013.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_167</guid>
      <tsw:COUNTY tsw:countyname="29" tsw:countyid="29" tsw:REGION="1"/>
      <tsw:route tsw:segmentid="SR-32" tsw:routeid="SR-32" tsw:routename="SR-32"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="State Route 32 both directions in Grainger County - Between SR-375 (LAKE SHORE RD.) LT. and SR-131 (THORN HILL RD.) RT. &amp;amp; SR-131 LT., resurfacing work will cause temporary lane closures every day. This work is expected to be completed by 08/31/2013." tsw:event_no="555409" tsw:datecreated="06/17/2013 00:00:00" tsw:daterevised="06/11/2013 11:36:51">
        <tsw:BeginDate>06/17/2013 00:00:00</tsw:BeginDate>
        <tsw:EndDate>08/31/2013 00:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[State Route 32 both directions in Grainger County - Between SR-375 (LAKE SHORE RD.) LT. and SR-131 (THORN HILL RD.) RT. & SR-131 LT., resurfacing work will cause temporary lane closures every day. This work is expected to be completed by 08/31/2013.]]></tsw:Description>
        <curract><![CDATA[Motorists should be alert to the lane closures, construction workers, and equipment. Contractor will be working to resurface SR 32 (US25E).]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>2746151.94013009 747249.232941954</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>36.3573219971932 -83.3588165314162</marker>
    </item>
    <item>
      <title>state route 54 both directions in henry county - between pick-up sr-140 (state hwy-140 n.) lt.  and tennessee-kentucky state line, striping will result in rolling roadblocks every day. this work is expected to be completed by 06/27/2013. event </title>
      <link>http://maps.google.com/?q=36.3260910143693 -88.324070522754(1 - SR-54 40 County, - 20-JUN-13 - 27-JUN-13)</link>
      <description>State Route 54 both directions in Henry County - Between PICK-UP SR-140 (STATE HWY-140 N.) LT.  and TENNESSEE-KENTUCKY STATE LINE, striping will result in rolling roadblocks every day. This work is expected to be completed by 06/27/2013.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_168</guid>
      <tsw:COUNTY tsw:countyname="40" tsw:countyid="40" tsw:REGION="4"/>
      <tsw:route tsw:segmentid="SR-54" tsw:routeid="SR-54" tsw:routename="SR-54"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="State Route 54 both directions in Henry County - Between PICK-UP SR-140 (STATE HWY-140 N.) LT.  and TENNESSEE-KENTUCKY STATE LINE, striping will result in rolling roadblocks every day. This work is expected to be completed by 06/27/2013." tsw:event_no="559269" tsw:datecreated="06/20/2013 00:00:00" tsw:daterevised="06/19/2013 12:23:32">
        <tsw:BeginDate>06/20/2013 00:00:00</tsw:BeginDate>
        <tsw:EndDate>06/27/2013 00:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[State Route 54 both directions in Henry County - Between PICK-UP SR-140 (STATE HWY-140 N.) LT.  and TENNESSEE-KENTUCKY STATE LINE, striping will result in rolling roadblocks every day. This work is expected to be completed by 06/27/2013.]]></tsw:Description>
        <curract><![CDATA[Rolling roadblocks will be in place around highway markings that are being re-striped. Caution should be used around these operations to avoid wet paint.]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>1283927.89807663 733514.142210214</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>36.3260910143693 -88.324070522754</marker>
    </item>
    <item>
      <title>state route 69 both directions in henry county - between sr-218 (state hwy-218 bypass) rt. &amp; lt. and sr-69 (memorial dr.) front &amp; (us/hwy-641 s.) lt., striping will result in rolling roadblocks every day. this work is expected to be completed by 06/27/2013. event </title>
      <link>http://maps.google.com/?q=36.3753943456594 -88.420067611177(1 - SR-69 40 County, - 20-JUN-13 - 27-JUN-13)</link>
      <description>State Route 69 both directions in Henry County - Between SR-218 (STATE HWY-218 BYPASS) RT. &amp; LT. and SR-69 (MEMORIAL DR.) FRONT &amp; (US/HWY-641 S.) LT., striping will result in rolling roadblocks every day. This work is expected to be completed by 06/27/2013.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_169</guid>
      <tsw:COUNTY tsw:countyname="40" tsw:countyid="40" tsw:REGION="4"/>
      <tsw:route tsw:segmentid="SR-69" tsw:routeid="SR-69" tsw:routename="SR-69"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="State Route 69 both directions in Henry County - Between SR-218 (STATE HWY-218 BYPASS) RT. &amp;amp; LT. and SR-69 (MEMORIAL DR.) FRONT &amp;amp; (US/HWY-641 S.) LT., striping will result in rolling roadblocks every day. This work is expected to be completed by 06/27/2013." tsw:event_no="559271" tsw:datecreated="06/20/2013 00:00:00" tsw:daterevised="06/19/2013 12:24:42">
        <tsw:BeginDate>06/20/2013 00:00:00</tsw:BeginDate>
        <tsw:EndDate>06/27/2013 00:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[State Route 69 both directions in Henry County - Between SR-218 (STATE HWY-218 BYPASS) RT. & LT. and SR-69 (MEMORIAL DR.) FRONT & (US/HWY-641 S.) LT., striping will result in rolling roadblocks every day. This work is expected to be completed by 06/27/2013.]]></tsw:Description>
        <curract><![CDATA[Rolling roadblocks will be in place around highway markings that are being re-striped. Caution should be used around these operations to avoid wet paint.]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>1256100.69662967 752143.147909617</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>36.3753943456594 -88.420067611177</marker>
    </item>
    <item>
      <title>state route 69 both directions in henry county - between sr-218 (state hwy-218 bypass) rt. &amp; lt. and sr-69 (memorial dr.) front &amp; (us/hwy-641 s.) lt., striping will result in rolling roadblocks every day. this work is expected to be completed by 06/27/2013. event </title>
      <link>http://maps.google.com/?q=36.3753943456594 -88.420067611177(1 - SR-69 40 County, - 20-JUN-13 - 27-JUN-13)</link>
      <description>State Route 69 both directions in Henry County - Between SR-218 (STATE HWY-218 BYPASS) RT. &amp; LT. and SR-69 (MEMORIAL DR.) FRONT &amp; (US/HWY-641 S.) LT., striping will result in rolling roadblocks every day. This work is expected to be completed by 06/27/2013.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_170</guid>
      <tsw:COUNTY tsw:countyname="40" tsw:countyid="40" tsw:REGION="4"/>
      <tsw:route tsw:segmentid="SR-69" tsw:routeid="SR-69" tsw:routename="SR-69"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="State Route 69 both directions in Henry County - Between SR-218 (STATE HWY-218 BYPASS) RT. &amp;amp; LT. and SR-69 (MEMORIAL DR.) FRONT &amp;amp; (US/HWY-641 S.) LT., striping will result in rolling roadblocks every day. This work is expected to be completed by 06/27/2013." tsw:event_no="559271" tsw:datecreated="06/20/2013 00:00:00" tsw:daterevised="06/19/2013 12:24:42">
        <tsw:BeginDate>06/20/2013 00:00:00</tsw:BeginDate>
        <tsw:EndDate>06/27/2013 00:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[State Route 69 both directions in Henry County - Between SR-218 (STATE HWY-218 BYPASS) RT. & LT. and SR-69 (MEMORIAL DR.) FRONT & (US/HWY-641 S.) LT., striping will result in rolling roadblocks every day. This work is expected to be completed by 06/27/2013.]]></tsw:Description>
        <curract><![CDATA[Rolling roadblocks will be in place around highway markings that are being re-striped. Caution should be used around these operations to avoid wet paint.]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>1296497.18737457 719001.899096729</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>36.3753943456594 -88.420067611177</marker>
    </item>
    <item>
      <title>state route 77 both directions in henry county - between sr-114 (mansfield rd.) rt. and sr-69 (memorial dr.) rt. &amp; (mineral wells dr.) lt., striping will result in rolling roadblocks every day. this work is expected to be completed by 06/27/2013. event </title>
      <link>http://maps.google.com/?q=36.2463430532939 -88.3058923576602(1 - SR-77 40 County, - 20-JUN-13 - 27-JUN-13)</link>
      <description>State Route 77 both directions in Henry County - Between SR-114 (MANSFIELD RD.) RT. and SR-69 (MEMORIAL DR.) RT. &amp; (MINERAL WELLS DR.) LT., striping will result in rolling roadblocks every day. This work is expected to be completed by 06/27/2013.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_171</guid>
      <tsw:COUNTY tsw:countyname="40" tsw:countyid="40" tsw:REGION="4"/>
      <tsw:route tsw:segmentid="SR-77" tsw:routeid="SR-77" tsw:routename="SR-77"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="State Route 77 both directions in Henry County - Between SR-114 (MANSFIELD RD.) RT. and SR-69 (MEMORIAL DR.) RT. &amp;amp; (MINERAL WELLS DR.) LT., striping will result in rolling roadblocks every day. This work is expected to be completed by 06/27/2013." tsw:event_no="559272" tsw:datecreated="06/20/2013 00:00:00" tsw:daterevised="06/19/2013 12:25:35">
        <tsw:BeginDate>06/20/2013 00:00:00</tsw:BeginDate>
        <tsw:EndDate>06/27/2013 00:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[State Route 77 both directions in Henry County - Between SR-114 (MANSFIELD RD.) RT. and SR-69 (MEMORIAL DR.) RT. & (MINERAL WELLS DR.) LT., striping will result in rolling roadblocks every day. This work is expected to be completed by 06/27/2013.]]></tsw:Description>
        <curract><![CDATA[Rolling roadblocks will be in place around highway markings that are being re-striped. Caution should be used around these operations to avoid wet paint.]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>1288597.44651198 704363.459833906</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>36.2463430532939 -88.3058923576602</marker>
    </item>
    <item>
      <title>state route 114 both directions in henry county - between carroll-henry county line / begin vale rd. and sr-77 (state hwy-77) rt. &amp; lt., striping will result in rolling roadblocks every day. this work is expected to be completed by 06/27/2013. event </title>
      <link>http://maps.google.com/?q=36.174138689633 -88.2756142401754(1 - SR-114 40 County, - 20-JUN-13 - 27-JUN-13)</link>
      <description>State Route 114 both directions in Henry County - Between CARROLL-HENRY COUNTY LINE / BEGIN VALE RD. and SR-77 (STATE HWY-77) RT. &amp; LT., striping will result in rolling roadblocks every day. This work is expected to be completed by 06/27/2013.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_172</guid>
      <tsw:COUNTY tsw:countyname="40" tsw:countyid="40" tsw:REGION="4"/>
      <tsw:route tsw:segmentid="SR-114" tsw:routeid="SR-114" tsw:routename="SR-114"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="State Route 114 both directions in Henry County - Between CARROLL-HENRY COUNTY LINE / BEGIN VALE RD. and SR-77 (STATE HWY-77) RT. &amp;amp; LT., striping will result in rolling roadblocks every day. This work is expected to be completed by 06/27/2013." tsw:event_no="559273" tsw:datecreated="06/20/2013 00:00:00" tsw:daterevised="06/19/2013 12:26:21">
        <tsw:BeginDate>06/20/2013 00:00:00</tsw:BeginDate>
        <tsw:EndDate>06/27/2013 00:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[State Route 114 both directions in Henry County - Between CARROLL-HENRY COUNTY LINE / BEGIN VALE RD. and SR-77 (STATE HWY-77) RT. & LT., striping will result in rolling roadblocks every day. This work is expected to be completed by 06/27/2013.]]></tsw:Description>
        <curract><![CDATA[Rolling roadblocks will be in place around highway markings that are being re-striped. Caution should be used around these operations to avoid wet paint.]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>1296912.33664611 677876.333407647</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>36.174138689633 -88.2756142401754</marker>
    </item>
    <item>
      <title>state route 119 both directions in henry county - between sr-76 (us/hwy-79 n.) rt. &amp; lt. / begin state hwy-119 and tennessee-kentucky state line, striping will result in rolling roadblocks every day. this work is expected to be completed by 06/27/2013. event </title>
      <link>http://maps.google.com/?q=36.465339651794 -88.1104659909162(1 - SR-119 40 County, - 20-JUN-13 - 27-JUN-13)</link>
      <description>State Route 119 both directions in Henry County - Between SR-76 (US/HWY-79 N.) RT. &amp; LT. / BEGIN STATE HWY-119 and TENNESSEE-KENTUCKY STATE LINE, striping will result in rolling roadblocks every day. This work is expected to be completed by 06/27/2013.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_173</guid>
      <tsw:COUNTY tsw:countyname="40" tsw:countyid="40" tsw:REGION="4"/>
      <tsw:route tsw:segmentid="SR-119" tsw:routeid="SR-119" tsw:routename="SR-119"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="State Route 119 both directions in Henry County - Between SR-76 (US/HWY-79 N.) RT. &amp;amp; LT. / BEGIN STATE HWY-119 and TENNESSEE-KENTUCKY STATE LINE, striping will result in rolling roadblocks every day. This work is expected to be completed by 06/27/2013." tsw:event_no="559274" tsw:datecreated="06/20/2013 00:00:00" tsw:daterevised="06/19/2013 12:27:09">
        <tsw:BeginDate>06/20/2013 00:00:00</tsw:BeginDate>
        <tsw:EndDate>06/27/2013 00:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[State Route 119 both directions in Henry County - Between SR-76 (US/HWY-79 N.) RT. & LT. / BEGIN STATE HWY-119 and TENNESSEE-KENTUCKY STATE LINE, striping will result in rolling roadblocks every day. This work is expected to be completed by 06/27/2013.]]></tsw:Description>
        <curract><![CDATA[Rolling roadblocks will be in place around highway markings that are being re-striped. Caution should be used around these operations to avoid wet paint.]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>1347929.56382855 782771.853785326</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>36.465339651794 -88.1104659909162</marker>
    </item>
    <item>
      <title>state route 140 both directions in henry county - between sr-22 (state hwy-22 n.) rt. &amp; lt. / begin state hwy-140 s. in mckenzie and sr-76 (us/hwy-79 n.) rt. &amp; lt., striping will result in rolling roadblocks every day. this work is expected to be completed by 06/27/2013. event </title>
      <link>http://maps.google.com/?q=36.4448598505096 -88.4714860158162(1 - SR-140 40 County, - 20-JUN-13 - 27-JUN-13)</link>
      <description>State Route 140 both directions in Henry County - Between SR-22 (STATE HWY-22 N.) RT. &amp; LT. / BEGIN STATE HWY-140 S. IN MCKENZIE and SR-76 (US/HWY-79 N.) RT. &amp; LT., striping will result in rolling roadblocks every day. This work is expected to be completed by 06/27/2013.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_174</guid>
      <tsw:COUNTY tsw:countyname="40" tsw:countyid="40" tsw:REGION="4"/>
      <tsw:route tsw:segmentid="SR-140" tsw:routeid="SR-140" tsw:routename="SR-140"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="State Route 140 both directions in Henry County - Between SR-22 (STATE HWY-22 N.) RT. &amp;amp; LT. / BEGIN STATE HWY-140 S. IN MCKENZIE and SR-76 (US/HWY-79 N.) RT. &amp;amp; LT., striping will result in rolling roadblocks every day. This work is expected to be completed by 06/27/2013." tsw:event_no="559275" tsw:datecreated="06/20/2013 00:00:00" tsw:daterevised="06/19/2013 12:27:58">
        <tsw:BeginDate>06/20/2013 00:00:00</tsw:BeginDate>
        <tsw:EndDate>06/27/2013 00:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[State Route 140 both directions in Henry County - Between SR-22 (STATE HWY-22 N.) RT. & LT. / BEGIN STATE HWY-140 S. IN MCKENZIE and SR-76 (US/HWY-79 N.) RT. & LT., striping will result in rolling roadblocks every day. This work is expected to be completed by 06/27/2013.]]></tsw:Description>
        <curract><![CDATA[Rolling roadblocks will be in place around highway markings that are being re-striped. Caution should be used around these operations to avoid wet paint.]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>1241606.34228346 777803.135781463</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>36.4448598505096 -88.4714860158162</marker>
    </item>
    <item>
      <title>state route 218 both directions in henry county - between sr-54 rt. &amp; lt./ begin hwy. 218 by-pass  and sr-140 (state hwy-140 e.) rt. &amp; lt., striping will result in rolling roadblocks every day. this work is expected to be completed by 06/27/2013. event </title>
      <link>http://maps.google.com/?q=36.2722140843726 -88.2897258159607(1 - SR-218 40 County, - 20-JUN-13 - 27-JUN-13)</link>
      <description>State Route 218 both directions in Henry County - Between SR-54 RT. &amp; LT./ BEGIN HWY. 218 BY-PASS  and SR-140 (STATE HWY-140 E.) RT. &amp; LT., striping will result in rolling roadblocks every day. This work is expected to be completed by 06/27/2013.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_175</guid>
      <tsw:COUNTY tsw:countyname="40" tsw:countyid="40" tsw:REGION="4"/>
      <tsw:route tsw:segmentid="SR-218" tsw:routeid="SR-218" tsw:routename="SR-218"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="State Route 218 both directions in Henry County - Between SR-54 RT. &amp;amp; LT./ BEGIN HWY. 218 BY-PASS  and SR-140 (STATE HWY-140 E.) RT. &amp;amp; LT., striping will result in rolling roadblocks every day. This work is expected to be completed by 06/27/2013." tsw:event_no="559276" tsw:datecreated="06/20/2013 00:00:00" tsw:daterevised="06/19/2013 12:28:52">
        <tsw:BeginDate>06/20/2013 00:00:00</tsw:BeginDate>
        <tsw:EndDate>06/27/2013 00:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[State Route 218 both directions in Henry County - Between SR-54 RT. & LT./ BEGIN HWY. 218 BY-PASS  and SR-140 (STATE HWY-140 E.) RT. & LT., striping will result in rolling roadblocks every day. This work is expected to be completed by 06/27/2013.]]></tsw:Description>
        <curract><![CDATA[Rolling roadblocks will be in place around highway markings that are being re-striped. Caution should be used around these operations to avoid wet paint.]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>1293583.6792272 713667.184122997</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>36.2722140843726 -88.2897258159607</marker>
    </item>
    <item>
      <title>state route 356 both directions in henry county - between sr-69 (s. market st.) rt. &amp; sr-54 (n. market st.) lt. and back / begin e. wood st. in paris and sr-76 (tyson av.) rt. &amp; (e. wood st.) lt., striping will result in rolling roadblocks every day. this work is expected to be completed by 06/27/2013. event </title>
      <link>http://maps.google.com/?q=36.3018167780412 -88.3183530859058(1 - SR-356 40 County, - 20-JUN-13 - 27-JUN-13)</link>
      <description>State Route 356 both directions in Henry County - Between SR-69 (S. MARKET ST.) RT. &amp; SR-54 (N. MARKET ST.) LT. AND BACK / BEGIN E. WOOD ST. IN PARIS and SR-76 (TYSON AV.) RT. &amp; (E. WOOD ST.) LT., striping will result in rolling roadblocks every day. This work is expected to be completed by 06/27/2013.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_176</guid>
      <tsw:COUNTY tsw:countyname="40" tsw:countyid="40" tsw:REGION="4"/>
      <tsw:route tsw:segmentid="SR-356" tsw:routeid="SR-356" tsw:routename="SR-356"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="State Route 356 both directions in Henry County - Between SR-69 (S. MARKET ST.) RT. &amp;amp; SR-54 (N. MARKET ST.) LT. AND BACK / BEGIN E. WOOD ST. IN PARIS and SR-76 (TYSON AV.) RT. &amp;amp; (E. WOOD ST.) LT., striping will result in rolling roadblocks every day. This work is expected to be completed by 06/27/2013." tsw:event_no="559277" tsw:datecreated="06/20/2013 00:00:00" tsw:daterevised="06/19/2013 12:29:43">
        <tsw:BeginDate>06/20/2013 00:00:00</tsw:BeginDate>
        <tsw:EndDate>06/27/2013 00:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[State Route 356 both directions in Henry County - Between SR-69 (S. MARKET ST.) RT. & SR-54 (N. MARKET ST.) LT. AND BACK / BEGIN E. WOOD ST. IN PARIS and SR-76 (TYSON AV.) RT. & (E. WOOD ST.) LT., striping will result in rolling roadblocks every day. This work is expected to be completed by 06/27/2013.]]></tsw:Description>
        <curract><![CDATA[Rolling roadblocks will be in place around highway markings that are being re-striped. Caution should be used around these operations to avoid wet paint.]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>1285402.37790683 724639.616279618</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>36.3018167780412 -88.3183530859058</marker>
    </item>
    <item>
      <title>interstate 65 northbound in davidson county - between mile marker 96 (mile marker: 96.0) and mile marker 97 (mile marker: 97.0), bridge repair will cause a reduction in lanes from two to one lane at night from 8:00pm, 06/19/2013 to 2:00am, 06/20/2013 (central time zone). event </title>
      <link>http://maps.google.com/?q=36.3169743432411 -86.7015026121054(2 - I-65 19 County, - 19-JUN-13 - 20-JUN-13)</link>
      <description>Interstate 65 northbound in Davidson County - Between MILE MARKER 96 (Mile Marker: 96.0) and MILE MARKER 97 (Mile Marker: 97.0), bridge repair will cause a reduction in lanes from two to one lane at night from 8:00PM, 06/19/2013 to 2:00AM, 06/20/2013 (Central Time Zone).</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_177</guid>
      <tsw:COUNTY tsw:countyname="19" tsw:countyid="19" tsw:REGION="3"/>
      <tsw:route tsw:segmentid="I-65" tsw:routeid="I-65" tsw:routename="I-65"/>
      <tsw:EVENT tsw:eventtype="2" tsw:typedescription="Interstate 65 northbound in Davidson County - Between MILE MARKER 96 (Mile Marker: 96.0) and MILE MARKER 97 (Mile Marker: 97.0), bridge repair will cause a reduction in lanes from two to one lane at night from 8:00PM, 06/19/2013 to 2:00AM, 06/20/2013 (Central Time Zone)." tsw:event_no="559407" tsw:datecreated="06/19/2013 20:00:00" tsw:daterevised="06/19/2013 18:55:33">
        <tsw:BeginDate>06/19/2013 20:00:00</tsw:BeginDate>
        <tsw:EndDate>06/20/2013 02:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[Interstate 65 northbound in Davidson County - Between MILE MARKER 96 (Mile Marker: 96.0) and MILE MARKER 97 (Mile Marker: 97.0), bridge repair will cause a reduction in lanes from two to one lane at night from 8:00PM, 06/19/2013 to 2:00AM, 06/20/2013 (Central Time Zone).]]></tsw:Description>
        <curract><![CDATA[No current activities. ]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>1761825.79329193 722807.257473859</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>36.3169743432411 -86.7015026121054</marker>
    </item>
    <item>
      <title>state route 165 both directions in monroe county - between sr-360 (state hwy-360) lt. and tennessee-north carolina state line, maintenance work will cause temporary lane closures at night from 10:00pm, 06/19/2013 to 6:00am, 06/20/2013 (eastern time zone). event </title>
      <link>http://maps.google.com/?q=35.3660534629289 -84.1386372851851(2 - SR-165 62 County, - 19-JUN-13 - 20-JUN-13)</link>
      <description>State Route 165 both directions in Monroe County - Between SR-360 (STATE HWY-360) LT. and TENNESSEE-NORTH CAROLINA STATE LINE, maintenance work will cause temporary lane closures at night from 10:00PM, 06/19/2013 to 6:00AM, 06/20/2013 (Eastern Time Zone).</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_178</guid>
      <tsw:COUNTY tsw:countyname="62" tsw:countyid="62" tsw:REGION="1"/>
      <tsw:route tsw:segmentid="SR-165" tsw:routeid="SR-165" tsw:routename="SR-165"/>
      <tsw:EVENT tsw:eventtype="2" tsw:typedescription="State Route 165 both directions in Monroe County - Between SR-360 (STATE HWY-360) LT. and TENNESSEE-NORTH CAROLINA STATE LINE, maintenance work will cause temporary lane closures at night from 10:00PM, 06/19/2013 to 6:00AM, 06/20/2013 (Eastern Time Zone)." tsw:event_no="559388" tsw:datecreated="06/19/2013 22:00:00" tsw:daterevised="06/19/2013 16:58:54">
        <tsw:BeginDate>06/19/2013 22:00:00</tsw:BeginDate>
        <tsw:EndDate>06/20/2013 06:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[State Route 165 both directions in Monroe County - Between SR-360 (STATE HWY-360) LT. and TENNESSEE-NORTH CAROLINA STATE LINE, maintenance work will cause temporary lane closures at night from 10:00PM, 06/19/2013 to 6:00AM, 06/20/2013 (Eastern Time Zone).]]></tsw:Description>
        <curract><![CDATA[Crews will install snowplowable pavement markers using mobile lane closures at various sections from LM 5.00 to the North Carolina state line.
Watch for slow traffic and workers in the roadway.]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>2523442.74473664 381195.68220665</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>35.3660534629289 -84.1386372851851</marker>
    </item>
    <item>
      <title>state route 177 both directions in shelby county - between germantown city limits and stout road, construction work will cause temporary lane closures every day. this work is expected to be completed by 08/31/2013. event </title>
      <link>http://maps.google.com/?q=35.1433214367073 -89.7954959351062(1 - SR-177 79 County, - 07-JUN-13 - 31-AUG-13)</link>
      <description>State Route 177 both directions in Shelby County - Between Germantown City Limits and Stout Road, construction work will cause temporary lane closures every day. This work is expected to be completed by 08/31/2013.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_179</guid>
      <tsw:COUNTY tsw:countyname="79" tsw:countyid="79" tsw:REGION="4"/>
      <tsw:route tsw:segmentid="SR-177" tsw:routeid="SR-177" tsw:routename="SR-177"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="State Route 177 both directions in Shelby County - Between Germantown City Limits and Stout Road, construction work will cause temporary lane closures every day. This work is expected to be completed by 08/31/2013." tsw:event_no="555010" tsw:datecreated="06/07/2013 00:00:00" tsw:daterevised="06/10/2013 13:39:55">
        <tsw:BeginDate>06/07/2013 00:00:00</tsw:BeginDate>
        <tsw:EndDate>08/31/2013 00:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[State Route 177 both directions in Shelby County - Between Germantown City Limits and Stout Road, construction work will cause temporary lane closures every day. This work is expected to be completed by 08/31/2013.]]></tsw:Description>
        <curract><![CDATA[No current activities. ]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>833990.929345531 316847.324631437</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>35.1433214367073 -89.7954959351062</marker>
    </item>
    <item>
      <title>interstate 40 both directions in jefferson and cocke counties - between  (mile marker: ) and tennessee-north carolina state line, maintenance work will cause temporary lane closures at night from 6:00 pm, 6/19/2013 to 6:00 am, 06/20/2013 (eastern time zone). event </title>
      <link>http://maps.google.com/?q=36.0546179548526 -83.3626196763911(2 - I-40 45 County, - 19-JUN-13 - 20-JUN-13)</link>
      <description>Interstate 40 both directions in Jefferson and Cocke Counties - Between  (Mile Marker: ) and TENNESSEE-NORTH CAROLINA STATE LINE, maintenance work will cause temporary lane closures at night from 6:00 PM, 6/19/2013 to 6:00 AM, 06/20/2013 (Eastern Time Zone).</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_180</guid>
      <tsw:COUNTY tsw:countyname="45" tsw:countyid="45" tsw:REGION="1"/>
      <tsw:route tsw:segmentid="I-40" tsw:routeid="I-40" tsw:routename="I-40"/>
      <tsw:EVENT tsw:eventtype="2" tsw:typedescription="Interstate 40 both directions in Jefferson and Cocke Counties - Between  (Mile Marker: ) and TENNESSEE-NORTH CAROLINA STATE LINE, maintenance work will cause temporary lane closures at night from 6:00 PM, 6/19/2013 to 6:00 AM, 06/20/2013 (Eastern Time Zone)." tsw:event_no="559170" tsw:datecreated="06/19/2013 18:00:00" tsw:daterevised="06/19/2013 15:23:25">
        <tsw:BeginDate>06/19/2013 18:00:00</tsw:BeginDate>
        <tsw:EndDate>06/20/2013 06:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[Interstate 40 both directions in Jefferson and Cocke Counties - Between  (Mile Marker: ) and TENNESSEE-NORTH CAROLINA STATE LINE, maintenance work will cause temporary lane closures at night from 6:00 PM, 6/19/2013 to 6:00 AM, 06/20/2013 (Eastern Time Zone).]]></tsw:Description>
        <curract><![CDATA[Crews will install snowplowable pavement markers using mobile lane closures.
Watch for slow traffic and workers in the roadway.]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>2748001.69015551 637062.721009004</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>36.0546179548526 -83.3626196763911</marker>
    </item>
    <item>
      <title>interstate 40 both directions in jefferson and cocke counties - between  (mile marker: ) and tennessee-north carolina state line, maintenance work will cause temporary lane closures at night from 6:00 pm, 6/19/2013 to 6:00 am, 06/20/2013 (eastern time zone). event </title>
      <link>http://maps.google.com/?q=36.0546179548526 -83.3626196763911(2 - I-40 15 County, - 19-JUN-13 - 20-JUN-13)</link>
      <description>Interstate 40 both directions in Jefferson and Cocke Counties - Between  (Mile Marker: ) and TENNESSEE-NORTH CAROLINA STATE LINE, maintenance work will cause temporary lane closures at night from 6:00 PM, 6/19/2013 to 6:00 AM, 06/20/2013 (Eastern Time Zone).</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_181</guid>
      <tsw:COUNTY tsw:countyname="15" tsw:countyid="15" tsw:REGION="1"/>
      <tsw:route tsw:segmentid="I-40" tsw:routeid="I-40" tsw:routename="I-40"/>
      <tsw:EVENT tsw:eventtype="2" tsw:typedescription="Interstate 40 both directions in Jefferson and Cocke Counties - Between  (Mile Marker: ) and TENNESSEE-NORTH CAROLINA STATE LINE, maintenance work will cause temporary lane closures at night from 6:00 PM, 6/19/2013 to 6:00 AM, 06/20/2013 (Eastern Time Zone)." tsw:event_no="559170" tsw:datecreated="06/19/2013 18:00:00" tsw:daterevised="06/19/2013 15:23:25">
        <tsw:BeginDate>06/19/2013 18:00:00</tsw:BeginDate>
        <tsw:EndDate>06/20/2013 06:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[Interstate 40 both directions in Jefferson and Cocke Counties - Between  (Mile Marker: ) and TENNESSEE-NORTH CAROLINA STATE LINE, maintenance work will cause temporary lane closures at night from 6:00 PM, 6/19/2013 to 6:00 AM, 06/20/2013 (Eastern Time Zone).]]></tsw:Description>
        <curract><![CDATA[Crews will install snowplowable pavement markers using mobile lane closures.
Watch for slow traffic and workers in the roadway.]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>2802213.04459332 572439.167506387</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>36.0546179548526 -83.3626196763911</marker>
    </item>
    <item>
      <title>interstate 24 both directions in hamilton county - between tennessee-georgia state line and i-75 rt. &amp; lt., litter pickup will cause temporary lane closures at night from 4:00am, 06/20/2013 to 6:00am, 06/20/2013 (eastern time zone). event </title>
      <link>http://maps.google.com/?q=34.9831842384331 -85.466811783482(2 - I-24 33 County, - 20-JUN-13 - 20-JUN-13)</link>
      <description>Interstate 24 both directions in Hamilton County - Between TENNESSEE-GEORGIA STATE LINE and I-75 RT. &amp; LT., litter pickup will cause temporary lane closures at night from 4:00AM, 06/20/2013 to 6:00AM, 06/20/2013 (Eastern Time Zone).</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_182</guid>
      <tsw:COUNTY tsw:countyname="33" tsw:countyid="33" tsw:REGION="2"/>
      <tsw:route tsw:segmentid="I-24" tsw:routeid="I-24" tsw:routename="I-24"/>
      <tsw:EVENT tsw:eventtype="2" tsw:typedescription="Interstate 24 both directions in Hamilton County - Between TENNESSEE-GEORGIA STATE LINE and I-75 RT. &amp;amp; LT., litter pickup will cause temporary lane closures at night from 4:00AM, 06/20/2013 to 6:00AM, 06/20/2013 (Eastern Time Zone)." tsw:event_no="559151" tsw:datecreated="06/20/2013 04:00:00" tsw:daterevised="06/19/2013 07:23:56">
        <tsw:BeginDate>06/20/2013 04:00:00</tsw:BeginDate>
        <tsw:EndDate>06/20/2013 06:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[Interstate 24 both directions in Hamilton County - Between TENNESSEE-GEORGIA STATE LINE and I-75 RT. & LT., litter pickup will cause temporary lane closures at night from 4:00AM, 06/20/2013 to 6:00AM, 06/20/2013 (Eastern Time Zone).]]></tsw:Description>
        <curract><![CDATA[Moving Closure, Sweeping Operation.]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>2128231.65116788 236991.324751404</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>34.9831842384331 -85.466811783482</marker>
    </item>
    <item>
      <title>interstate 24 both directions in hamilton county - between tennessee-georgia state line and i-75 rt. &amp; lt., litter pickup will cause temporary lane closures at night from 4:00am, 06/20/2013 to 6:00am, 06/20/2013 (eastern time zone). event </title>
      <link>http://maps.google.com/?q=34.9831842384331 -85.466811783482(2 - I-24 33 County, - 20-JUN-13 - 20-JUN-13)</link>
      <description>Interstate 24 both directions in Hamilton County - Between TENNESSEE-GEORGIA STATE LINE and I-75 RT. &amp; LT., litter pickup will cause temporary lane closures at night from 4:00AM, 06/20/2013 to 6:00AM, 06/20/2013 (Eastern Time Zone).</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_183</guid>
      <tsw:COUNTY tsw:countyname="33" tsw:countyid="33" tsw:REGION="2"/>
      <tsw:route tsw:segmentid="I-24" tsw:routeid="I-24" tsw:routename="I-24"/>
      <tsw:EVENT tsw:eventtype="2" tsw:typedescription="Interstate 24 both directions in Hamilton County - Between TENNESSEE-GEORGIA STATE LINE and I-75 RT. &amp;amp; LT., litter pickup will cause temporary lane closures at night from 4:00AM, 06/20/2013 to 6:00AM, 06/20/2013 (Eastern Time Zone)." tsw:event_no="559151" tsw:datecreated="06/20/2013 04:00:00" tsw:daterevised="06/19/2013 07:23:56">
        <tsw:BeginDate>06/20/2013 04:00:00</tsw:BeginDate>
        <tsw:EndDate>06/20/2013 06:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[Interstate 24 both directions in Hamilton County - Between TENNESSEE-GEORGIA STATE LINE and I-75 RT. & LT., litter pickup will cause temporary lane closures at night from 4:00AM, 06/20/2013 to 6:00AM, 06/20/2013 (Eastern Time Zone).]]></tsw:Description>
        <curract><![CDATA[Moving Closure, Sweeping Operation.]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>2171504.89596205 254289.126248763</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>34.9831842384331 -85.466811783482</marker>
    </item>
    <item>
      <title>interstate 24 both directions in marion county - between mile marker  160 (mile marker: 160.0) and exit 161:  sr-156 / haletown / new hope, litter pickup will cause temporary lane closures at night from 2:00am, 06/20/2013 to 3:00am, 06/20/2013 (central time zone). event </title>
      <link>http://maps.google.com/?q=35.0222299480574 -85.5519579537083(2 - I-24 58 County, - 20-JUN-13 - 20-JUN-13)</link>
      <description>Interstate 24 both directions in Marion County - Between MILE MARKER  160 (Mile Marker: 160.0) and EXIT 161:  SR-156 / HALETOWN / NEW HOPE, litter pickup will cause temporary lane closures at night from 2:00AM, 06/20/2013 to 3:00AM, 06/20/2013 (Central Time Zone).</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_184</guid>
      <tsw:COUNTY tsw:countyname="58" tsw:countyid="58" tsw:REGION="2"/>
      <tsw:route tsw:segmentid="I-24" tsw:routeid="I-24" tsw:routename="I-24"/>
      <tsw:EVENT tsw:eventtype="2" tsw:typedescription="Interstate 24 both directions in Marion County - Between MILE MARKER  160 (Mile Marker: 160.0) and EXIT 161:  SR-156 / HALETOWN / NEW HOPE, litter pickup will cause temporary lane closures at night from 2:00AM, 06/20/2013 to 3:00AM, 06/20/2013 (Central Time Zone)." tsw:event_no="559154" tsw:datecreated="06/20/2013 02:00:00" tsw:daterevised="06/19/2013 07:29:15">
        <tsw:BeginDate>06/20/2013 02:00:00</tsw:BeginDate>
        <tsw:EndDate>06/20/2013 03:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[Interstate 24 both directions in Marion County - Between MILE MARKER  160 (Mile Marker: 160.0) and EXIT 161:  SR-156 / HALETOWN / NEW HOPE, litter pickup will cause temporary lane closures at night from 2:00AM, 06/20/2013 to 3:00AM, 06/20/2013 (Central Time Zone).]]></tsw:Description>
        <curract><![CDATA[Moving Closure, Sweeping Operation.]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>2102658.83125099 251075.82224676</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>35.0222299480574 -85.5519579537083</marker>
    </item>
    <item>
      <title>state route 138 both directions in hardeman county - between sr-138 (mile marker: 0.00) and sr-138 (mile marker: 4.45), resurfacing work will cause a reduction in lanes from two to one lane every day. this work is expected to be completed by 06/26/2013. event </title>
      <link>http://maps.google.com/?q=35.3475812005679 -88.9507253295912(1 - SR-138 35 County, - 20-JUN-13 - 26-JUN-13)</link>
      <description>State Route 138 both directions in Hardeman County - Between SR-138 (Mile Marker: 0.00) and SR-138 (Mile Marker: 4.45), resurfacing work will cause a reduction in lanes from two to one lane every day. This work is expected to be completed by 06/26/2013.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_185</guid>
      <tsw:COUNTY tsw:countyname="35" tsw:countyid="35" tsw:REGION="4"/>
      <tsw:route tsw:segmentid="SR-138" tsw:routeid="SR-138" tsw:routename="SR-138"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="State Route 138 both directions in Hardeman County - Between SR-138 (Mile Marker: 0.00) and SR-138 (Mile Marker: 4.45), resurfacing work will cause a reduction in lanes from two to one lane every day. This work is expected to be completed by 06/26/2013." tsw:event_no="559327" tsw:datecreated="06/20/2013 00:00:00" tsw:daterevised="06/19/2013 14:14:42">
        <tsw:BeginDate>06/20/2013 00:00:00</tsw:BeginDate>
        <tsw:EndDate>06/26/2013 00:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[State Route 138 both directions in Hardeman County - Between SR-138 (Mile Marker: 0.00) and SR-138 (Mile Marker: 4.45), resurfacing work will cause a reduction in lanes from two to one lane every day. This work is expected to be completed by 06/26/2013.]]></tsw:Description>
        <curract><![CDATA[CONTRACT 33420: HARDEMAN COUNTY, STATE ROUTE 138.  THIS IS AN INPLACE RESURFACING PROJECT FROM LOG MILE 0.00 TO LOG MILE 4.45.  THE CONTRACTOR PLANS ON STARTING WORK ON THIS CONTRACT TOMORROW, JUNE 20, 2013 AT APPROXIMATELY 7:00 A.M., AND CONTINUING WORK THROUGH APPROXIMATELY WEDNESDAY, JUNE 26, 2013.  BE WATCHFUL OF PERSONNEL, FLAGMEN AND EQUIPMENT.]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>1088654.54193232 382459.196198752</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>35.3475812005679 -88.9507253295912</marker>
    </item>
    <item>
      <title>state route 27 both directions in marion county - between alabama-tennessee state line / begin us/hwy-72 and i-24 rt. &amp; lt. , litter pickup will cause temporary lane closures at night from 12:00am, 06/20/2013 to 1:00am, 06/20/2013 (central time zone). event </title>
      <link>http://maps.google.com/?q=35.0111593092118 -85.7001303430786(2 - SR-27 58 County, - 20-JUN-13 - 20-JUN-13)</link>
      <description>State Route 27 both directions in Marion County - Between ALABAMA-TENNESSEE STATE LINE / BEGIN US/HWY-72 and I-24 RT. &amp; LT. , litter pickup will cause temporary lane closures at night from 12:00AM, 06/20/2013 to 1:00AM, 06/20/2013 (Central Time Zone).</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_186</guid>
      <tsw:COUNTY tsw:countyname="58" tsw:countyid="58" tsw:REGION="2"/>
      <tsw:route tsw:segmentid="SR-27" tsw:routeid="SR-27" tsw:routename="SR-27"/>
      <tsw:EVENT tsw:eventtype="2" tsw:typedescription="State Route 27 both directions in Marion County - Between ALABAMA-TENNESSEE STATE LINE / BEGIN US/HWY-72 and I-24 RT. &amp;amp; LT. , litter pickup will cause temporary lane closures at night from 12:00AM, 06/20/2013 to 1:00AM, 06/20/2013 (Central Time Zone)." tsw:event_no="559149" tsw:datecreated="06/20/2013 00:00:00" tsw:daterevised="06/19/2013 07:19:17">
        <tsw:BeginDate>06/20/2013 00:00:00</tsw:BeginDate>
        <tsw:EndDate>06/20/2013 01:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[State Route 27 both directions in Marion County - Between ALABAMA-TENNESSEE STATE LINE / BEGIN US/HWY-72 and I-24 RT. & LT. , litter pickup will cause temporary lane closures at night from 12:00AM, 06/20/2013 to 1:00AM, 06/20/2013 (Central Time Zone).]]></tsw:Description>
        <curract><![CDATA[Moving Closure, Sweeping Operation.]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>2058303.56326906 246876.636724638</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>35.0111593092118 -85.7001303430786</marker>
    </item>
    <item>
      <title>interstate 75 both directions in monroe and loudon counties - between mile marker 60 (mile marker: 60.0) and mile marker 74 (mile marker: 74.0), maintenance work will cause temporary lane closures weeknights from 1:00am, 06/21/2013 to 6:00am, 06/21/2013 (eastern time zone). event </title>
      <link>http://maps.google.com/?q=35.6280318636928 -84.4851832923044(2 - I-75 62 County, - 21-JUN-13 - 21-JUN-13)</link>
      <description>Interstate 75 both directions in Monroe and Loudon Counties - Between MILE MARKER 60 (Mile Marker: 60.0) and MILE MARKER 74 (Mile Marker: 74.0), maintenance work will cause temporary lane closures weeknights from 1:00AM, 06/21/2013 to 6:00AM, 06/21/2013 (Eastern Time Zone).</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_187</guid>
      <tsw:COUNTY tsw:countyname="62" tsw:countyid="62" tsw:REGION="1"/>
      <tsw:route tsw:segmentid="I-75" tsw:routeid="I-75" tsw:routename="I-75"/>
      <tsw:EVENT tsw:eventtype="2" tsw:typedescription="Interstate 75 both directions in Monroe and Loudon Counties - Between MILE MARKER 60 (Mile Marker: 60.0) and MILE MARKER 74 (Mile Marker: 74.0), maintenance work will cause temporary lane closures weeknights from 1:00AM, 06/21/2013 to 6:00AM, 06/21/2013 (Eastern Time Zone)." tsw:event_no="559350" tsw:datecreated="06/21/2013 01:00:00" tsw:daterevised="06/19/2013 15:26:01">
        <tsw:BeginDate>06/21/2013 01:00:00</tsw:BeginDate>
        <tsw:EndDate>06/21/2013 06:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[Interstate 75 both directions in Monroe and Loudon Counties - Between MILE MARKER 60 (Mile Marker: 60.0) and MILE MARKER 74 (Mile Marker: 74.0), maintenance work will cause temporary lane closures weeknights from 1:00AM, 06/21/2013 to 6:00AM, 06/21/2013 (Eastern Time Zone).]]></tsw:Description>
        <curract><![CDATA[Crews will install snowplowable pavement markers using mobile lane closures.
Watch for slow traffic and workers in the roadway.]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>2418657.52317414 474761.039523205</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>35.6280318636928 -84.4851832923044</marker>
    </item>
    <item>
      <title>interstate 75 both directions in monroe and loudon counties - between mile marker 60 (mile marker: 60.0) and mile marker 74 (mile marker: 74.0), maintenance work will cause temporary lane closures weeknights from 1:00am, 06/21/2013 to 6:00am, 06/21/2013 (eastern time zone). event </title>
      <link>http://maps.google.com/?q=35.6280318636928 -84.4851832923044(2 - I-75 53 County, - 21-JUN-13 - 21-JUN-13)</link>
      <description>Interstate 75 both directions in Monroe and Loudon Counties - Between MILE MARKER 60 (Mile Marker: 60.0) and MILE MARKER 74 (Mile Marker: 74.0), maintenance work will cause temporary lane closures weeknights from 1:00AM, 06/21/2013 to 6:00AM, 06/21/2013 (Eastern Time Zone).</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_188</guid>
      <tsw:COUNTY tsw:countyname="53" tsw:countyid="53" tsw:REGION="1"/>
      <tsw:route tsw:segmentid="I-75" tsw:routeid="I-75" tsw:routename="I-75"/>
      <tsw:EVENT tsw:eventtype="2" tsw:typedescription="Interstate 75 both directions in Monroe and Loudon Counties - Between MILE MARKER 60 (Mile Marker: 60.0) and MILE MARKER 74 (Mile Marker: 74.0), maintenance work will cause temporary lane closures weeknights from 1:00AM, 06/21/2013 to 6:00AM, 06/21/2013 (Eastern Time Zone)." tsw:event_no="559350" tsw:datecreated="06/21/2013 01:00:00" tsw:daterevised="06/19/2013 15:26:01">
        <tsw:BeginDate>06/21/2013 01:00:00</tsw:BeginDate>
        <tsw:EndDate>06/21/2013 06:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[Interstate 75 both directions in Monroe and Loudon Counties - Between MILE MARKER 60 (Mile Marker: 60.0) and MILE MARKER 74 (Mile Marker: 74.0), maintenance work will cause temporary lane closures weeknights from 1:00AM, 06/21/2013 to 6:00AM, 06/21/2013 (Eastern Time Zone).]]></tsw:Description>
        <curract><![CDATA[Crews will install snowplowable pavement markers using mobile lane closures.
Watch for slow traffic and workers in the roadway.]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>2438541.30222771 505632.848126664</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>35.6280318636928 -84.4851832923044</marker>
    </item>
    <item>
      <title>state route 77 both directions in dyer county - between sr-3 (hwy-51) rt. &amp; lt. and sr-3 (hwy-51) rt. &amp; lt., intersection modification work will cause temporary lane closures every day. this work is expected to be completed by 7/31/2013. event </title>
      <link>http://maps.google.com/?q=36.1214718473171 -89.2812363863647(1 - SR-77 23 County, - 15-FEB-13 - 31-JUL-13)</link>
      <description>State Route 77 both directions in Dyer County - Between SR-3 (HWY-51) RT. &amp; LT. and SR-3 (HWY-51) RT. &amp; LT., intersection modification work will cause temporary lane closures every day. This work is expected to be completed by 7/31/2013.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_189</guid>
      <tsw:COUNTY tsw:countyname="23" tsw:countyid="23" tsw:REGION="4"/>
      <tsw:route tsw:segmentid="SR-77" tsw:routeid="SR-77" tsw:routename="SR-77"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="State Route 77 both directions in Dyer County - Between SR-3 (HWY-51) RT. &amp;amp; LT. and SR-3 (HWY-51) RT. &amp;amp; LT., intersection modification work will cause temporary lane closures every day. This work is expected to be completed by 7/31/2013." tsw:event_no="534707" tsw:datecreated="02/15/2013 00:00:00" tsw:daterevised="06/17/2013 13:33:25">
        <tsw:BeginDate>02/15/2013 00:00:00</tsw:BeginDate>
        <tsw:EndDate>07/31/2013 00:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[State Route 77 both directions in Dyer County - Between SR-3 (HWY-51) RT. & LT. and SR-3 (HWY-51) RT. & LT., intersection modification work will cause temporary lane closures every day. This work is expected to be completed by 7/31/2013.]]></tsw:Description>
        <curract><![CDATA[No work on project.]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>999580.904201664 667139.724344151</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>36.1214718473171 -89.2812363863647</marker>
    </item>
    <item>
      <title>state route 56 both directions in grundy county - between sr-108 (state hwy.108) lt. and grundy-warren county line, drainage work will temporarily slow traffic on weekdays from 7:00am, 06/20/2013 to 3:00pm, 06/26/2013 (central time zone). event </title>
      <link>http://maps.google.com/?q=35.4676983008941 -85.6440697442455(2 - SR-56 31 County, - 20-JUN-13 - 26-JUN-13)</link>
      <description>State Route 56 both directions in Grundy County - Between SR-108 (STATE HWY.108) LT. and GRUNDY-WARREN COUNTY LINE, drainage work will temporarily slow traffic on weekdays from 7:00AM, 06/20/2013 to 3:00PM, 06/26/2013 (Central Time Zone).</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_190</guid>
      <tsw:COUNTY tsw:countyname="31" tsw:countyid="31" tsw:REGION="2"/>
      <tsw:route tsw:segmentid="SR-56" tsw:routeid="SR-56" tsw:routename="SR-56"/>
      <tsw:EVENT tsw:eventtype="2" tsw:typedescription="State Route 56 both directions in Grundy County - Between SR-108 (STATE HWY.108) LT. and GRUNDY-WARREN COUNTY LINE, drainage work will temporarily slow traffic on weekdays from 7:00AM, 06/20/2013 to 3:00PM, 06/26/2013 (Central Time Zone)." tsw:event_no="558371" tsw:datecreated="06/20/2013 07:00:00" tsw:daterevised="06/17/2013 11:11:20">
        <tsw:BeginDate>06/20/2013 07:00:00</tsw:BeginDate>
        <tsw:EndDate>06/26/2013 15:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[State Route 56 both directions in Grundy County - Between SR-108 (STATE HWY.108) LT. and GRUNDY-WARREN COUNTY LINE, drainage work will temporarily slow traffic on weekdays from 7:00AM, 06/20/2013 to 3:00PM, 06/26/2013 (Central Time Zone).]]></tsw:Description>
        <curract><![CDATA[No current activities. ]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>2074487.90202929 413109.051221971</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>35.4676983008941 -85.6440697442455</marker>
    </item>
    <item>
      <title>state route 50 both directions in grundy county - between i-24 /  center of overhead  and sr-108 rt., shoulder work will temporarily slow traffic on weekdays from 7:00am, 06/20/2013 to 3:00pm, 06/26/2013 (central time zone). event </title>
      <link>http://maps.google.com/?q=35.3438100199609 -85.8472930061134(2 - SR-50 31 County, - 20-JUN-13 - 26-JUN-13)</link>
      <description>State Route 50 both directions in Grundy County - Between I-24 /  CENTER OF OVERHEAD  and SR-108 RT., shoulder work will temporarily slow traffic on weekdays from 7:00AM, 06/20/2013 to 3:00PM, 06/26/2013 (Central Time Zone).</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_191</guid>
      <tsw:COUNTY tsw:countyname="31" tsw:countyid="31" tsw:REGION="2"/>
      <tsw:route tsw:segmentid="SR-50" tsw:routeid="SR-50" tsw:routename="SR-50"/>
      <tsw:EVENT tsw:eventtype="2" tsw:typedescription="State Route 50 both directions in Grundy County - Between I-24 /  CENTER OF OVERHEAD  and SR-108 RT., shoulder work will temporarily slow traffic on weekdays from 7:00AM, 06/20/2013 to 3:00PM, 06/26/2013 (Central Time Zone)." tsw:event_no="558372" tsw:datecreated="06/20/2013 07:00:00" tsw:daterevised="06/17/2013 11:13:32">
        <tsw:BeginDate>06/20/2013 07:00:00</tsw:BeginDate>
        <tsw:EndDate>06/26/2013 15:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[State Route 50 both directions in Grundy County - Between I-24 /  CENTER OF OVERHEAD  and SR-108 RT., shoulder work will temporarily slow traffic on weekdays from 7:00AM, 06/20/2013 to 3:00PM, 06/26/2013 (Central Time Zone).]]></tsw:Description>
        <curract><![CDATA[No current activities. ]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>2014043.09992587 367857.338845387</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>35.3438100199609 -85.8472930061134</marker>
    </item>
    <item>
      <title>interstate 24 both directions in grundy county - between exit 127:  sr-50 / pelham-winchester and mile marker 134 (mile marker: 134.0), resurfacing work will cause temporary lane closures on weekdays from 7:00am, 06/20/2013 to 3:00pm, 06/26/2013 (central time zone). event </title>
      <link>http://maps.google.com/?q=35.2614282231121 -85.8775889701202(2 - I-24 31 County, - 20-JUN-13 - 26-JUN-13)</link>
      <description>Interstate 24 both directions in Grundy County - Between EXIT 127:  SR-50 / PELHAM-WINCHESTER and MILE MARKER 134 (Mile Marker: 134.0), resurfacing work will cause temporary lane closures on weekdays from 7:00AM, 06/20/2013 to 3:00PM, 06/26/2013 (Central Time Zone).</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_192</guid>
      <tsw:COUNTY tsw:countyname="31" tsw:countyid="31" tsw:REGION="2"/>
      <tsw:route tsw:segmentid="I-24" tsw:routeid="I-24" tsw:routename="I-24"/>
      <tsw:EVENT tsw:eventtype="2" tsw:typedescription="Interstate 24 both directions in Grundy County - Between EXIT 127:  SR-50 / PELHAM-WINCHESTER and MILE MARKER 134 (Mile Marker: 134.0), resurfacing work will cause temporary lane closures on weekdays from 7:00AM, 06/20/2013 to 3:00PM, 06/26/2013 (Central Time Zone)." tsw:event_no="558373" tsw:datecreated="06/20/2013 07:00:00" tsw:daterevised="06/17/2013 11:16:48">
        <tsw:BeginDate>06/20/2013 07:00:00</tsw:BeginDate>
        <tsw:EndDate>06/26/2013 15:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[Interstate 24 both directions in Grundy County - Between EXIT 127:  SR-50 / PELHAM-WINCHESTER and MILE MARKER 134 (Mile Marker: 134.0), resurfacing work will cause temporary lane closures on weekdays from 7:00AM, 06/20/2013 to 3:00PM, 06/26/2013 (Central Time Zone).]]></tsw:Description>
        <curract><![CDATA[No current activities. ]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>2005045.18958506 337858.301934579</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>35.2614282231121 -85.8775889701202</marker>
    </item>
    <item>
      <title>interstate 40 both directions in putnam county - between exit 273:  sr-56 south / smithville-mcminnville and mile marker 282 (mile marker: 282.0), resurfacing work will cause temporary lane closures every day. this work is expected to be completed by 08/30/2013. event </title>
      <link>http://maps.google.com/?q=36.1288978422095 -85.6685293729951(1 - I-40 71 County, - 24-APR-13 - 30-AUG-13)</link>
      <description>Interstate 40 both directions in Putnam County - Between EXIT 273:  SR-56 SOUTH / SMITHVILLE-MCMINNVILLE and MILE MARKER 282 (Mile Marker: 282.0), resurfacing work will cause temporary lane closures every day. This work is expected to be completed by 08/30/2013.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_193</guid>
      <tsw:COUNTY tsw:countyname="71" tsw:countyid="71" tsw:REGION="2"/>
      <tsw:route tsw:segmentid="I-40" tsw:routeid="I-40" tsw:routename="I-40"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="Interstate 40 both directions in Putnam County - Between EXIT 273:  SR-56 SOUTH / SMITHVILLE-MCMINNVILLE and MILE MARKER 282 (Mile Marker: 282.0), resurfacing work will cause temporary lane closures every day. This work is expected to be completed by 08/30/2013." tsw:event_no="535308" tsw:datecreated="04/24/2013 00:00:00" tsw:daterevised="04/22/2013 10:43:43">
        <tsw:BeginDate>04/24/2013 00:00:00</tsw:BeginDate>
        <tsw:EndDate>08/30/2013 00:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[Interstate 40 both directions in Putnam County - Between EXIT 273:  SR-56 SOUTH / SMITHVILLE-MCMINNVILLE and MILE MARKER 282 (Mile Marker: 282.0), resurfacing work will cause temporary lane closures every day. This work is expected to be completed by 08/30/2013.]]></tsw:Description>
        <curract><![CDATA[Region 2 (Putnam County)  - The resurfacing on I-40 beginning east of S.R. 56 (Exit 273) and extending to east of S.R. 56 (Exit 280), including bridge deck repair.  This will be a continuous operation working on both East and West bound at the same time. This is a night time work operation. Weather permitting; the contractor will have lane closures throughout the project area on weeknights to perform road work.  THP will be present to assist with traffic control.  THP will be present to assist with traffic control.  Lane closures will only be allowed Sunday through Thursday between the hours of 7PM-5AM.  The only exception will be for the bridge deck repair; to perform bridge repair work only a maximum of six (6) weekend closures from 7PM Friday to 5AM Monday will be allowed. Estimated project completion date is 8/30/2013. ]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>2066389.24145549 653764.70602905</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>36.1288978422095 -85.6685293729951</marker>
    </item>
    <item>
      <title>state route 70 both directions in hancock county - between sr-33 kyles ford rd. rt. and sr-33 kyles ford rd. rt., bridge replacement construction will cause temporary lane closures on weekdays. this work is expected to be completed by 1/31/2015. event </title>
      <link>http://maps.google.com/?q=36.5710570739049 -83.043319520058(1 - SR-70 34 County, - 15-APR-13 - 31-JAN-15)</link>
      <description>State Route 70 both directions in Hancock County - Between SR-33 KYLES FORD RD. RT. and SR-33 KYLES FORD RD. RT., bridge replacement construction will cause temporary lane closures on weekdays. This work is expected to be completed by 1/31/2015.</description>
      <guid isPermaLink="false">764581AF5103482EB7209EDBF6EC0F5E_194</guid>
      <tsw:COUNTY tsw:countyname="34" tsw:countyid="34" tsw:REGION="1"/>
      <tsw:route tsw:segmentid="SR-70" tsw:routeid="SR-70" tsw:routename="SR-70"/>
      <tsw:EVENT tsw:eventtype="1" tsw:typedescription="State Route 70 both directions in Hancock County - Between SR-33 KYLES FORD RD. RT. and SR-33 KYLES FORD RD. RT., bridge replacement construction will cause temporary lane closures on weekdays. This work is expected to be completed by 1/31/2015." tsw:event_no="535213" tsw:datecreated="04/15/2013 00:00:00" tsw:daterevised="06/11/2013 11:30:36">
        <tsw:BeginDate>04/15/2013 00:00:00</tsw:BeginDate>
        <tsw:EndDate>01/31/2015 00:00:00</tsw:EndDate>
        <tsw:Description><![CDATA[State Route 70 both directions in Hancock County - Between SR-33 KYLES FORD RD. RT. and SR-33 KYLES FORD RD. RT., bridge replacement construction will cause temporary lane closures on weekdays. This work is expected to be completed by 1/31/2015.]]></tsw:Description>
        <curract><![CDATA[Motorists should be alert to construction activities. Currently, the contractor is working to excavate large quantities of rock, which will require blasting. Be alert to signs and construction personel.]]></curract>
      </tsw:EVENT>
      <georss:where>
        <gml:Point>
          <gml:pos>2836667.47231236 827684.796794455</gml:pos>
        </gml:Point>
      </georss:where>
      <marker>36.5710570739049 -83.043319520058</marker>
    </item>
  </channel>
</rss>
