Project Description
The purpose of the project is to improve the roadway, provide route continuity and correct existing route deficiencies including geometrics (vertical and Horizontal) and operations. In addition, implementing this project is considered necessary to serve the existing and future traffic demands on this section of the State Route 62.
Other benefits of the proposed action include:
Route continuity by widening the existing two lane road to match existing four lane sections on each end of the project.General Location Map (Project Limits)

Click here for larger pdf view
f
A Public Meeting was conducted on January 17, 2012. (Public Meeting Presentation) pdf