News Release

For immediate release.

December 19, 2007

 

The Tennessee Department of Transportation has selected the following firms to provide Design Engineering Services as described in the Design Division’s August 5, 2007, Advertisement.

 

 

 

No.

County

Route

Description

Length

(mi.)

Scope of Work

1

Shelby

I-40

From SR-177 (Germantown Road) to 1.0 Mile East of Canada Road    

 

4.5

Survey, Road Design and Geotechnical Investigations

Firm Name

Allen & Hoshall, Inc   

 

 

 

2

Shelby

I-40

From 1.0 Mile East of Canada Road to SR-205 (Collierville-Arlington Road)

4.0 

Survey, Road Design and  Geotechnical Investigations

Firm Name

Buchart Horn, Inc.

 

 

3

Shelby – Tipton

I-69

From 0.2 Mile South of Shelby Road to 0.6 Mile North of Simmons Road incl. 2 interchanges & 1 rest area

5.8

 

Survey, Road Design and Geotechnical Investigations

 

 

Firm Name

Tetra Tech, Inc.

 

 

4

Tipton

I-69

From 0.6 Mile North of Simmons Road to 0.5 Mile North of State Route 178 incl. 1 interchange.

5.3

Survey, Road Design and Geotechnical Investigations

 

Firm Name

Geotech Engineering & Testing, Inc.

 

5

Tipton

I-69

From 0.5 Mile North of State Route 178 to 0.6 Mile North of Atkins Store Road incl. 1 interchange & 1 weigh station

4.8

 

Survey, Road Design and Geotechnical Investigations

 

 

Firm Name

Civil Design Group, Inc

 

 

 

6

 

Tipton

 

I-69

From 0.6 Mile North of Atkins Store Road to 0.5 Mile North of State Route 59 incl. 1 interchange

 

6.1

 

Survey, Road Design and Geotechnical Investigations

 

 

Firm Name

 

Pickering Firm, Inc.

             

 

 

7

Tipton

I-69

From 0.5 Mile North of SR-59 to Leigh’s Chapel Road incl. 1 interchange and interchange connector at U.S. 51

5.9

Survey, Road Design and Geotechnical Investigations

 

Firm Name

Palmer Engineering Co.

 

 
 

GFN/JJ/RB